None Portrait The Chair
- Hansard -

Good morning, everyone. Before we begin line-by-line consideration I have a few preliminary announcements.

Please switch electronic devices to silent. Tea and coffee are not allowed during sittings, but you may if you wish remove your jackets—[Interruption.] I am delighted that the Whip is first off.

We will now begin our line-by-line consideration. The selection list for today is available in the room and on the Bill web page. It shows how the selected amendments have been grouped together for debate. Grouped amendments are generally on the same or a similar issue.

Amendment 20 has been selected even though it is starred. That is because it was tabled before the deadline but withdrawn and re-tabled due to an administrative error.

A Member who has put their name to the leading amendment in a group is called first. Other Members are then free to catch my eye to speak on all or any of the amendments in that group. A Member may speak more than once in a single debate. At the end of the debate on a group of amendments I shall call the Member who moved the leading amendment again. Before they sit down, they will need to indicate whether they wish to withdraw the amendment or to seek a decision.

If any Member wishes to press any other amendment or new clause in a group to a vote, they need to let me know. I shall work on the assumption that the Minister wishes the Committee to reach a decision on all Government amendments when we reach them.

Please note that decisions on amendments take place not in the order that they are debated, but in the order that they appear on the amendment paper. In other words, debate occurs according to the selection and grouping list, and decisions are taken when we come to the clause that the amendment affects. Decisions on adding new clauses or schedules are taken towards the end of proceedings but may be discussed earlier if grouped with other amendments.

I shall use my discretion to decide whether to allow a separate stand part debate on individual clauses and schedules following the debates on relevant amendments.

I hope that explanation is helpful.

Clause 1

Smart meters: extension of time for exercise of powers

Steve McCabe Portrait Steve McCabe (Birmingham, Selly Oak) (Lab)
- Hansard - -

I beg to move amendment 1, in clause 1, page 1, line 4, leave out ‘1 November 2023’ and insert ‘31 December 2020’.

This amendment would reduce the proposed extension of powers to align them with the planned completion of the smart meter rollout.

None Portrait The Chair
- Hansard -

With this it will be convenient to discuss the following:

Amendment 2, in clause 1, page 1, line 9, leave out ‘1 November 2023’ and insert ‘31 December 2020’.

This amendment would reduce the proposed extension of powers to align them with the planned completion of the smart meter rollout.

Amendment 3, in clause 1, page 1, line 12, leave out ‘1 November 2023’ and insert ‘31 December 2020’.

This amendment would reduce the proposed extension of powers to align them with the planned completion of the smart meter rollout.

Amendment 4, in clause 1, page 1, line 16, leave out ‘1 November 2023’ and insert ‘31 December 2020’.

This amendment would reduce the proposed extension of powers to align them with the planned completion of the smart meter rollout.

Amendment 5, in clause 1, page 1, line 19, leave out ‘1 November 2023’ and insert ‘31 December 2020’.

This amendment would reduce the proposed extension of powers to align them with the planned completion of the smart meter rollout.

Steve McCabe Portrait Steve McCabe
- Hansard - -

Good morning. It is a pleasure to serve under your chairmanship, Mr Gapes. I should probably confess to you that this morning in the railway station, as I discovered that the 8.30 and 8.50 trains had both been cancelled, I wondered about phoning you to ask whether I could be the first Back Bencher to make it into Hansard by moving the amendment on Skype. I was intrigued to know what your ruling on that might be. However, as I am sure the Minister and his colleagues are relieved to hear, at the 11th hour a train arrived. It was an interesting journey, but I made it here.

The amendment seeks to reduce the period for which the extension of the licence would apply. Amendments 2 to 5 are consequential. To be clear, I am in favour of smart metering. I believe that it is a technological advance with the potential to save energy use and to reduce customer bills, and it may have wider, long-term and beneficial applications. I assure the Minister that these are not wrecking amendments. Rather, the purpose is to probe, to uncover the explanation for what has gone so wrong with the roll-out so far. What assurances can he give the Committee that an extension of the deadline will result in a satisfactory outcome, not simply allow an extension of the delays and spiralling costs, which have been a feature of the programme to date?

It is the Government’s wish that by 2020 more than 50 million new energy smart meters will have been rolled out to 30 million homes and smaller non-domestic sites. The programme is currently in the main roll-out stage, which is due to end in 2020. However, as I said, it has faced persistent delays. As a result, SMETS 1, the early version of meters that we heard about in the oral evidence sessions, is still being rolled out, and that is scheduled to continue until July 2018.

