I beg to move amendment 22, in clause 6, page 3, line 38, at end insert—

“(1A) The Secretary of State must give a specific direction to Great British Energy that it must take all reasonable steps to satisfy itself at the time of any investment in renewable energy infrastructure that connection to the National Grid will be made in time for energy produced from the relevant investment asset coming onstream.”

Amendment 22 would require Great British Energy to take all reasonable steps to ensure that access to the national grid is ready for any energy infrastructure invested in by Great British Energy. The great grid upgrade is, without a doubt, a necessary component of our journey to net zero by 2050. Currently, new energy infrastructure such as wind turbines and solar farms—the clean energy-generating technology that we need to invest in in this country—has a significant wait time for grid connection, as do many other projects.

That is why, when in government, we commissioned the Nick Winser review to set out recommendations on how to reduce that timeframe. We accepted every single one of the recommendations and the advice on all 43 areas to ensure that the continued work to drive down connection times was accelerated. Despite the work we initiated in government by accepting those recommendations, the timeframe for obtaining grid connections for new projects can be as long as 10 years, so a project without grid connectivity will potentially not come online until the mid-2030s—well beyond the new Government.

Polly Billington Portrait Ms Polly Billington (East Thanet) (Lab)
- Hansard - - - Excerpts

It is a pleasure to serve under your chairship, Dr Huq. I am staggered that the hon. Gentleman is talking about the national grid as though the previous Government—his Government —had not been in power for the last 14 years and did nothing to transform the national grid to support the renewable energy that is essential for the country’s prosperity. All the failures in the national grid system, and all that backlog, are because of the failure to grip the problems with the national grid that happened on his Government’s watch.

Andrew Bowie Portrait Andrew Bowie
- Hansard - -

I thank the hon. Lady for her intervention, but I think she is being slightly unfair. When I was Networks Minister, we commissioned and accepted every one of Nick Winser’s recommendations on how we could speed up connection times, improve the national grid, build new infrastructure and ensure that the queueing system was brought into a much better shape than we found it in when we came into office in 2010—