Debates between Robert Neill and Tracey Crouch during the 2017-2019 Parliament

South Eastern Rail Franchise

Debate between Robert Neill and Tracey Crouch
Tuesday 27th November 2018

(5 years, 10 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Robert Neill Portrait Robert Neill
- Hansard - -

That is absolutely right. A number of us have raised these issues in the past, and we raise them today because the franchise is due for renewal. It was consulted on in 2017 and is due for a decision imminently.

My constituents are deeply concerned that we will simply get more of the same. I have said publicly, and I have said it to his face, that the Secretary of State missed an opportunity to shake up the franchise when it was re-let on its current geographical basis. I believe, as do many of my constituents, that there is an inherent tension between the needs of those commuter trains that come up from the coast and those that are part of the London metro service, where they are fulfilling a function similar to that of the tube. It is very difficult to reconcile the inevitable conflicts between the two in the current configuration of the franchise.

Tracey Crouch Portrait Tracey Crouch (Chatham and Aylesford) (Con)
- Hansard - - - Excerpts

I am a Member of Parliament who represents one of the areas where the train comes up from the coast. Along with colleagues from Maidstone and the Weald and Tonbridge and Malling, I have significant concerns about the amount of house building going on. The train service infrastructure is not necessarily there to support that. Does my hon. Friend agree that when a commuter is paying more than £5,000 a year to get into work in London, they expect the service to match the cost?

Robert Neill Portrait Robert Neill
- Hansard - -

That is absolutely right, and I have total sympathy with those further down the line. Investment has not matched capacity. The few trains that come up from the coast and stop at somewhere such as Bromley South are crowded by the time they get there. Despite the promise that the London Bridge rebuild would solve the congestion, it has not, and all too often, it is necessary, for whatever reason, for the signalling arrangements to let trains from the coast go through, sometimes not full, while people are sitting on commuter metroland trains that are absolutely rammed. That is not working for anybody. We also frequently get points failures in that first six miles out of London, and that affects everybody who uses the network, however far they are going.

It is no exaggeration to say that I could probably fill the whole of this half hour by reading out emails, tweets and messages from social media sites that I have received since this debate was announced. I have had scores and scores. The numbers are perhaps exaggerated this time because of the publicity, but it is more or less a normal arrangement for me. There is not a day on which I do not see some complaint or other about some failing on the trains.

I commute up every sitting day from Chislehurst and I see it myself. I got the 8.09 from Chislehurst today. That is supposed to be a service of about 25 minutes, but I allow half an hour, to Charing Cross. That is not what it is supposed to be, but nobody expects these trains to run exactly to time—that is how bad it is. It is an exception if it runs to the minute. As it was, we arrived at 8.55, so it took nearly three quarters of an hour. My maths is not brilliant this afternoon, and I will be generous, but that is a 30% or 40% increase on what the journey time is supposed to be. That is not an exception; all too often, it is the norm.

Constituents say to me that they like the area, but are seriously thinking of moving because the trains are unreliable. As the hon. Member for Erith and Thamesmead (Teresa Pearce) said, that is compounded by the failure to invest in stock. Short train formations are a regular bane on both my lines and those going into north Kent, which creates serious overcrowding at peak hours. There is also pretty poor communication in terms of making people aware of last-minute cancellations and changes. The one shining light of Southeastern is the quality of the station staff at our local stations. I have found every one of them to be absolutely excellent; they really do their best and are well linked into the communities they serve. It is not their fault. It is a case of lions being led by donkeys, as far as the operation of the franchise is concerned. They deserve better leadership and could do with better investment in some of their stations. They have to bear the brunt of the frustration of passengers who pay a lot of money and are simply not getting the service they are paying for.

