(5 years ago)
Commons ChamberI am disappointed to hear what my right hon. Friend has to say and I am more than happy to meet him to obtain further details. It is very important that HS2 Ltd continues to work with local communities rather than acting upon them when it carries out these works. I look forward to hearing further details.
Not only has the Williams review yet to see the light of day, but the Oakervee report is ready. His team has pulled out all the stops to get this to the Minister next week, so why is the Secretary of State saying that he will not publish it until after the general election? Is it because he intends to cut off the economic opportunities of the north, or is he worried that it will upset voters in the south?
I will take no lectures from the hon. Lady on how to support the north economically, or indeed, in transport terms. I am delighted that she lives in a world of alternate reality—neither the Secretary of State nor I have received Mr Oakervee’s report. She clearly knows more than I do, or maybe she is making it up. [Interruption.]
(5 years, 5 months ago)
Commons ChamberIn addition to reviewing the Sexual Offences Act 2003, as raised by the hon. Member for Gloucester (Richard Graham), will the Minister look at families who host international students and who are put in a position of trust over young people?
The hon. Lady raises a good example of a position of trust, which is the sort of thing I want to look at. If she wishes to write to me with further details, I will make sure we include it in the review we are conducting.
(7 years, 1 month ago)
Commons ChamberI think that the rail authorities have already heard what the hon. Gentleman has said. I have noticed that I now get my seat reservation and my ticket on the same piece of paper, instead of on five. As we move towards more forms of paperless ticketing, we should have no pieces of paper at all unless we want them.
We were told £45 million, but the cost was £96 million. We were told 11 train operators co-ordinated, but it was just five working separately. We were told all passengers, but it was just season ticket holders, and full season ticket holders at that. Only 8% of those now eligible are using the system, with its scope cut, and it being overspent and massively overtime—and then the Government handed the problem back to the train operators. From this example in the south-east, can we really have confidence that the Government can deliver smart ticketing?
There is quite a straightforward reason why we can have confidence about the future, and it is largely because the south-east flexible ticketing programme did not just deliver smart ticketing across the south-east, which many passengers are now using, but put in place the architecture and computer systems that will enable smart ticketing on national rail to be a success.
Well, it was a pretty damning report from the National Audit Office. Yet again we have a Government unable to deliver on the railways and on something as simple as smart ticketing. Labour will be at the cutting edge of rail tech, while this Government still expect people to book separate tickets from separate operators—one national chaos under the Tories, one national public service with Labour. How much longer will the Government champion fragmented ticketing on a fragmented railway?
I always get rather frustrated when people have had an answer but paid no attention to what I said—but there we go. The report from the National Audit Office was important. It contained a number of lessons, which we took on board when setting out the national smart ticketing programme. Technology is changing rapidly. We have to make sure that the schemes we put in place now meet what technology can do in a year’s time, or two or three years’ time. We will be moving fast with tickets, and tickets will be unbelievably advanced by the time the Labour party ever gets back into power.
(7 years, 2 months ago)
Westminster HallWestminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.
Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
It is a pleasure to serve under your chairmanship, Mr McCabe. I shall do my best to cram as much as I can into the remaining 10 minutes. The hour-long debates in this place are neither fish nor fowl, I have rapidly learned.
I thank my hon. Friend the Member for Eddisbury (Antoinette Sandbach) for doughtily providing her usual list of issues for me to consider. She is a firm champion of the people of Eddisbury, and I shall try to focus on her main concerns, but I want briefly to address some of the points made by the hon. Member for York Central (Rachael Maskell) from the Labour Front Bench. I agreed with much of what she said about economic investment and the need to ensure that things all join up. However, I must gently chide her on one key point: we have not stopped work on east-west links across the north. I met only the other week with both Network Rail and Transport for the North to talk about how they are bringing forward Northern Powerhouse Rail. I have always argued that HS2’s full potential will not be fully delivered unless we properly improve east-west links as well. It is not for me to determine the engineering solution that Network Rail will alight on for any particular line or stretch of line, but that work is ongoing—on a cross-party basis, as Transport for the North is also governed by Labour local government leaders across the north, who are also setting the objectives. That seems to me to be how things should be taken forward.
If the hon. Lady will forgive me, I will not; I am sure it will not be the last time we have the discussion, and I must give some time to the concerns of my hon. Friend the Member for Eddisbury. Her main concerns focused largely on some of the ground instability problems that we encounter in Cheshire, crossing the salt fields. As someone born and bred in Northwich I have been brought up on photos of houses that have collapsed because of subsidence, and have suddenly disappeared into the Bull Ring in the town centre. I am more than aware of those issues; but I reassure hon. Members that we are seeking to manage them actively.
