South-Eastern Rail Franchise

Matthew Pennycook Excerpts
Tuesday 23rd April 2019

(5 years ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Urgent Questions are proposed each morning by backbench MPs, and up to two may be selected each day by the Speaker. Chosen Urgent Questions are announced 30 minutes before Parliament sits each day.

Each Urgent Question requires a Government Minister to give a response on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Andrew Jones Portrait Andrew Jones
- Hansard - - - Excerpts

I will have a look at my hon. Friend’s point. The key benefits that have come into our rail services over the past few years have come in through the franchising process, as it has brought in private investment. That investment has purchased or leased new rolling stock, which has meant a transformation across the country for the travelling public. My hon. Friend is as impatient as I am that the benefits that we are seeing come to fruition for her constituents, and I will of course work to deliver them as fast as possible.

Matthew Pennycook Portrait Matthew Pennycook (Greenwich and Woolwich) (Lab)
- Hansard - -

The franchise specification promised extra capacity, new rolling stock, greater frequency of trains and 15-minute Delay Repay, but my constituents will now not see those improvements for at least another seven—perhaps 12—months. What specifically is the Department going to do to improve services for passengers on Southeastern throughout the period of the franchise extension?

Andrew Jones Portrait Andrew Jones
- Hansard - - - Excerpts

We are working to bring the franchise decision to a conclusion as fast as possible, and to get the benefits that will come with that decision right across the franchise as quickly as we can.

Rail Services: South-east London

Matthew Pennycook Excerpts
Wednesday 6th March 2019

(5 years, 1 month ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

David Evennett Portrait Sir David Evennett
- Hansard - - - Excerpts

The hon. Lady makes a good point. Our area is ripe for further development, which is what we want. We want jobs, houses and opportunities, but we cannot have those without infrastructure. If the infrastructure cannot cope with that development, more problems are going to occur.

The Minister may be able to tell us different, but I believe no other rail network has had as many problems as ours. The excuses for delays and cancellations beggar belief: bad weather, leaves on the line, snow, low-level sunshine, overrunning road engineering works, and even drivers not turning up at Dartford because their taxi from Gravesend did not arrive on time. Southeastern could not run the train from Dartford because the driver did not turn up—it is really appalling. There have been breakdowns en route and doors that will not close—the list goes on and on. In my view, older rolling stock is the cause of some of these issues, not maintenance.

Many of my constituents have been appallingly disappointed that no decision has been made about the new franchise, as was mentioned earlier. That ought to have been in place by now, but we have just extended the existing franchise, which is one of the worst possible options that we could have chosen. If the operator cannot invest for the future, it is not going to do anything.

Matthew Pennycook Portrait Matthew Pennycook (Greenwich and Woolwich) (Lab)
- Hansard - -

The right hon. Gentleman is absolutely right. There have been two extensions to the franchise; the latest, I think, takes us up to 22 June. Does he agree that our constituents at least deserve to know pretty soon who the new operator will be, so they can have some confidence that, going forward, that new operator is going to improve the service?

David Evennett Portrait Sir David Evennett
- Hansard - - - Excerpts

I totally agree with that. The sooner we know, the better, so the new operator can get cracking on what needs to be done to improve the service.

The new franchise contains some good proposals. Working more closely with Network Rail will be a great improvement, because I do not think the operator and Network Rail work together terribly well at the moment. We welcome the fact that there will be direct services from Bexleyheath to Abbey Wood, tougher demands for reliability and more frequent services to Charing Cross. However, with no decision having been made and no action, we suffer more and more, and our constituents have had enough. I know that the Minister is relatively new to his post, but I have a high opinion of him, and he is well respected across the House. I hope he will take some action within his Department.

--- Later in debate ---
Andrew Jones Portrait The Parliamentary Under-Secretary of State for Transport (Andrew Jones)
- Hansard - - - Excerpts

It is always a pleasure to serve under your chairmanship, Sir Henry. I, too, congratulate my right hon. Friend the Member for Bexleyheath and Crayford (Sir David Evennett) on securing this important debate. Many important issues have been raised, and I will be scampering through trying to answer all the comments from colleagues, including on the landslip that my right hon. Friend raised with me before the debate, as he is a vigorous champion for his constituency. I will also talk about the infrastructure works, Southeastern’s performance, Crossrail and Ebbsfleet.