As I have indicated, there are real benefits from the programme. Smart meters coupled with a functioning in-home display—an IHD, as it is referred to in most of the documentation—can make energy usage and cost visible to customers in near real-time, enabling consumers to change their patterns of consumption. That in turn can help with demand management for the energy supply across the country.

The scale of what remains of the smart meter roll-out programme is immense. Only 8 million meters have been installed so far out of a target of approximately 53 million. That is about 15% coverage, with only three years left of the main roll-out stage.

Stephen Kerr Portrait Stephen Kerr (Stirling) (Con)
- Hansard - - - Excerpts

I am not clear about what would be achieved by a move of date. If, as the hon. Gentleman says, and I agree with him, it is a stiff target to install the remaining balance of meters by 2020, why change the date when the purpose of the Bill is to allow the Secretary of State that flexibility?

Steve McCabe Portrait Steve McCabe
- Hansard - -

As I said at the outset, the purpose of the amendment is to probe the Minister to explain what has happened so far and why he is so confident that in the future he will be able to stick to deadlines that have not been kept to so far. We could simply settle on the date of 2023 as currently specified in the Bill, but it would be remiss of us both as constituency Members of Parliament and legislators to let that go through without being clear about what we have voted for and what the likely implications are. Hence I suggest we look at the date.

Grahame Morris Portrait Grahame Morris (Easington) (Lab)
- Hansard - - - Excerpts

These are important questions. I have received representations from a number of organisations, including National Energy Action, which points out that part of the rationale behind the original timetable was a cost-benefit analysis. It is concerned that if we were to delay roll-out as suggested, and as the Minister is advocating, the benefits to be enjoyed by consumers—particularly hard-pressed consumers on low incomes—would be delayed. Whatever the arguments on supply, there is a cost to consumers. We need to consider that carefully and, as some of the witnesses argued, whether we need another cost-benefit analysis, or whether that would delay the process even further.

Steve McCabe Portrait Steve McCabe
- Hansard - -

There is a new clause to be considered later that would provide for a fresh cost-benefit analysis, partly on the basis that with the most recent one there was a significant downward revision of the benefits identified. Clearly, to let the programme trundle on, without any idea of the costs and benefits, might mean that we are doing constituents and customers a severe disservice.

As I was saying, the roll-out has reached the stage of about 15% coverage, with three years to go. The Government are on record as saying, only last month, that nearly 350,000 meters are being installed each month; but to reach 100% coverage by 2020 more than 40,000 meters a day need to be installed. That is a 70% increase in the installation rate.

Stephen Kerr Portrait Stephen Kerr
- Hansard - - - Excerpts

I am a little confused; perhaps the hon. Gentleman can help me. Is the objective to offer smart meters to every one of the 53 million establishments by 2020, or to complete installations? Currently an offer is being made, and there is no mandate on consumers to install a smart meter. I am not sure that it is possible to have a target of 100% completion by 2020 on the basis of an offer to consumers.

--- Later in debate ---
Steve McCabe Portrait Steve McCabe
- Hansard - -

The Minister may want to help the Committee with that, but my understanding is that he has an installation target. Clearly there will be people who refuse to accept smart meters, and that will inevitably affect any overall figure; but, as far as I understand the matter, the Government have an installation target. My point is that if they need to achieve a 70% increase in the daily rate, that does not seem to be likely or credible; it is not on the cards. However, the Government are adamant that the 2020 target is achievable—a sentiment that the Committee will remember was echoed by some of the witnesses we heard from on Tuesday. I think that we need to hear from the Minister how he will achieve that.

A recently circulated myth-busting document from the Department for Business, Energy and Industrial Strategy says it is a myth that the Bill

“is just a means of extending the roll-out until 2023.”

It states:

“Reality: Energy suppliers remain legally obliged to complete the roll-out by the end of 2020.”

If BEIS is right in its myth-busting, why does the Secretary of State need such an extension of powers to develop, amend and oversee regulations relating to smart meters? If the energy suppliers are legally obliged to complete by 2020 and it is a myth to suggest that the Bill is simply about creating an extension, and BEIS is confident about that, why are we here discussing an extension to 2023?

Alan Whitehead Portrait Dr Alan Whitehead (Southampton, Test) (Lab)
- Hansard - - - Excerpts

Will my hon. Friend consider myth-busting the myth-busting? It is not the case that all suppliers are legally required to install smart meters by 2020: it is those suppliers who are under an obligation, because they have more than 250,000 customers, to pay and take part in green and social tariffs. Suppliers with fewer than 250,000 customers have a target to supply by 2020, but are not legally obliged to do so. That may be of use to my hon. Friend in considering the target itself. The fact that some companies do not have the same obligation may be cause for further thought about whether targets will be reached.

