GWR and Network Performance Debate
Full Debate: Read Full DebateAlex Chalk
Main Page: Alex Chalk (Conservative - Cheltenham)Department Debates - View all Alex Chalk's debates with the Department for Transport
(5 years, 10 months ago)
Westminster HallWestminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.
Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
Indeed—nor does it make sense for the environment and reducing carbon emission, which we all know is crucial. I feel quite sorry for the GWR staff at times, because they do an incredible job and work very hard. When speaking off the record, they are often just as frustrated about the lack of training and support that they are given. They often have to deal with complex problems, such as failures of the new rolling stock, when they have not been given adequate support to do so.
I will mention some of those particular problems. On the new trains, there have been door failures. We get frequent complaints about the seats, which are supposedly ergonomically designed but are some of the most uncomfortable seats someone could ever sit on. As for catering, we were told that they were going to get rid of the buffet cars on the London to Cardiff services, but that was not what passengers wanted. Often, a trolley with no hot water comes through, and it will only go through half of the train—that is if it can get through the train because, of course, if the train is overcrowded, it cannot. There have been issues with train safety systems failing, with the reservations system simply not working, as well as generator problems caused by the fact that bi-modal diesel and electric trains are running more on diesel because of delays to electrification. As a result, the engines sooted up and failure rates rose.
Does the hon. Gentleman share my frustration about the announcement —one sometimes hears it over the tannoy—that there is not a train crew available to drive the train? Does he share my concern that there seems to be a lack of planning, as well as potential skimping on preparing sufficient resources to crew the trains?
Indeed; I have experienced that, particularly with services departing from Paddington, which should be one of the easiest places to have train crews available, as well as relief train crews if there is a problem.
As a result of all that, GWR has had the third largest increase in complaints rates in the country—behind Northern and Grand Central—with complaints rising in the last quarter. Like Grand Central, a reason for the increased volume of complaints is the quality of the train, as well as delays and cancellations.
The train line between Cheltenham and London is critical—I have likened it in the past to an artery, because it is responsible for nourishing so much of Cheltenham’s prosperity. That has never been truer than it is today, because Cheltenham has exciting prospects with things such as the cyber-park, which will allow start-up businesses in that crucial sector to grow and develop, and will bring prosperity and opportunity to people from all walks of life. However, there is no doubt that the service provided by Great Western Railway is not at the level we need it to be.
Last summer we had a really concerning situation because, as I said to the hon. Member for Cardiff South and Penarth (Stephen Doughty), there were insufficient train crews. When I raised the issue with GWR, it said, “Well, some people are training and so on”, and although that was terribly interesting, it was not a satisfactory explanation. To be fair, GWR recognises that it needs to improve, but even if it does I have a lingering concern about one crucial factor: the cost. Even for somewhere such as Cheltenham, which has a higher per capita income than the national average, the cost of a walk-up ticket is completely prohibitive. Again, it is not a complete answer to say that people must book in advance. If we want an agile economy in which people need to get on a train and go to London, it is not appropriate to say simply that that option is effectively not available to people because of the cost.
What is so invidious is that the cost per mile from Cheltenham to London is so much higher than in other parts of the country. The reasons for that seem opaque and are lost in the mists of time; they are linked to the structure that prevailed at the time of British Rail. That has got to change, particularly because although the cost per mile from Cheltenham is so much higher than it is elsewhere, the speed is slower. For example, a train journey from Exeter to London—200 miles—is quicker than one from Cheltenham to London, which is less than half the distance.
It is important to place this issue in a wider context, because it has not been all bad. GWR has been responsible for significant investment in Cheltenham Spa station, and we look forward to the opening of the car park in due course, with more than 80 additional spaces and an improved forecourt. The Swindon to Kemble line has been redoubled, and we look forward to sub-two-hour trains to London later this year. Those important service improvements cannot come soon enough, however, because the risk is of a modal shift away from trains as my constituents decide that instead of getting on a train at Cheltenham they will drive to Swindon, Kingham, Kemble or elsewhere—the point about pollution and so on has already been made.