I will start with the landslip at Barnehurst. Landslips cause significant delays and cancellations, as trains obviously have no real capacity to deal with any kind of small obstacle. If there is debris on the track after a landslip, Network Rail will often need to re-route services to enable the landslip to be cleared and the infrastructure to be checked to ensure that it is safe and operational. There are always concerns, even after a small landslip, that the slope may be permanently weakened. Some of the slopes, or cuttings, on the side of the tracks may need to be strengthened as a result. That may include improved drainage or adding stronger materials to the slope, such as steel rods or soil nails, and that work can take some time.

The landslip at Barnehurst took place on 11 February and the service was not fully reopened until the following week on Monday 18 February. That was a significant inconvenience for the travelling public in the area, but work has been done to mitigate future landslips. I know that it has been a regular problem in the area, and to help to prevent further landslips Network Rail has installed remote sensors and cameras that send its monitoring headquarters regular information, including visual information, about the condition of the cutting.

While removing the debris and the slope, Network Rail has taken the opportunity to put in place some further mitigation. It has taken away 300 tonnes of earth and trees, and built a 30-metre retaining wall with steel beams piled six metres into the ground to stop another landslip. Network Rail has also removed and replenished the contaminated ballast, and tested all the signalling. If any slips occur again in the area, the wall that has been erected should prevent any further disruption to the line.

I know that my right hon. Friend the Member for Bexleyheath and Crayford met representatives of Network Rail to discuss the issue, and that they have explained to him what is going on. That work includes geotechnical surveys to understand the cause, not just to deal with the symptoms. Network Rail also plans to carry out more intensive remediation work at the site over the next two years. That underpins the wider investment that is being put into the south-east through a Network Rail funding settlement for the next five years. That will allow for a significant increase in expenditure on maintenance and renewals, all of which is designed to reduce the frequency of serious incidents and to provide a more reliable service. That underpins the comments we heard from Members across the Chamber.

I note the clear concerns about Southeastern’s performance in the recent passenger survey. I fully understand, and strongly agree, that passengers want a timetable that they can rely on. Their days and working careers are built around predictable structures, and timetables matter. The May 2018 timetable changes caused some unacceptable disruption, but important lessons were learned and implemented. The December timetable change was introduced successfully. The industry has significantly reduced the timetable changes to minimise the risk of severe disruption, and has introduced a phased, more gradual approach to enhancements.

Many changes were focused on improving performance and reliability for passengers. It might be of interest that in the next control period, starting only next month, we will introduce a new “on time” performance measure to assess the reliability of every journey. That will provide greater transparency about performance at every station along the route, not just whether trains reach their final destination on time. It is part of a much wider commitment by the industry, and by Government, to provide a rail service on which passengers can rely.

If train operating companies are unreliable, we must hold them to account. We have worked closely with consumer groups and the industry to create an independent rail ombudsman. That scheme is free, easily accessible and simple to use. It is designed to be a one-stop shop for passengers on issues to do with complaints handling, customer service and compensation. Of course, we want to get to a place where we do not have to worry about compensation; we just want the trains to be on time, every time. That is the purpose of our investment.

Matthew Pennycook Portrait Matthew Pennycook
- Hansard - -

As the right hon. Member for Bexleyheath and Crayford (Sir David Evennett) mentioned, rolling stock is key to reliability. The rolling stock on this line is, I think, 25 years old or more. Is the Department working with the operator to introduce new rolling stock in the near future?

South Eastern Rail Franchise

Matthew Pennycook Excerpts
Tuesday 27th November 2018

(5 years, 5 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Robert Neill Portrait Robert Neill
- Hansard - - - Excerpts

That is absolutely right, and I have total sympathy with those further down the line. Investment has not matched capacity. The few trains that come up from the coast and stop at somewhere such as Bromley South are crowded by the time they get there. Despite the promise that the London Bridge rebuild would solve the congestion, it has not, and all too often, it is necessary, for whatever reason, for the signalling arrangements to let trains from the coast go through, sometimes not full, while people are sitting on commuter metroland trains that are absolutely rammed. That is not working for anybody. We also frequently get points failures in that first six miles out of London, and that affects everybody who uses the network, however far they are going.

