Question to the Ministry of Housing, Communities and Local Government:
To ask the Secretary of State for Levelling Up, Housing and Communities, if he will introduce a set of flood resilience baseline building regulation standards for new properties and properties that have been flooded which are being reinstated.
Statutory guidance to the Building Regulations in Approved Document C Site preparation and resistance to contaminants and moisture already promotes the use of flood resilient and resistant construction in flood prone areas
National planning policy is clear that inappropriate development in areas at risk of flooding should be avoided. Where development is necessary, it should be made safe and resilient – and without increasing flood risk elsewhere. Mitigation measures such as defences, landscaping or raising floor levels can sometimes make development acceptable in such areas. Such measures can be made a requirement of any planning consent.