Clyde Naval Base: Flood Control

(asked on 21st April 2022) - View Source

Question to the Ministry of Defence:

To ask the Secretary of State for Defence, what steps his Department is taking to ensure that HMNB Clyde is protected from flooding; and how much do those measures cost.


Answered by
Jeremy Quin Portrait
Jeremy Quin
This question was answered on 27th April 2022

We closely monitor and track potential risks to our infrastructure, including flooding both now and into the future.

HM Naval Base Clyde has an extant Climate Infrastructure Risk Assessment that has modelled the potential impact of Climate Change on Sea Defences and Site Infrastructure. This has been independently validated by Ministry of Defence specialists and the Assessment concludes that HMNB Clyde's Sea Defences are adequate to meet potential sea level changes.

The risk of flooding has been integrated within new build project work at the Base, including increased provision of surface drainage and risk mitigating landscape features.

Specific funding for flood prevention is incorporated within Maintenance work and new build projects and is not separately identified.

Reticulating Splines