It is no exaggeration to say that I could probably fill the whole of this half hour by reading out emails, tweets and messages from social media sites that I have received since this debate was announced. I have had scores and scores. The numbers are perhaps exaggerated this time because of the publicity, but it is more or less a normal arrangement for me. There is not a day on which I do not see some complaint or other about some failing on the trains.

I commute up every sitting day from Chislehurst and I see it myself. I got the 8.09 from Chislehurst today. That is supposed to be a service of about 25 minutes, but I allow half an hour, to Charing Cross. That is not what it is supposed to be, but nobody expects these trains to run exactly to time—that is how bad it is. It is an exception if it runs to the minute. As it was, we arrived at 8.55, so it took nearly three quarters of an hour. My maths is not brilliant this afternoon, and I will be generous, but that is a 30% or 40% increase on what the journey time is supposed to be. That is not an exception; all too often, it is the norm.

Constituents say to me that they like the area, but are seriously thinking of moving because the trains are unreliable. As the hon. Member for Erith and Thamesmead (Teresa Pearce) said, that is compounded by the failure to invest in stock. Short train formations are a regular bane on both my lines and those going into north Kent, which creates serious overcrowding at peak hours. There is also pretty poor communication in terms of making people aware of last-minute cancellations and changes. The one shining light of Southeastern is the quality of the station staff at our local stations. I have found every one of them to be absolutely excellent; they really do their best and are well linked into the communities they serve. It is not their fault. It is a case of lions being led by donkeys, as far as the operation of the franchise is concerned. They deserve better leadership and could do with better investment in some of their stations. They have to bear the brunt of the frustration of passengers who pay a lot of money and are simply not getting the service they are paying for.

The issues have been well documented. The Department conceded that the number of responses to the consultation on the proposed renewal of the franchise was “unprecedented”. It is not surprising, given the amount of anger and angst. There are assurances that the new franchise documents will meet the concerns and that they will be taken on board. People’s trust is running pretty thin. The Minister is new to his post, but trust in the Department is running thin as well, as is trust in the regulatory apparatus and the operator. We were told that there would be much more joint working. The reason given for not redesigning the franchise and putting the metro services into Transport for London was that the Secretary of State wanted to bring train and track together. Although there have been efforts at joint working and there is a joint board, in practice what I seem to get is senior managers from both sides coming and giving me their excuses together rather than separately. I am not sure that it makes much difference to my constituents on the platforms.

There are some pretty blatant examples beyond the daily grind of cancellation and failure. When I was sitting on the train waiting to get into Lewisham about 10 minutes behind time, I had a tweet from one of my constituents, Tommy, who is known to Network Rail because it tried to block him once, because it did not like the fact that he was calling it out for the errors that it was consistently making. He tweeted about three trains delayed in the Lewisham area. He was spot on. That was because they had all been held to allow a late-running Dartford train, which was already behind schedule, to come through. Owing to the way it was operated, there were now four trains behind schedule. Clearly, that joined-up working is simply not happening.

We have had other errors on basic things such as timetabling. A lot of my constituents travel from Bromley North and Sundridge Park, then change to the mainline at Grove Park. That is a busy station, because even trains that start from Orpington are pretty full by then. The timetabling means that often people have one or two minutes to get from one side of Grove Park station—it has about four mainline tracks plus a baby platform stuck on one side—to the other. It is a very short period for people to have to go up a lengthy walkway and then on to a footbridge. That is assuming that the mainline trains run to time. When they do not, the shuttle service leaves without people. People either run—and sometimes slip, as I have seen on the footbridge—and pile on to an overcrowded train, or else they are left hanging around for perhaps half an hour until the next shuttle returns.

Local MPs and I have repeatedly raised the issue of timetabling. Time and again, I have said, “Why can you not align the timetables properly on the Grove Park branch?” but nothing has ever happened. Only three stations can be saved on the app’s dashboard, yet most people would like to have a choice of which London terminal they go from if there are going to be problems. That has been raised time and again with the most senior level of management. They say, “That’s an interesting idea,” but nothing ever happens.

About a year ago, there was a scandalous incident that ended up being investigated by the rail safety authorities. Just before Christmas, about half a dozen trains were stranded for up to four hours in the Lewisham area, affecting both sets of lines. There was very heavy snow and there were poor weather conditions—I accept that the central rail form of electricity on that line is particularly susceptible—but there was a complete failure to rescue people from the trains in any decent time, as my constituents regularly point out to me. A plan was supposed to be put in place to get people out of those trains—it should have been activated within an hour and got people out within two—but it failed. We had people sitting on those trains for five to six hours with no power.