Steve McCabe Portrait Steve McCabe
- Hansard - -

I am extremely grateful to my hon. Friend for that observation. Unfortunately, I have relied on the wording of the Department for Business, Energy and Industrial Strategy and its myth-busting document. However, it is very helpful to hear what my hon. Friend has just said and it would be extremely helpful if the Minister took that point on board when he seeks to enlighten the Committee on how we will proceed.

What will happen to energy suppliers if they fail to meet the roll-out targets by the end of 2020? So far, the Government have indicated that the reasons for the extension are

“to remove delivery barriers, protect consumers, and help households and small businesses continue to get the most from their smart meters once installed.”

We heard on Tuesday that some customers cannot possibly be getting

“the most from their smart meters”,

because once they are installed and the customer switches provider, they cease to be a functioning smart meter. So I can see why the Minister is keen to address that problem.

Perhaps the Minister would be kind enough to explain to the Committee exactly how an extension to 2023 helps achieve each of those stated aims. If the target for installation is going to be met by 2020, as BEIS asserts, there will be no “delivery barriers” to remove. Also, it is unclear what protection the Government think customers would need in relation to the roll-out, unless it is specifically about this question of the problem that arises when people try to switch providers.

Dan Carden Portrait Dan Carden (Liverpool, Walton) (Lab)
- Hansard - - - Excerpts

Surely this delay in the roll-out, potentially to 2023, would also have a significant effect on the Government’s cost analysis. We have heard about the astronomical sums of money that are involved in the roll-out. Has my hon. Friend had any indication of what a delay would mean for the cost of this scheme in the future?

Steve McCabe Portrait Steve McCabe
- Hansard - -

I hope that before the Committee concludes its business, all of us here will have a much better understanding of exactly what this programme currently costs and what it is likely to cost by the time of completion. I was quite taken aback at the evidence session on Tuesday when one of the witnesses told us that the cost to the customer had already gone up in 12 months from £5 to £13. If we multiply that increase over the period of the extension that is now under discussion, we can see that, far from being a measure designed to cut the energy costs for consumers, the Bill could well load cost after cost on poor people who are already struggling to pay their energy bills.

That is one of the reasons why, in discussing the Bill and deciding whether to give the Minister this extension and these approvals, we need to be absolutely clear what we are committing to. It is on us in this Committee to determine whether we are genuinely standing up for customers, or whether we are considering the implementation of a programme that is primarily designed to provide benefits to suppliers, in the sense that the suppliers are meant to make the savings and then pass them on to the customers. If we were to end up in a situation whereby the benefits to the customer are not realised and the costs to the customer rise exponentially, that would be a disaster and a total dereliction of our responsibilities.

Dan Carden Portrait Dan Carden
- Hansard - - - Excerpts

Yesterday, we sat through the Budget and heard very specific sums of money being put here, there and everywhere. Is it my hon. Friend’s understanding that the budget for the roll-out of smart meters is unlimited?

Steve McCabe Portrait Steve McCabe
- Hansard - -

Again, I defer to the Minister; I genuinely look forward to hearing his explanation of this situation. It is my fear that, although the budget may not be unlimited, the costs are loaded on the consumer and the costs to the consumer could be unlimited. We could find that, instead of protecting people, we are loading them with costs into the foreseeable future.

None Portrait The Chair
- Hansard -

Order. There is potential to go into a large number of issues on this amendment. I would be grateful if hon. Members, as far as possible, focused on the terms of the amendment we are debating and others in this group. We will have an opportunity later to discuss some of the wider issues.

--- Later in debate ---
Steve McCabe Portrait Steve McCabe
- Hansard - -

I am grateful for that guidance, Mr Gapes. Of course, the amendments are about restricting the date.

Interestingly, not one expert witness we heard from gave a clear reason why it is essential to agree a date of 1 November 2023. What I really want to know is, what is so important about that date, given that 2020 is the key year for the project? Is it arbitrary or pragmatic? It just happens to be five years in the future, and it might reasonably be expected that a great many of those currently connected with the delivery of this programme will have moved on to other things after that time—they might not be quite as culpable or responsible as they would be if the date were a bit closer. Can the Minister offer any additional insight about why he chose that specific time?

