High Speed Rail (London – West Midlands) Bill: Instruction (No. 3) Debate
Full Debate: Read Full DebateAndy Slaughter
Main Page: Andy Slaughter (Labour - Hammersmith and Chiswick)Department Debates - View all Andy Slaughter's debates with the Department for Transport
(9 years, 5 months ago)
Commons ChamberThey will have no effect at all on the journey times. This is about delivering the project by and large as planned. HS2 is more about capacity than it is about journey times. This is about addressing the real capacity issues that we have on our rail network, particularly between Birmingham and London.
The most significant other change concerns the Heathrow Express depot. It is currently located at Old Oak Common, but it needs to be relocated in order to construct the new Old Oak Common station. It was originally intended to be moved to another site nearby, but more detailed operational work undertaken by Network Rail since the Bill’s deposit has revealed that that site would not work operationally. We therefore propose to relocate the depot to a site in Langley, near Slough.
Will the Minister shed more light on his statement that this “would not work operationally”? What I have heard on the grapevine, which has been my only source of information, is that there is more potential to make money out of the Old Oak site than out of the Langley site, and so Network Rail wants a depot out and more commercial development in.
We looked closely at the North Pole depot site, but the Langley site is operationally more effective, and it also means that we would not block any proposal that might come forward for the Great Western line to connect with Crossrail at terminal 5.
I support HS2 and the potential for jobs, homes and regeneration in the Old Oak Common area in my constituency. I even appreciate some of the difficulties that everyone, from the Minister down, has with this scheme—not least because Old Oak itself must be one of the most complex as well as the largest development sites in London, and possibly in the country. It involves not only HS2, but Crossrail, Overground, the Great Western main line and, of course, the commercial and residential developments. The Minister will anticipate a “but” coming here.
The first I knew of some of these proposals was when I picked up the additional provision document yesterday, certainly in respect of the relocation of the Heathrow Express depot to Langley. That does not feature. Perhaps it is thought that it is more significant for my right hon. Friend the Member for Slough (Fiona Mactaggart), where it is going, rather than for me, from where it is being removed. Nevertheless, these are—as acknowledged by HS2 itself—significant changes. Indeed, I received an email today from HS2, saying:
“I understand there is a motion tabled for debate tomorrow on changes along the proposed HS2 route, including some substantial changes to the Old Oak Common area.”
It went on to mention
“three turnback sidings for the Crossrail service and passive provision for a West Coast Main Line Crossrail link”,
which I shall return to in a moment. It referred to the need to acquire additional land
“for the diversion of a sewer…for the construction of a temporary logistics tunnel…for…a construction compound…for…a conveyer route”,
and, as an afterthought, to the relocation of the depot. There is a public meeting on Saturday, which I cannot attend, advertised to my constituents, but no mention is made of some of these changes taking place.
It is right to say that some prior notice of the west coast main line-Crossrail link was given. HS2 was very clear to me that this was not an HS2 project, but a Crossrail project. Crossrail was very clear to me that it was not really part of the Crossrail scheme either. As the hon. Member for Milton Keynes South (Iain Stewart) said, it is a temporary measure to deal with the construction phase. It must be the most expensive “diversion” ever in the history of the country. I am not quite sure exactly how many millions of pounds it is costing. It may be a nice adornment to the railway network, but nothing more than that. During the construction and when it is built, it is certainly going to cause very severe disruption.
As I say, I do not object to the proposals, and I am sympathetic to the difficulties of the logistics of the task, but I do find that HS2 acts in a vacuum and often in a way that does not appear to take account of anything else going on around it—and that includes other railways. I am pleased to have one of the country’s major interchanges in my constituency, but the way things are going at the moment, it is going to be a dog’s breakfast of an interchange. I missed the speech of my right hon. Friend the Member for Slough, but I suspect she asked why she was getting the depot rather than it being in Shepherd’s Bush. I suspect that the real answer—the Minister cites purely logistical reasons—is that it is better to put it somewhere where prices are probably a little cheaper than in Shepherd’s Bush.
I will give way to the Minister in a moment. There will be room for more of “Boris’s mini-Manhattans”, which is what we will be graced with: these sky-high blocks of flats—all of which are empty, all of which are sold overseas and all of which are safe deposit boxes for dirty money from abroad—that will loom over Wormwood Scrubs for the foreseeable future.
I think the Minister needs to come in on this.
I wish that that were the cheapest option. We considered a number of options including North Pole East, the Crossrail depot, Reading, Southall, Ealing and Langley. Langley was the best option, as all the others involved operational issues, but it was certainly not the cheapest .
I realise that the Minister is reading from his brief, and that he cannot be expected to know every single detail of all the immaculate plans that are in the document. However, those who are in the middle of this—and a very large part of my constituency is being developed: it is the largest development site in London—are genuinely worried. I plead with the Minister to talk to his colleagues in the Government, and to appoint a tsar, a sultan or whatever the title of such a person might be, to oversee what is happening at Old Oak Common, because otherwise we shall end up with a terrible, terrible mess.
Obviously the hon. Gentleman and I do not see entirely eye to eye on this project. However, he may agree with me that it is time for the Department for Transport to sit down, have a look at the administration of HS2 Ltd, and come up with a proper communication strategy that keeps all of us informed, whether we are pro or anti. We need accurate and detailed information to be provided on a timely basis.
I agree with the right hon. Lady, who is assiduous in her pursuit of this issue. I think that, in time, HS2 Ltd may even thank her for that. There is nothing better than a well-informed critic to keep people on their toes. I am even sympathetic towards HS2 Ltd. I know that the Government are saying, “Make sure that you keep within budget and keep to time, because any further increase in the costs will not be sustainable.” However, HS2 must be clear about the fact that it is not just building a 21st-century railway, but engaging some of the major regeneration projects in the country. It needs to think about the potential for collateral damage, and I am not referring just to the obvious problems.
Members have rightly objected, on behalf of their constituents, to the fact that the development is despoiling countryside, or causing noise or other pollution. My hon. Friend the Member for Ealing Central and Acton (Dr Huq) intervened on behalf of her constituents in Wells House Road and Midland Terrace, who are right up against it. I visited the area, which is in my old constituency, with other members of the Select Committee. My hon. Friend’s constituents will be surrounded on three sides by the development for 15 to 20 years, which is horrific, while on the fourth side the main road, Old Oak Common Lane, will be closed for a year or two. That does not bear thinking about, and I am afraid that it either has not been thought about, or has been thought about and then dismissed and put in the “too difficult” box.
The issue that I raised in a short 80-minute speech in Westminster Hall at the end of last year, when I spoke about the effect on my constituency—particularly the environmental effect, and notably the effect on Wormwood Scrubs, a unique and very large piece of open land—has still not been addressed. I do not believe that the meetings that we were told would take place with amenity groups, environmental groups, residents’ groups and, indeed, transport groups have indeed taken place. I do not believe that the voice of local residents is being listened to. Those residents may be speaking in an entirely parochial way—quite properly—about their property or land and their need for adequate compensation, which we in the urban areas are certainly not receiving. They may be speaking for the wider public good and the environment, or coming up with innovative and better transport schemes. In any event, I plead with the Minister to go back to HS2 and say that it must take a more responsible attitude. It must balance its duty to build the railway, which I support, with its duty to the constituencies through which is passes.