One might think that something would have been done about that after the report was published by the Rail Accident Investigation Branch, but my constituents remind me that there have been another four incidents of people being stranded for two hours or more. The basic procedures for getting people off delayed trains are still being ignored—there is no other word for it. That seems to be an extraordinary failure.

I could go on at length. An excellent councillor for Bromley Town, Will Harmer, has just tweeted me. He says of the Grove Park scenario:

“Yes, it happened again last night. Train just left as the first person got on to the platform.”

How many times do people have to say that before it sinks into the minds of the people who run Southeastern trains? Another message reads:

“Thanks for raising this, Bob. The delay problems have been steadily getting worse. Southeastern trains have been getting away with murder.”

My constituent Alex Le Vey commutes, and he says:

“The service is getting worse—more overcrowding, more delays.”

Another constituent says:

“Trains are late almost every day. The 17.52”—

it goes down to the Medway towns—

“is 15 minutes late on average, and only on time 20% of the time.”

I mention that because managers, Department officials and Ministers often come out with statistics and say, “Actually, things are improving. Things are getting better. Statistics show that reliability has gone up.” That is not the lived experience of people on the trains and platforms. On the operation of Southeastern trains, I am inclined to take the view that there are

“lies, damned lies and statistics”.

Looking at that scenario, it is understandable that we have real concerns about the franchise renewal. We might well get the same operator or one very much like it.

Matthew Pennycook Portrait Matthew Pennycook (Greenwich and Woolwich) (Lab)
- Hansard - -

I congratulate the hon. Gentleman on securing this debate. Many of my constituents are disappointed that the Government changed their mind and ultimately decided not to hand responsibility for the service to Transport for London. Knowing that the franchise will be renewed, they are worried that the renewal might be delayed. Earlier this year, we were promised that there would be an announcement this month—we have four days left. Does the hon. Gentleman share my concerns that we need a decision to be made, and that the new franchise cannot be delayed? In the minds of my constituents, the worst possible scenario would be the current operator extending the service far beyond April next year.

Robert Neill Portrait Robert Neill
- Hansard - - - Excerpts

I agree. The Minister will not be able to tell me the likely outcome, but some of our problems are with the franchising process. I was a believer in franchising out because I thought it would bring competition, but there are only about three big conglomerates that are capable of bidding for those franchises. Competition is non-existent—those big conglomerates have a nice, captive market, and there is nothing like the incentive that there should be for them to come up with the goods for paying customers.

The hon. Gentleman is absolutely right to say that there is uncertainty and no guarantee of the investment that the network is crying out for. The thought of simply renewing franchises for operators that have failed would be, I think, pretty outrageous to most of my constituents and to most people who commute on that line. They do not want just a change of badging or a renewal or change with lots of promises that things will be better this time; they want to see precisely what is in the franchise document when it is published. We have seen the consultation, but we need to see the contract itself. What benchmarks is the operator being held to, what will be the penalties, and will those penalties genuinely be applied at this time? What more incentives will be offered to Network Rail to keep their end of the bargain? That is a big part of it, too.

What penalty will we sensibly apply to the public sector? When the private sector fails, franchises can be taken away—it should have happened more often in the railway network in the past—but we must also have proper recompense when the publicly owned Network Rail is at fault. What delivery timetables will ensure that overcrowding will be reduced and that the number of signal failures on the Network Rail side will be reduced, and over what time period? When will we have investment in the new carriages and the extra rolling stock? When will we have upgrades to the communications system? I recognise that we have seen some changes, such as to the delay repay system. With respect to the Minister and the Department, that is just skirting round the edges.

It is genuinely a pleasure to see the Minister back in his place. I hope it is not too much of a displeasure for him to have to come and listen to a debate on Southeastern trains again, because he did so a good deal in his previous incarnation. There must be a sense of déjà vu for him, as there is for me. Above all, there is a sense of déjà vu—not in a good way—for my constituents who are commuters. I am grateful for the opportunity to raise these issues, and after the debate I will happily supply the Minister with a detailed list of all the complaints that have been sent to me on social media platforms. I will get that across to his office tomorrow—it will set out what has happened in the past 14 days or so to one Member of Parliament. I suspect that there are plenty of other Members across the franchise area who can say exactly the same thing, and I look forward to the Minister’s response so we can find out what is happening, when we will have some action and real promises, and how those promises will be delivered—frankly, people in our area have had enough.