I am pursuing this matter because it is my contention that the project is littered with set-backs. I am conscious that the Minister inherited this brief recently, and I certainly do not hold him responsible for what has happened to date. None the less, the main national roll-out was initially intended to begin in 2014 and be complete by 2019. In 2013, the then Secretary of State, the right hon. Member for Kingston and Surbiton (Sir Edward Davey), announced that he was putting the start date back to 2015 and the completion date back to 2020. He said:

“The consistent message was that more time was needed if the mass roll-out was to get off to the best possible start and ensure a quality experience for consumers.”

Well, he gave them that extra time, and here we are with a Bill that says, “Give us more time again.” That is the situation we have arrived at.

It is probably fair to say that the industry, especially the suppliers but also the middle men—the asset providers, to whom I am not quite so well disposed—wants certainty, and I am not at all convinced that the 2023 date provides that. It simply extends the completion date. Surely the Minister can see that it makes no sense to insist on a target that nobody believes in and simultaneously create a provision in the Bill that allows it to be extended beyond 2020. It is tantamount to saying, “Don’t worry—we are not really serious.”

Grahame Morris Portrait Grahame Morris
- Hansard - - - Excerpts

The arguments for extending the roll-out period are contentious. I refer my hon. Friend and the Committee to the evidence that Mr Derek Lickorish from Secure Meters gave when my hon. Friend the Member for Liverpool, Walton asked that question. Mr Lickorish identified two impediments: one technical and one commercial. He argued that the 2020 date was achievable, and said:

“I think that Ofgem ought to be able to bring the people round the table who can solve these”

commercial and technical

“issues. I do not think they are particularly visible at the moment.”––[Official Report, Smart Meters Public Bill Committee, 21 November 2017; c. 37, Q68.]

So there are mixed opinions about the feasibility of the benefits of extending the period. The Committee needs to be convinced of the benefits of allowing a longer roll-out period, because the experts who presented evidence to the Committee were not absolutely clear and of one mind.

Steve McCabe Portrait Steve McCabe
- Hansard - -

I am grateful for that. That is exactly the point I have been endeavouring to establish. I cannot see how the Minister can reconcile an insistence by his officials, which he is forced to mouth on occasions, that the roll-out will complete by 2020 and at the very same time take powers to extend it to 2023. The point questions exactly what is going on.

I can think of various projects that Governments have insisted would complete on time and within cost over the years—I will not go into them in detail—but of all Governments this one is littered with projects of this kind where the plug is ultimately pulled, particularly on IT projects, and usually after enormous cost to the taxpayer. The main difference here is that the enormous cost, as I said earlier, is to the consumer. We are putting the cost directly on to the consumer.

My fear is that unless the Minister—I am hoping genuinely that he will be able to do this today—can offer a convincing explanation for why he has selected 2023 as the period of his extension, unless he can give an assurance that we have not yet heard of what has changed to make this completion target very likely now, and unless he can offer a convincing explanation for what has gone on before, I do not see how in all conscience we can be confident that we are making the right decision.

Grahame Morris Portrait Grahame Morris
- Hansard - - - Excerpts

To clarify the point about costs—

--- Later in debate ---
None Portrait The Chair
- Hansard -

That is for later. When we discuss other matters it will be in order. I would rather not have a general debate on the amendment. We can have a debate on other clauses as we consider the Bill, but I do not wish us to have a general debate at every point. If interventions can focus on the amendments before us at this time, it will be helpful.

Steve McCabe Portrait Steve McCabe
- Hansard - -

Thank you, Mr Gapes. As I indicated at the outset, I am not opposed to the smart meter programme. I do not regard these amendments as wrecking amendments. I hope the Minister will accept that they are deliberately probing because they seek to establish, as I was saying, why we should have confidence in the new date and what the justification for the time period is, as well as how we can understand what has happened and how we can be confident that things have been put right so that the process will not continue to repeat itself.

One of the consequences of such repetition would be escalating costs. I suspect that that is the point that my hon. Friend the Member for Easington was referring to. [Interruption.] My hon. Friend has just passed me the evidence from Mr Lickorish, which points out his extreme concern about the way these costs will escalate. However, I think it will be better if I stay with the date.

None Portrait The Chair
- Hansard -

Yes, it would.

