Railways: Mid Bedfordshire

(asked on 7th December 2023) - View Source

Question to the Department for Transport:

To ask the Secretary of State for Transport, what steps he is taking to increase the number of train services in Mid Bedfordshire constituency.


Answered by
Huw Merriman Portrait
Huw Merriman
Minister of State (Department for Transport)
This question was answered on 12th December 2023

The pandemic has changed travel habits and all operators are required to continually review their services to ensure they are providing a timetable that is appropriate to the latest passenger demand, is fit for the future, and carefully balances cost, capacity, and performance. GTR’s timetable matches the current levels of passenger demand.

A full timetable including a Saturday service resumption on the Marston Vale Line between Bedford and Bletchley is expected in early 2024, with driver training of the Class 150 trains well underway.