Water Abstraction: Teddington

(asked on 2nd September 2024) - View Source

Question to the Department for Environment, Food and Rural Affairs:

To ask the Secretary of State for Environment, Food and Rural Affairs, if he will make an assessment of the potential impact of the Teddington Direct River Abstraction project on water quality in its vicinity; and if he will take steps to ensure the adequacy of water quality for swimming in that area.


Answered by
Emma Hardy Portrait
Emma Hardy
Parliamentary Under-Secretary (Department for Environment, Food and Rural Affairs)
This question was answered on 20th September 2024

Teddington Direct River Abstraction (DRA) is a water recycling scheme considered in Thames Water’s draft Water Resources Management Plan 2024 (dWRMP24) and Water Resources South East’s (WRSE) Regional Plan as a supply option for 2030/31.

The Environment Agency has scrutinised WRSE’s plan and has responded to Thames Water’s DWRMP24. Any scheme developed will have to meet environmental requirements. The scheme will need environmental permits that the Environment Agency regulate, and planning consents where the Environment Agency is a statutory consultee.

For Teddington DRA proposal to be taken forward Thames Water will be required to obtain an abstraction license and permit to discharge from the Environment Agency. These set out the conditions under which abstraction is authorised to take place and the standards to which the discharged effluent must be treated, ensuring it is treated to a high standard to meet environmental quality standards and ensure water quality in the Thames does not deteriorate. Thames Water will need to ensure any tertiary water treatment for Teddington DRA meets those regulatory requirements and the Environment Agency will regularly inspect Thames Water to ensure that permit standards are met.

Reticulating Splines