Question to the Department for Environment, Food and Rural Affairs:
To ask the Secretary of State for Environment, Food and Rural Affairs, what estimate she has made of the cost per megalitre of water produced over an eighty-year lifespan of Teddington Direct River Abstraction.
The Teddington Direct River Abstraction (TDRA) project is being developed as a scheme intended to operate intermittently, during periods of drought, rather than as a continuously operating water supply source. The actual volume of water that TDRA may provide over an eighty-year period would depend on future drought frequency, severity, operational requirements and planning assumptions over that period.