Commons ChamberThe other problem is that the people behind the proposition live from hand to mouth. They said, “There’ll be a way around this, because we’ll be able to divert quite a lot of the local services that come into Euston to Old Oak Common and therefore relieve the pressure on Euston during the works period.” They have now admitted, however, that they cannot divert the local services to Old Oak Common to bring about that relief, so they are still lumbered with the fact that they will louse up access to Euston station for the next dozen to 15 years.
I am sure my hon. Friend will agree that an alternative option for improving the passenger service from London to Birmingham would be substantially to improve the performance of the Chiltern line and thus relieve a lot of passenger need on the west coast main line. All over the country, minor improvements to the track, signalling and electrification could bring about big improvements for passengers. As a lad originally from just outside York, I am always conscious of the fact that the east coast main line is electrified from King’s Cross to Leeds and from King’s Cross to Edinburgh, but that the link between York and Leeds is not electrified. Consequently, anyone who wants to go to Leeds from Edinburgh, Newcastle or Durham cannot do so on an electrified train; they have to change at York or find one of the trains that are still diesel.
The right hon. Gentleman is absolutely right. Is it not the case that it takes almost as long on the train to get from Leeds to Liverpool as it does to get from Leeds to London? It is, therefore, bizarre that so much money is being spent to try to make it quicker to get from Leeds to London when many people would prefer it to be quicker to get across the north of England.
Indeed. When the capacity argument fell through—the proponents threw in the towel—they turned to economic growth. However, if they look at virtually all the foreign experience, they will see that when a high-speed line is put in to a capital city, that capital city sucks in business and jobs from the other places on the line. That is significant to those who live in smaller towns near the cities where HS2 stations are proposed, because there is considerable evidence that those smaller towns will lose business to them. If a station is built in Manchester, towns in Rochdale, Oldham and other surrounding areas could lose trade, jobs and prosperity to Manchester. That might be okay for Manchester, but it would not be too good for Greater Manchester.
Rail improvements are needed in the north of England. The time it takes to travel from York to Manchester and from Leeds to Liverpool is a disgrace. High Speed 3 is now being talked about, but I think there would be a bit more support for High Speed 3 if it became High Speed 2. A lot of local services in the north of England need to be improved, as well as the interconnections between the big cities.
People talk about the economic benefits that High Speed 2 will bring to cities in the midlands and the north. The cost will be £50 billion and it is intended that five cities will benefit: Birmingham, Nottingham, Sheffield, Leeds and Manchester. As I suggested in one debate, if that £50 billion were split between those cities, giving them £10 billion each, and the people of, say, Manchester and Sheffield were asked in a referendum what they would do with their £10 billion, the chances are that they would not say that the first thing they needed to do was to club together for a high-speed railway. That would be pretty unlikely. Perhaps there should be local referendums.
Some of us are decried for being neanderthal and opposed to progress. People say, “What about the wonderful progress that was made by the great railway entrepreneurs of the 19th century?” A lot of those projects in the 19th century were characterised by bankruptcy, fraud, deception, thieving from shareholders and God knows what else. George Hudson of the Great Northern railway invented the Ponzi scheme about 100 years before Ponzi was born.
Those entrepreneurs did get the things built—that is a fair point—but if we want to rely on 19th-century examples, and if High Speed 2 is such a good idea that it could be put to a referendum and people would agree to it, surely we should be asking why the private sector is not desperate to build this new railway. Why should the taxpayer have to find the money, when historically in this country it is not the taxpayer who has done so? There seems to be no rush to come up with the dosh privately to invest in this scheme. Perhaps that is because outfits such as the Institute of Economic Affairs and the Institute of Directors—not organisations I usually quote, I freely admit—think that it is a total waste of time. Broadly speaking, they think it is crackers.
That brings me to the most recent report of the Public Accounts Committee, to which the hon. Member for Christchurch (Mr Chope) referred. To say that it is a lukewarm endorsement of High Speed 2 is to wildly exaggerate the Committee’s enthusiasm for it. I need my glasses to give you the full benefit of the report, Madam Deputy Speaker. It says:
“The Department for Transport is responsible for a number of ambitious, expensive transport infrastructure programmes including the planned High Speed 2 programme. We are not convinced that these programmes are part of a clear strategic approach to investment in the rail network… The Department told us it will deliver the full High Speed 2 programme within its overall funding envelope of £50 billion.”
For a start, it is not £50 billion, because HS2 admits that if the scheme were to work, Euston station would not be able to cope with the extra passengers and would be overwhelmed. Crossrail 2 would then be needed, at an additional cost of £20 billion. If the scheme were to work—if all the optimistic prognostications of those who are in favour of it came to be—it would require a further £20 billion. Quite frankly, it is deceptive of the Government and High Speed 2 to talk about £50 billion. Usually, they do not even like to talk about £50 billion: they talk about £43 billion and then reluctantly admit that they need another £7 billion for the locomotives—it was perhaps going to be a train-free railway at one time—and we have to bear that point in mind.
I want to express my own views and those of the people who live in my constituency. Crossrail 1 is causing a bit of trouble here and there, but, broadly speaking, people have been willing to go along with it. Originally, the proposal for the channel tunnel link was that it should come into a huge concrete box under King’s Cross station. The sort of people who are now proposing HS2 said, “This is the only way to do it. There is no possible alternative. We are the experts. We know everything.” They ended up having to admit to a Committee of this House that was considering the Bill that their concrete box was too short for the proposed train. That was the quality of thought that went into the proposal.
When I first suggested to the planners that the best thing to do would be to use St Pancras station, which was grotesquely underused, I was treated like a total idiot: “Pathetic! How could he possibly come up with such a silly idea when our concrete box under King’s Cross is a masterstroke?” They eventually abandoned the masterstroke and we now use St Pancras station. I am pleased that if someone gets a train from St Pancras to the Gare du Nord, they really know that Britain is best, because the Gare du Nord is horrible and St Pancras is a credit to everybody except the railway planners, because they were not in favour of using it originally.
Similarly, despite the problems that have been caused in my area, there has been, broadly speaking, full support from nearly everyone there, including myself, for the massive improvements at King’s Cross station, all of which were started under the Labour Government, with the support of myself and local people.
I believe that it is necessary to say to Parliament, “Look, you are letting people down.” The proposals are a disgrace: they are amateurish and grotesquely expensive. Parliament has not been doing its job properly. I mean no criticism of the people who are serving on the legislative Devil’s island that is the Committee stage of the hybrid Bill. Those people should, at the very least, receive double salaries and free passes on the railways for ever. Our procedures let people down and do not reflect the views of people in this country.