Where does that lead us in terms of public policy? The drumbeat for renationalisation is growing louder—one can hear that from those on the Opposition Benches—but I respectfully counsel against it, because it is not the solution that a lot of people hope it might be. First, it would be extremely expensive to renationalise the railways, and that would mean taking precious resources away from other sectors. Secondly, my real concern is that were the railways to be nationalised, if it came to a bidding war between the NHS and railways, the NHS would win. If it came to a bidding war between schools and railways, schools would win. If it came to a bidding war with any other precious public service, railways would be likely to come off second best.
I am just about old enough to remember the state of British Rail. It was atrocious: old, dirty, clunky rolling stock, and unspeakably awful food. Although I have some sympathy with the idea of renationalisation—there can be limits to privatisation, particularly when dealing with public goods that have a natural monopoly—we should be careful what we wish for.
The hon. Gentleman makes interesting points about public spending. Does he agree that the current Government are already making a significant investment in High Speed 2? Surely, any Government would balance their investments and spending on a number of different projects. In addition, the current franchise system is hugely costly and is using large amounts of public money very badly.
It is true that the system uses public money, but it comes down to how much public money, and what is the proper balance. I simply make the point that although it is easy in the abstract to suggest that if the railways come into public ownership, fares will come down and quality will go up, I suspect that is unlikely in reality. If I am looking for additional funding for my local oncology centre, compared with more rolling stock, I think I know which one I and many colleagues would prioritise.
If train operating companies want to enjoy public support—they do not enjoy enough public support because they are the author of their own misfortune in many circumstances—they must raise their game in two particulars. First, they must be more reliable, and secondly they must be more competitive in their pricing structure. Otherwise, the people of Cheltenham, who I represent, will feel that they are getting a raw deal. Public services must be for the people, and GWR needs to raise its game.
What the Welsh Government have been able to demonstrate is that rail is not an entity in itself, but is fully integrated into the economy and connected with other transport routes. I thank my hon. Friend for bringing that point into the debate.
The most powerful arguments I have heard in this debate have come from the voices of passengers, which hon. Members have reflected. We have heard their pain and their stories of woe. The fact that passengers across this line are paying 20% more but getting a worse service is frankly unacceptable.
We have heard about innovations that are needed to upgrade stations and making them safe. My hon. Friends the Members for Ogmore (Chris Elmore) and for Bristol East (Kerry McCarthy) both highlighted how disabled people need a proper service, not only at stations, but on the trains themselves, which has not been delivered even with the new rolling stock. There is a catalogue of problems that must be resolved. My hon. Friend the Member for Plymouth, Sutton and Devonport (Luke Pollard) gave the most powerful of speeches in making the case that, five years on from seeing the railway at Dawlish washed into the sea, the Government have yet to drive forward a programme to protect the whole of that vital south-west economy. We must see peninsula rail moving forward at pace now to protect the economy there.
Of course, we have the route itself, which is crying out for focus and proper governance. We have heard how the delay repay 15 system has not been introduced in an expedient way, yet this is a line that has had three direct awards, which will shortly total nine years, when it only had a franchise for seven years. Surely the Government can set the terms to protect the interests of passengers, but they have failed to do so. I would like more accountability from the Minister when he responds on why they keep issuing direct awards, which clearly shows that the franchise system is completely broken and does not enable the state to demonstrate that it can run the railways far more efficiently.
I will not, because of time. As frustrations have grown, we have seen satisfaction plummet; we have heard how vexed and unsatisfied passengers are with the poor service on that line.
It was last year’s timetable fiasco that really brought all those issues into focus. Staff themselves, as some hon. Members have highlighted today, have been professional and incredibly patient in their dealings with the public, and have received a quantum of abuse in trying to keep people safe through this time. It is not their fault, after all, that the Secretary of State meddled in the planned timetabling process by changing his mind over the projects he was cutting. It is not their fault that the private companies could not get their act together to have the trains delivered and up and running on time, with proper testing of the system. It was the Secretary of State who failed to hold the companies to account. It is not the staff’s fault that Network Rail, which is accountable to—guess who?—the Secretary of State, failed to deliver the infrastructure on time.