Govia Thameslink and Network Rail Debate

Full Debate: Read Full Debate
Department: Department for Transport

Govia Thameslink and Network Rail

Andy McDonald Excerpts
Wednesday 16th March 2016

(8 years, 7 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Andy McDonald Portrait Andy McDonald (Middlesbrough) (Lab)
- Hansard - -

It is indeed an honour to serve under your chairmanship, Mr Hollobone. I, too, congratulate the hon. Member for Horsham (Jeremy Quin) on securing this important debate, and I also congratulate hon. Members from all parties on articulating their case so well. This railway line has been described as the “misery line” and “the line from hell”, and given hon. Members’ accounts of it one can readily understand why.

The question of railway performance and effective working relationships between railway operators and Network Rail is very much the order of the day. Indeed, this very day we will digest the long-awaited Shaw report into the future of Network Rail. I must confess that my journeys into London from 250 miles away sound a lot more efficient and comfortable than the journeys endured by hon. Members from all parties in the House. It has been said that what Network Rail needs are the right people with the right plan. Hopefully they will start to emerge, but then it is about the delivery of what passengers want, as opposed to ripping things up and starting again. We await the recommendations of the Shaw report with great interest.

Today, however, we are dealing with the current very sorry state of affairs on the biggest franchise that has ever been let, which is the combined Thameslink, Southern and Great Northern, or TSGN, franchise. It covers an enormous territory, centring as it does on our ever-growing capital city, and ranging from King’s Lynn in the far north-east—it is all relative, if that is the “far north-east” for this franchise—to Milton Keynes in the north-west, to Southampton and Portsmouth in the south-west, through to Horsham and to Hastings and Maidstone in the south-east. It takes in the connections to Gatwick airport and, ultimately, converges on central London and some of our very busiest mainline stations, including London Bridge, which has been the focus of such significant complaints in recent times.

I will get straight to it and say that this was undoubtedly an ambitious franchise when it was let in 2014. Although I do not wish to diminish by one jot the considerable concerns that Members have, a very significant amount of disruption was always going to be involved with such a major project. One of the major concerns that have arisen—I hope that the Minister will address it—is the extent to which there has been sufficient honesty with the travelling public about the correctly predicted diminution in the standards of service for the duration of the works, and whether that assessment has been made and properly communicated to passengers. We have heard of people being, on the face of it, deliberately misled.

There has to be a degree of accuracy and honesty about what is achievable. Failing to highlight adequately the difficulties that such major undertakings present, and not communicating all of that to the travelling public, serves only to increase dissatisfaction and dash high hopes and expectations. In addition, given the performance issues that have arisen since the franchise was let, questions arise about whether those performance issues ought to have been better identified before the start of the franchise. I therefore ask the Minister to set out what measures are being taken to address those matters and to say what lessons can be learned, especially in the context of the equally ambitious plans for Waterloo station and Euston, which are a consequence of our decision to proceed with High Speed 2. In short, we do not want to see a repeat of the difficulties encountered at London Bridge at other major rail hubs.

I say the franchise was rightly ambitious, because at its heart was a major infrastructure scheme to vastly improve capacity and performance. To that end, London Bridge is undergoing a major reconstruction and transformation, and I believe that work is expected to be completed by 2018. Among many other things, those works will facilitate 12-car Thameslink trains and a new station concourse to improve passenger circulation, which is currently very badly disrupted.

The network is characterised by increased passenger numbers and overcrowding, and significant safety concerns have been outlined, which should alarm us all. However, the outfall in addressing these issues cannot be underestimated. TSGN’s ability to get trains running to timetable is not good. The percentage of franchise trains arriving at their destination on time stands at 81.7%, compared with the industry average of 89.3%. While that is an improvement from 76% and 79% in the previous two years, it still means that nearly one in every five trains do not arrive on time. Judging from the accounts of hon. Members today, it sounds as if those late trains can be clustered together in much higher ratios.