Oral Answers to Questions

Matthew Pennycook Excerpts
Thursday 22nd November 2018

(5 years, 5 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Nusrat Ghani Portrait Ms Ghani
- Hansard - - - Excerpts

Absolutely. We fully appreciate that girls in particular can close their minds to engineering at quite an early stage, at primary school. We want to work with young students throughout their school lives to ensure that they realise that it is a good career, and one that is open to them.

Matthew Pennycook Portrait Matthew Pennycook (Greenwich and Woolwich) (Lab)
- Hansard - -

6. What recent discussions his Department has had with Southeastern on (a) timetabling and (b) performance standards.

Andrew Jones Portrait The Parliamentary Under-Secretary of State for Transport (Andrew Jones)
- Hansard - - - Excerpts

The franchise agreement between the Department and train operators includes key performance benchmarks. The Department monitors each train operator against those levels, and that includes regular meetings with their senior management team at which performance figures are scrutinised and challenged. A range of enforcement mechanisms are available to the Department in the event of non-compliance.

Matthew Pennycook Portrait Matthew Pennycook
- Hansard - -

Given their experience in recent years, many of my constituents are looking to the next operator of the Southeastern franchise to significantly improve timetabling performance. With that end in mind, will the Minister—whom I warmly welcome to his post—confirm that the Department still expects to announce the winning bidder this month and reassure passengers that the start of the new franchise will not be delayed?

Andrew Jones Portrait Andrew Jones
- Hansard - - - Excerpts

The level of performance management in that area is 91.2%, which is high across our railways. I will write to the hon. Gentleman with full details of the answer that he has requested.

Oral Answers to Questions

Matthew Pennycook Excerpts
Thursday 11th October 2018

(5 years, 6 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Jesse Norman Portrait Jesse Norman
- Hansard - - - Excerpts

We absolutely recognise the problem. At present, the unsuitable use of roads is controlled through information and traffic control mechanisms, by Highways England and local authorities. We are tracking the geo-fencing technology closely. It requires a lot of other moving parts, but we are certainly thinking about it.

Matthew Pennycook Portrait Matthew Pennycook (Greenwich and Woolwich) (Lab)
- Hansard - -

T8. Tomorrow, Southeastern will introduce a temporary autumn recovery timetable, which will cause reductions in services and station-skipping throughout my constituency. Will the Minister commit himself to monitoring the situation to ensure that a normal timetable is introduced as soon as possible?

Lord Johnson of Marylebone Portrait Joseph Johnson
- Hansard - - - Excerpts

We will of course be monitoring the autumn timetables across the country. I am glad to see that Southeastern’s performance has been good in recent months: I believe that the current public performance measure is 94%.

Oral Answers to Questions

Matthew Pennycook Excerpts
Thursday 19th April 2018

(6 years ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Lord Johnson of Marylebone Portrait Joseph Johnson
- Hansard - - - Excerpts

In the next franchise period we will ensure that performance in quality is an absolute focus for the new operator. When that is in place moving towards next year, the new franchisee will adopt the new measures we have proposed as part of the move towards control period 6. The use of a public performance measure that allows services to arrive up to five minutes late at end destination will be replaced by timed to three, or T3, and that measure will be used for the services along this route.

Matthew Pennycook Portrait Matthew Pennycook (Greenwich and Woolwich) (Lab)
- Hansard - -

Like my colleague, my hon. Friend the Member for Eltham (Clive Efford), I wish the hon. Member for Bromley and Chislehurst (Robert Neill) all the best.

After years of disruption due to the London Bridge rebuild, passengers discovered last week that Greenwich line evening services will not be of the frequency previously advertised after May because, according to Southeastern, it does not have enough drivers. Can Ministers do anything about this frankly risible situation?

Lord Johnson of Marylebone Portrait Joseph Johnson
- Hansard - - - Excerpts

I thank the hon. Gentleman for bringing that concern to my attention, and I will discuss it with Southeastern.