High Speed 2 Railway Line

(asked on 17th December 2014) - View Source

Question to the Department for Transport:

To ask the Secretary of State for Transport, what proportion of the land due to be compulsorily purchased for High Speed Two is required for (a) construction of the track and associated infrastructure and (b) environment mitigation.


Answered by
Robert Goodwill Portrait
Robert Goodwill
This question was answered on 7th January 2015

It is not possible to answer the question as stated. HS2 is an integrated railway that has been designed to avoid and or reduce environmental impacts throughout its development. The approach used to developing this railway has been to fully integrate environmental mitigation into the railway’s design. For example, environmental impacts and mitigations are considered when designing the depth of a particular cutting.

It is therefore not possible to separate the usage of compulsorily purchased land into the two defined categories.