Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.
Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
It is a pleasure to serve under your chairmanship, Mr Robertson, and to respond to the numerous speeches made by right hon. and hon. Members.
I congratulate the hon. Member for Birkenhead (Mick Whitley) on securing the debate on this incredibly important topic. Transport connectivity in Merseyside is important for not just the city region, but the north of England and the whole United Kingdom. Responsibility for much of transport connectivity in Merseyside rests with the Liverpool City Region Combined Authority and the city region’s metro Mayor, Steve Rotheram, who has been referred to by many speakers, and whom I meet regularly, given that my portfolio includes high-speed rail and Northern Powerhouse Rail, as well as the trans-Pennine route upgrade.
Mayoral combined authorities—Liverpool city region was at the forefront of the drive to create metro Mayors—were created in recognition of the strategic importance of joining transport connectivity with activity on economic development, housing and planning, so that we can ensure sustainable economic growth in our great cities and opportunities for the communities in them. Through a series of devolution deals, we have provided mayoral combined authorities with more transport powers and more funding. I assure all Members who have spoken that the Department for Transport and its Ministers, including me, work constructively with the Mayor and all our partners in the Liverpool city region to ensure that its transport connectivity maximises economic growth and supports thriving communities.
I am grateful to the Minister for giving way. What does he think about Steve Rotheram’s suggestion, which I repeated today, that the Minister sits down with local government leaders to see if a compromise can be reached that does not have all the downsides we know about, and that would improve the service in the way that many of us would like?
I thank the right hon. Gentleman for that point. I have spoken to Steve Rotheram since the integrated rail plan was published and I am aware of the call from northern leaders for more discussions. I am happy to have those discussions, both with the Mayor and with other northern leaders, to see how we can progress a variety of schemes. It is fair to say that I spoke to all the northern leaders regularly when considering the integrated rail plan and drawing it up. The Secretary of State met northern leaders through the Northern Transport Acceleration Council, which he founded. He also worked with Transport for the North to bring together a wealth of evidence and come up with the plan, but I am more than happy to continue to speak to the Mayor and others to ensure that we take local communities with us as we progress the plans. As we said in the plan, we take an adaptive approach towards investment. We are keen to continue to work with the Liverpool city region and others on delivery of the plans.
Improved transport connectivity within and between our great cities is fundamental to our levelling-up vision, in which we unlock the economic potential of the northern powerhouse, build back better from this awful pandemic, and ensure that the Liverpool city region and the north of England play a key role in a resurgent UK economy. That is why my Department, led by the Secretary of State for Transport, who is also the Cabinet Minister with responsibility for the northern powerhouse, is at the forefront of making that vision a reality.
I thank my right hon. Friend for giving way and I congratulate the hon. Member for Birkenhead (Mick Whitley) on securing this important debate. For many, Liverpool is the capital of north Wales, yet direct rail services from the north Wales coast ceased in the 1970s. Thanks to the reopening of the Halton curve, hourly services are promised from Llandudno to Liverpool, although not, I think, until December 2023. Will the Minister join me in calling on Transport for Wales to bring that forward if it can?
I thank my hon. Friend for that point, which I will relay to the Minister with responsibility for rail, who I know speaks regularly to colleagues in Transport for Wales. He makes a very powerful point on behalf of his constituents.
Since 2010, over £29 billion has been invested in transport infrastructure in the north, but the Government want to go further, faster. Levelling up all parts of the UK is at the centre of the Government’s agenda as we build back better from the pandemic, and we will shortly publish a levelling-up White Paper that sets out bold new policy interventions giving local control to drive economic recovery. Transport connectivity is fundamental to that.
The Minister has said that he recognises the importance of transport connectivity and improving the economy of the Liverpool city region. Then why have his Government decided to deliver the worst option—a watered-down version of it described as “cheap and nasty” by the Mayor of the region? It is just not good enough.
It was described by Mayor Rotheram in those terms. However, our analysis has shown that the proposals from Transport for the North and others for brand new lines would have very significant additional costs and environmental impacts, and would deliver minimal additional benefits to passengers. They would also take longer to deliver than upgrades to existing lines.
Many right hon. and hon. Members referred to climate change. I speak as the Minister responsible for high-speed rail, and having spent a lot of time mitigating some of the environmental impacts of the construction of HS2. The embedded carbon in steel and concrete, and building brand new infrastructure through pristine countryside, has a huge environmental impact both on biodiversity and carbon emissions. We have to get the balance right. If in parts of the north of England we can deliver similar passenger benefits with less environmental impact, we have to consider those options realistically. These were the kind of issues we had to balance when we were drawing together the integrated rail plan.
The levelling-up White Paper is being finalised, but we are already making great strides towards strengthening the voice of the north. Mayor Rotheram represents a region that is part of the 60% of the north that is now covered by metro Mayors. We have announced the first allocations from the £4.8 billion levelling-up fund, which will regenerate towns and high streets and allow investment in the infrastructure that people need. This includes £37.5 million for Liverpool city region’s “levelling-up for recovery” proposals, which will deliver a range of transport interventions to support connectivity and economic growth in Liverpool city centre, the Maritime Gateway in Sefton and Birkenhead. Those include the transformation of Argyle Street with a new active travel corridor that will link regeneration at Woodside with a new Dock Branch Park and the enterprise zone at Wirral Waters; and reconfiguring the Kingsway tunnel toll plaza to address congestion and delay on the strategic bus and car route into Liverpool. In addition to this, we have committed £2.35 billion to 101 towns deals, which will invest in local economies; that will affect the constituency of the hon. Member for Birkenhead, but also Runcorn, St Helens and Southport—all in the Liverpool city region. All the towns fund proposals for those areas include measures to improve local transport connectivity.
England’s eight large metropolitan areas, including the Liverpool city region, are the mainstays of our work to level up the UK. We will invest £5.7 billion in the transport networks of those city regions through the city region sustainable transport settlements programme, including £710 million in the Liverpool city region. That funding will provide the Mayor with the flexibility to invest in local priorities, many of which have been applauded by hon. Members today. In Birkenhead, that funding will support further investment in the town centre, including, at Hind Street, the removal of the flyover that links the local highway network to the Queensway tunnel toll plaza and severs the town.
While I welcome any town or regeneration funds, the funding the Minister mentions is specifically for the regeneration of Birkenhead. What we are talking about is transformational change in transport. I have not heard in the Minister’s response about any changes that are coming any time soon. That is what we are talking about: transformational change to buses and transport on Merseyside and in the Liverpool city region.
In the 26 seconds left, I will say that the national bus strategy, which is part of a £3 billion spend on buses over this Parliament, should address many of the issues about buses raised by hon. Members. Obviously, during the pandemic, we provided £1.5 billion in emergency funding to keep the buses in the region going. We have supplied the region with £710 million in dedicated funding for active travel, and more has been announced by the Chancellor as part of a £2 billion package.