Steve McCabe Portrait Steve McCabe
- Hansard - -

I simply say that my fear is that we could end up agreeing a timescale that does not have safeguards or an obvious justification, which in itself is an opportunity for further delay and is perhaps a recipe for failure. I ask the Minister: would it not be sensible, at this point in the roll-out of the programme, to send a clear message to the industry, consumers and everyone that an extension until 2023 is needed and to make it absolutely crystal clear why that date has been chosen and what will happen in that period—or whatever period BEIS picks? It has been interested in other dates in the past, but now it thinks it should be 2023. Would it not be sensible to send a clear message to the industry, so that we can ensure that the benefits of the programme that the Minister intends are actually realised?

If it is not possible in all conscience to do that and to convince the Committee that we are on track for that outcome, would it not be sensible to revert to the 2020 target and to actually develop a sense of common purpose that says to all those people engaged in the programme, “You said you could do this. We are telling you that 2020 is the delivery target. We are absolutely clear that that is where we are heading”? Would it not be sensible to stop the backsliding and to say that what we actually want is to deliver what we are telling the public we are capable of delivering? We simply cannot have it both ways; we cannot be emphatic on both points. There is either an achievable deadline of 2020, and all the statements from the Department are believable, or that deadline is unachievable and the Minister needs to set a new deadline, explain it and justify it and convince us that that one is deliverable.

Alan Whitehead Portrait Dr Whitehead
- Hansard - - - Excerpts

My understanding of my role, with regard to the amendments, is that I am not summing up on behalf of the Opposition but speaking in support of the amendment put very ably by my hon. Friend the Member for Birmingham, Selly Oak just a moment ago. Before I say anything else, I need to emphasise, as my hon. Friend did, what the Opposition think about the Bill as a whole and what we think about smart meters and their roll-out.

We need to be clear from the start that we are certainly not opposed to the Bill overall and we are certainly not opposed to smart meters. We think that smart meters are not only a desirable but a necessary part of the process of smartening up our energy systems as a whole, and that they will have considerable benefits for both consumers and the energy system as a whole when they are rolled out.

We are also anxious to see that that roll-out proceeds in a timely fashion and that we have a substantial coverage of smart meters at the earliest possible stage, so that those benefits can start to be realised. Indeed, as we heard in oral evidence, there are quite a few issues relating to how many smart meters need to be installed in order for those benefits to start rolling out. Getting those numbers in is an important part of the process of realising benefits for the future.

The amendments we are talking about, and indeed clause 1, are about the process of changing the date by which time licensable activities will have ceased from 2020 to 2023. Whether or not it was a wholly wise idea, the 2004 and 2008 Energy Acts and subsequent regulations specified a date for those licensable activities to end, so after 2018 the Government will have no control over what goes on. Everybody knows that in 2018 we will still be at a relatively early stage of the roll-out. It is impossible to conceive that it would be wise to continue with the original timetable, so we support the idea of specifying a more satisfactory date in the statute book.

The date specified in the Bill is 2023, but as my hon. Friend the Member for Birmingham, Selly Oak pointed out, that does not appear to coincide with the Government’s publicly stated ambition for the end of the roll-out. I say that with caution, because their statements about the roll-out have changed over time, but they have always revolved around the idea of ending it in 2020. There has been a lot of talk from the Government about 53 million smart meters being installed in homes by then. Indeed, the “frequently asked questions” page of the Smart Energy GB website states:

“By the end of 2020, around 53 million smart meters will be fitted in over 30 million premises (households and businesses) across Wales, Scotland and England.”

However, the Government have changed their position; they are now saying that by the end of 2020, 53 million customers

“will have been offered a smart meter”—

a very different proposition. We could interpret that as 53 million people being offered a smart meter by 2020, but only 10 million having them installed, although I assume that that is not what the Government mean. That statement may be meaningless or meaningful, depending on what happens before the end of 2020 and on a variety of issues that will appear along the road, many of which the Committee will examine in its consideration of the Bill.

--- Later in debate ---
That relates directly to my third thought about why the 2023 date may be required. There could be such concern in Government about the fact that SMETS 2 meters are not appearing in the way they should that an extension is needed to accommodate the roll-out problem. That is to say that there may well be a hiatus when the SMETS 1 meter installation comes to an end and the SMETS 2 meters, for various reasons that we may go into in greater depth, are not yet fully available, and there may well be a problem of empty vans going around with nothing to install for a period.
Steve McCabe Portrait Steve McCabe
- Hansard - -

Is the scenario that my hon. Friend depicts not the reason why the Minister has to explain fully the purposes of the timescale he has selected? That is exactly what some of us fear.

