Water Abstraction: Teddington

(asked on 7th July 2026) - View Source

Question to the Department for Environment, Food and Rural Affairs:

To ask the Secretary of State for Environment, Food and Rural Affairs, what estimate she has made of the cost per megalitre of water produced over an eighty-year lifespan of Teddington Direct River Abstraction.


Answered by
Emma Hardy Portrait
Emma Hardy
Minister of State (Department for Environment, Food and Rural Affairs)
This question was answered on 14th July 2026

The Teddington Direct River Abstraction (TDRA) project is being developed as a scheme intended to operate intermittently, during periods of drought, rather than as a continuously operating water supply source. The actual volume of water that TDRA may provide over an eighty-year period would depend on future drought frequency, severity, operational requirements and planning assumptions over that period.

Reticulating Splines