The issues have been well documented. The Department conceded that the number of responses to the consultation on the proposed renewal of the franchise was “unprecedented”. It is not surprising, given the amount of anger and angst. There are assurances that the new franchise documents will meet the concerns and that they will be taken on board. People’s trust is running pretty thin. The Minister is new to his post, but trust in the Department is running thin as well, as is trust in the regulatory apparatus and the operator. We were told that there would be much more joint working. The reason given for not redesigning the franchise and putting the metro services into Transport for London was that the Secretary of State wanted to bring train and track together. Although there have been efforts at joint working and there is a joint board, in practice what I seem to get is senior managers from both sides coming and giving me their excuses together rather than separately. I am not sure that it makes much difference to my constituents on the platforms.

There are some pretty blatant examples beyond the daily grind of cancellation and failure. When I was sitting on the train waiting to get into Lewisham about 10 minutes behind time, I had a tweet from one of my constituents, Tommy, who is known to Network Rail because it tried to block him once, because it did not like the fact that he was calling it out for the errors that it was consistently making. He tweeted about three trains delayed in the Lewisham area. He was spot on. That was because they had all been held to allow a late-running Dartford train, which was already behind schedule, to come through. Owing to the way it was operated, there were now four trains behind schedule. Clearly, that joined-up working is simply not happening.

We have had other errors on basic things such as timetabling. A lot of my constituents travel from Bromley North and Sundridge Park, then change to the mainline at Grove Park. That is a busy station, because even trains that start from Orpington are pretty full by then. The timetabling means that often people have one or two minutes to get from one side of Grove Park station—it has about four mainline tracks plus a baby platform stuck on one side—to the other. It is a very short period for people to have to go up a lengthy walkway and then on to a footbridge. That is assuming that the mainline trains run to time. When they do not, the shuttle service leaves without people. People either run—and sometimes slip, as I have seen on the footbridge—and pile on to an overcrowded train, or else they are left hanging around for perhaps half an hour until the next shuttle returns.

Local MPs and I have repeatedly raised the issue of timetabling. Time and again, I have said, “Why can you not align the timetables properly on the Grove Park branch?” but nothing has ever happened. Only three stations can be saved on the app’s dashboard, yet most people would like to have a choice of which London terminal they go from if there are going to be problems. That has been raised time and again with the most senior level of management. They say, “That’s an interesting idea,” but nothing ever happens.

About a year ago, there was a scandalous incident that ended up being investigated by the rail safety authorities. Just before Christmas, about half a dozen trains were stranded for up to four hours in the Lewisham area, affecting both sets of lines. There was very heavy snow and there were poor weather conditions—I accept that the central rail form of electricity on that line is particularly susceptible—but there was a complete failure to rescue people from the trains in any decent time, as my constituents regularly point out to me. A plan was supposed to be put in place to get people out of those trains—it should have been activated within an hour and got people out within two—but it failed. We had people sitting on those trains for five to six hours with no power.

One might think that something would have been done about that after the report was published by the Rail Accident Investigation Branch, but my constituents remind me that there have been another four incidents of people being stranded for two hours or more. The basic procedures for getting people off delayed trains are still being ignored—there is no other word for it. That seems to be an extraordinary failure.

I could go on at length. An excellent councillor for Bromley Town, Will Harmer, has just tweeted me. He says of the Grove Park scenario:

“Yes, it happened again last night. Train just left as the first person got on to the platform.”

How many times do people have to say that before it sinks into the minds of the people who run Southeastern trains? Another message reads:

“Thanks for raising this, Bob. The delay problems have been steadily getting worse. Southeastern trains have been getting away with murder.”

My constituent Alex Le Vey commutes, and he says:

“The service is getting worse—more overcrowding, more delays.”

Another constituent says:

“Trains are late almost every day. The 17.52”—

it goes down to the Medway towns—

“is 15 minutes late on average, and only on time 20% of the time.”

I mention that because managers, Department officials and Ministers often come out with statistics and say, “Actually, things are improving. Things are getting better. Statistics show that reliability has gone up.” That is not the lived experience of people on the trains and platforms. On the operation of Southeastern trains, I am inclined to take the view that there are

“lies, damned lies and statistics”.

Looking at that scenario, it is understandable that we have real concerns about the franchise renewal. We might well get the same operator or one very much like it.