--- Later in debate ---
Lord Harrington of Watford Portrait Richard Harrington
- Hansard - - - Excerpts

I repeat that it is absolutely to extend the Secretary of State’s powers. I was going to mention the 2023 issue and the reason for that. In fact, I scribbled myself a note to answer the hon. Gentleman’s comments about it. So as not to repeat my own scrawl—in fact, I will repeat my scrawl later, because I cannot remember where I put the note.

On the 2023 issue, a lot of things in the powers are not about the targets. Richard Milhous Nixon, whose biography I have just been reading, said, “If you’ve got them by the balls, their hearts and minds will follow.” I do not know if that is unparliamentary; if it is, I apologise. We could easily say, “That’s it; we will leave those powers, because then they will do it”, but that is not what is happening. I am not a fan of Richard Milhous Nixon, for those who might think that, but it struck me that that often in life, that is why people do things.

A lot of things in the powers that are needed will be involved in winding up. I will cover them a little bit later. I do not think it would be possible for any organisation to suddenly give a date—31 December or November or whatever—when the powers run out and that is it. A lot of the things involved go beyond the target. The targets are made with the suppliers. It was asked what happens if suppliers do not do this. There are powers to fine; the regulator has powers to fine suppliers, from memory—if I am wrong by a bit, I will correct the record—10% of turnover if they do not comply with the agreed targets.

Steve McCabe Portrait Steve McCabe
- Hansard - -

Will the Minister give way on that point?

Lord Harrington of Watford Portrait Richard Harrington
- Hansard - - - Excerpts

Go on—I cannot resist the hon. Gentleman.

Steve McCabe Portrait Steve McCabe
- Hansard - -

It is a very simple question. The Minister says the regulator has those powers, but is there any evidence that they have been exercised?

Lord Harrington of Watford Portrait Richard Harrington
- Hansard - - - Excerpts

They have not needed to be yet, but they are there. The hon. Gentleman does not mention—no one has given any credit for this—the 7 million smart meters that have been installed. That is quite a lot of smart meters. I have seen the programme that has been put out, and having spoken to so many of the companies and organisations involved, I am satisfied that it is a realistic target. I had better make some progress; I will not be able to address his amendment properly unless I do.

For me, this is the most significant thing that has happened in electricity, but also in power supply to homes, since Edison or whoever it was—hon. Members will have to excuse me; it is a long time since I did it at school.

--- Later in debate ---
Lord Harrington of Watford Portrait Richard Harrington
- Hansard - - - Excerpts

I know we have four more days, but I would like to make progress on this particular point, although I will give an example that might be acceptable to the hon. Gentleman. As an example, it may be necessary to create new licensable activities to ensure that all premises can secure a home area network if that cannot currently be achieved. Technology develops, as do apps, different systems and inventions. It is for us to be able to act quickly so that there is flexibility for the consumer to take advantage of all those things.

Our current explanation is that we may know when solutions are appropriate and viable for these premises only towards the end of 2020 or even in early 2021. I must say, clearly, that we would use this power only after going through the normal policy development process, including consulting relevant stakeholders. I feel that I have done my best to make that point. It is for us to show leadership in this matter. The decisions taken up to now have driven this momentum, and whatever has been said on cynicism about the targets, the installation volumes are increasing dramatically and it is important that we can keep a robust regulatory framework that enables the delivery of the benefits.

It is vital that this work can continue and that the Secretary of State retains the powers available to him to direct the efficient delivery of the roll-out. I am sure that hon. Members will take these points into consideration, other than the target itself, which we have discussed. The last thing that hon. Members want is a cliff edge—they argue against cliff edges many times on the Floor of the Chamber—and the last thing that we want in this case is a cliff edge. I hope that the hon. Gentleman will find these arguments reassuring and that he will feel able to withdraw his amendment

Steve McCabe Portrait Steve McCabe
- Hansard - -

I am conscious of the time, but I want to be dead straight: I did not find that particularly reassuring, if I am honest. If hon. Members look through Hansard, they will find that I raised a number of questions that have not really been answered at all. As I said at the outset, the amendment was intended as a probing amendment, so I do not intend to push it to a vote at this stage. I recognise that the Minister is very sincere in his approach to this matter, but will he reflect on some of the points that have been made during this part of the debate? Perhaps at a later stage in Committee or in the Bill’s progress, he will see whether he can be a bit more persuasive with the quality of the answers that he provides. I beg to ask leave to withdraw the amendment.

Amendment, by leave, withdrawn.

Ordered, That further consideration be now adjourned. —(Mike Freer.)