The “right time performance measure” measures arrival time against trains arriving early or within 59 seconds of schedule. Network Rail says that it is not an entirely reliable measure, but in any event it currently tells the sorry story of a compliance rate of only 52.6%, against the industry average of 64.8%. That means that nearly half of TSGN trains do not arrive within 59 seconds of schedule. Given the experiences that have been outlined today, that proportion of late trains may be significantly more than 59 seconds out of its schedule. Similarly, the record on cancellations and significant lateness is 5.3%, against an industry average of 3%. That is a poor reflection, and that feeds through into customer satisfaction.

It is perhaps no surprise that the common factor in the low passenger satisfaction rates in the three bottom-ranked operators—Thameslink, Southern and Southeastern —is the shared line into London Bridge. It seems that passenger flows in and around London Bridge station may not have been correctly predicted. Does the Minister agree with that observation? Can any lessons be learned on the modelling of such matters? Will she comment on the specific measures that might be taken to improve the flow of passengers, given the establishment of the rail reparation fund for TSGN passengers? That was set up in December 2015 and is worth £4.1 million.

In August 2015 serious weaknesses were found by the regulator in the data used to settle new timetables. Network Rail was found to have overestimated the impact of those timetable changes on performance. It seems that there has been insufficient communication between Network Rail and the operators to accurately identify just what impact the new timetables would have. Will the Minister consider whether and how that process might have been better managed and look into additional mitigating measures that could be taken to ameliorate the adverse impacts? There have been issues surrounding the numbers of train drivers, and we have heard that it is not simply that people are failing to turn up—insufficient numbers have been recruited. There is an issue about platform availability during the major works. Will she comment on that?

Efforts are being made to address to some degree the concerns expressed this afternoon, but I look forward to securing some assurances from the Minister that steps will be taken as a matter of urgency to improve the passenger experience in the franchise ahead of what will, I hope, be an entirely happier story come the completion of the works and the introduction of new services in 2018.

A point was made about the sanctions that might be applied to the operator if it fails to abide by the terms of the franchise. Will the Minister give some assurance that, notwithstanding the change to the structure of Directly Operated Railways, the Department for Transport retains the capability to step in through that office in the event of chronic failure?

Kelvin Hopkins Portrait Kelvin Hopkins
- Hansard - - - Excerpts

Of course, when the east coast main line was returned to the public sector for five years, it made a surplus of something like £1 billion for the Treasury, and during that time it ran a very good service.

Andy McDonald Portrait Andy McDonald
- Hansard - -

My hon. Friend makes a good point. While that was an excellent turnaround from a pretty dire situation, if this particular franchise is, as Members have outlined, so poor that it demands intervention, my concern is that we should still retain the capacity to do that. Given the recent changes to the DOR—it is no longer in the same form—I am concerned that it would not assist at all. Will the Minister address that point?

Will the Minister also address the pertinent issue of electronic ticketing? Members have correctly identified and highlighted the benefits that could be secured from an intelligent roll-out of electronic ticketing. Those benefits relate to access not only to fair fares, but to refunds. I understand that although several tens of millions of pounds was spent trying to progress that agenda, it has come to a shuddering halt and has simply been handed over to the operators.

Andy McDonald Portrait Andy McDonald
- Hansard - -

The Minister disagrees. I am enquiring, so perhaps she can enlighten and correct me. A number of Members have clearly made that reasonable demand on electronic ticketing, and it seems eminently sensible. We want to know what happened to that investment and how it will be progressed.

Finally, I was heartened to hear many Members from across the territory express, on behalf of their constituents, the need for proper staffing levels to be maintained in our railway stations. Many people spoke about difficulties in accessing ticket machines and computer systems. Often that was beyond their capabilities, whether because of information technology illiteracy, learning difficulties or other issues. That strong message came from Members’ contributions today. Will the Minister comment on how we can secure those reassurances that all members of the travelling public need? They need to see that human interface, and sadly it is clearly lacking in the operation of the franchise.

Philip Hollobone Portrait Mr Philip Hollobone (in the Chair)
- Hansard - - - Excerpts

If the Minister is kind enough to conclude her remarks no later than 3.57, that will allow Mr Quin three minutes to sum up before I put the motion to the House.