HS2 has commissioned a specialist mining engineer, in consultation with the Cheshire Brine Subsidence Compensation Board, to undertake a study on the consultation route using available data such as those from the British Geological Survey, the salt industry and local authorities. Those light detection and ranging surveys have been completed by HS2 Ltd, identifying the wet rockhead features to which my hon. Friend referred near to the route, and will be considered with other LIDAR surveys. I think it is fair to say that between Crewe and Manchester every route option presents risks and issues. It is a matter of balancing those carefully and working out which offers the optimum solution. We carefully weighed those matters both in 2013, when we listened to concerns, and on the now-confirmed 2016 route. On our assessment those risks were more manageable on the latest version of the route. One of the key reasons for that was to avoid the gas storage caverns to which my hon. Friend referred. The route has been moved to better avoid salt brining and gas storage infrastructure, reducing underlying mining and geological risks during construction and operation. The route has also been raised to better allow for drainage and options for ground stabilisation. In terms of travel through Cheshire, other alternatives were looked at, including tunnelling options, but this was felt to be the best option of those on the table.
My hon. Friend the Member for Eddisbury referred to the report by TerraConsult. Its first report was taken into account before the November 2016 announcement, as was its second report before the July 2017 announcement. I further understand that HS2 Ltd is meeting on Tuesday 12 September with TerraConsult and Mid Cheshire Against HS2 on how HS2 Ltd came to make its recommendation on the alignment between Middlewich and Pickmere. Senior engineers with a background in geotechnical engineering will attend that meeting. I also understand that HS2, accompanied by engineers, is more than happy to meet my hon. Friend to discuss her concerns and is waiting to confirm a date with her office. Once she has had that meeting, I will still be more than happy to put myself—with my limited expertise—at her disposal also.
I recognise that this is a sensitive and complex section of the route. There is more work to be done to further assess geological risks and to provide suitable mitigations for them. HS2 Ltd plans to carry out early geotechnical investigation work in the mid-Cheshire area to gather more advanced survey information. We will continue to work with my hon. Friend to try to ensure that the best mitigation possible occurs.
I also want to touch briefly on my hon. Friend’s concerns about the siting of the depot at Wimboldsley and its proximity to the primary school. The re-siting of the rolling stock depot to Wimboldsley has taken into account both the potential risks of the previous site in Golborne, which saw the demolition of a grade I listed property, and the potential impacts in Wimboldsley. The site is strategically located on the HS2 network, south of the Manchester junction, so that it can receive empty trains from both the HS2 main line—from Preston and indeed further north—and the HS2 Manchester spur. It is also located at the point where the line deviates from the existing west coast main line, so it is also well placed to receive empty HS2 trains from Liverpool. Other locations around Basford and Crewe are less proximate to where empty trains from Liverpool and Manchester might be coming from.
While I understand that there will be impacts associated with the rolling stock depot, I very much welcome the fact that HS2 Ltd is in conversation with the headteacher at Wimboldsley Primary, and I hope that any outstanding concerns get fed into me as well, so that I am aware of them.
In particular, this proposal avoids direct impacts on the grade II listed buildings to which my hon. Friend refers and also proximity to sites of special scientific interest. I recognise that there are still concerns about the Leeds and Liverpool canal. Indeed, other canals were also mentioned. As someone born in mid-Cheshire, I have a great fondness for canals and want to ensure they do not suffer in this process.
(7 years, 7 months ago)
Commons ChamberNetwork Rail is responsible for delivering a safe, reliable and efficient railway, and is regulated by the Office of Rail and Road. Over the longer term the company has reduced the cost of the railway significantly, and asset reliability has improved. The trend in spending on maintenance at present is broadly stable, but it is vital that the company continues to drive efficiency to ensure a good service to passengers while reducing the burden on passengers and taxpayers.
I thank the Minister for his answer, but the overhead line equipment on the east coast main line route is in urgent need of renewal, having been installed in the 1970s and ’80s. We already know that there is six-times higher spend in the south than in the north on rail and transport infrastructure, but we also seem to have an east-west divide in rail: the east coast route has received £3 billion less than that of the west. Will the Government bring forward their funding to upgrade the east coast main line infrastructure, since the passenger performance measure is now at 25.1% because of overhead line failure? In layman’s terms, my constituents’ journeys are being delayed and seriously diverted.
I predicted that the hon. Lady would raise the issue of overhead line equipment. I have already met the route managing director Rob McIntosh to discuss that specific issue. He said to me that he is looking carefully at how to best improve reliability of the overhead lines, particularly during periods of high winds and heavy storms, which often cause a problem. They are looking at sites with significant gradient and reviewing vegetation management near overhead lines, track geometry and the reliability of system tension during periods of high winds.