Silsden and Steeton Bridge Debate
Full Debate: Read Full DebateMark Pritchard
Main Page: Mark Pritchard (Conservative - The Wrekin)Department Debates - View all Mark Pritchard's debates with the Department for Transport
(1 year, 10 months ago)
Westminster HallWestminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.
Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
I call Robbie Moore to move the motion, and then I will call the Minister to respond. As hon. Members know, there is no opportunity for the mover of the motion to wind up in a 30-minute debate.
I beg to move,
That this House has considered construction of a Silsden and Steeton bridge.
It is a pleasure to serve under your chairmanship, Mr Pritchard. I am delighted to have secured my own personal time in the House of Commons to raise an important local issue: my campaign to get the Silsden to Steeton pedestrian bridge built over the busy A629 dual carriageway.
Before I get into the detail, it is important to outline why this campaign is so important. Silsden is a town with a population of around 8,000, including myself; perhaps I should declare that as an interest, because I would like to benefit from this bridge. Silsden is connected to Steeton—a slightly smaller settlement—by the A6034, otherwise known as Keighley Road, which then goes on to become Station Road. It is a distance of less than 1,000 metres.
Steeton has a busy and well-utilised railway station, with direct links to Skipton, Bradford and Leeds. Many of my constituents living in Silsden benefit from that station, but getting there is a treacherous journey on foot. What separates the two settlements is a very busy dual carriageway. The A629 is a busy trunk road going east to west between Skipton and Keighley, and beyond. It takes a huge amount of heavy traffic every day and into the night.
On the junction between the busy dual carriageway and the two roads connecting Silsden and Steeton is a two-lane roundabout. There is no ideal crossing point for a pedestrian to get across the roundabout and the busy dual carriageway from Silsden to Steeton. For a resident living in Silsden with children, or a young person who is wanting to walk from Silsden to Steeton, the connection to get to the roundabout is not easy in itself. The pavements are very narrow on either side of the road.
If a person is walking from Silsden in the direction of Steeton, once they get to the bridge that goes over the Aire river, the pavement disappears on one side and they have to cross over to the other side. They then have to make their way up to the busy roundabout and take their life into their hands to cross it before making their way on to Steeton. That is just not good enough. We must get a pedestrian bridge built as a matter of urgency, because many people use the crossing.
What action has been taken to date? Kris Hopkins, who was the previous Conservative MP for Keighley, first lobbied on the issue. He got a petition going that was signed by many residents living in Silsden and Steeton who had to use the crossing on a day-to-day basis. As the MP for Keighley, and Ilkley at the time, he was successful in securing £700,000 from our Conversative Government for a feasibility study, which was awarded to the West Yorkshire Combined Authority. In turn, it instructed Bradford Council to undertake a feasibility study and build a business case so more funds could be drawn down to get the pedestrian bridge built.
That money was awarded way back in late 2016, and it took until 2020 for the Labour-run Bradford Council and the Labour-run West Yorkshire Combined Authority to even get the feasibility study done. Almost four years! What on earth were they doing in that period to build a business case? It was only after I lobbied, after getting elected in 2019, that Bradford Council and West Yorkshire Combined Authority produced this feasibility study, and—surprise, surprise—what do we think it said? We need a bridge to cross this busy dual carriageway. Unbelievable! They spent £700,000 on determining that, but we could all have said that it needed to be done.
The feasibility study said that it was going to cost £3.6 million to construct the bridge—a hefty sum. Of course, detail is important, and I appreciate that it can take some time to build up the feasibility and business cases to draw down funds. But, looking at the figures, it would seem that West Yorkshire Combined Authority, a Labour-run administration controlled by a Labour Mayor, and the Labour administration at Bradford Council could not even get their figures right. In 2020, they told us, and my constituents, that it was going to cost £3.6 million to build the bridge. In June 2021, they then told us it was going to cost £5.5 million, and then—surprise, surprise—we get to August 2022 and the figure has gone up dramatically to £10.3 million.
All we want is a pedestrian bridge across a dual carriageway, and they are now telling us that it is going to cost £10.3 million. That is an increase of £6.7 million since the first figure of £3.6 million from the feasibility study that took them almost four years to do. What on earth have they been doing during the last four years, and what on earth was the previous Labour MP doing to get any traction on this project? Nothing!
I can only assume that those figures have been exaggerated to try to kick the project into the long grass because they are not interested in building the bridge. Well, let me tell you, Mr Pritchard: I absolutely am. Since I have been elected as the Conservative MP, we have been successful in securing the funds to deliver this project. Those funds have been awarded by this Conservative Government to West Yorkshire Combined Authority via an £830 million fund that is ringfenced for transport and infrastructure-related projects.
The money is there; we have secured that, and now it moves on to deliverability. Back in 2022, when the announcement was made that we had been successful and secured the money, what did Labour-run Bradford Council and Labour-run West Yorkshire Combined Authority tell us? “Oh well, it is going to take until 2026 for this bridge to be built.” I cannot get my head around how much time it takes to get a project off the ground. All we want is a safe crossing so that my constituents can get from Silsden to Steeton without having to take their lives into their hands by crossing a busy dual carriageway.
The incompetence at the council is unbelievable. Look at how long it takes to get major infrastructure projects off the ground. The Queensferry crossing, connecting Edinburgh to Fife, took six years to build, yet the council are saying that a pedestrian bridge is going to take another four years to get off the ground. That is simply not good enough. The feedback that I am getting is that the ground conditions are complex—well, let’s get it sorted out and do our research so that we can get the bridge built. I know that planning issues can be complex. Compulsory purchase powers may need to be implemented because I assume that land take will be required, as the council will not own all of the land. Let us get this project going.
I will continue to bang the drum for driving economic growth and ensuring that we have a safe crossing for my constituents, but we must get the council and West Yorkshire Combined Authority moving because I am getting impatient and I will not stop banging the drum on this issue for my constituents. All we want is a safe pedestrian crossing over a busy dual carriageway. I want to crack on and get it built now, so that a parent living in Silsden does not have to drive their child almost 1 km to drop them off at the station in Steeton or take their life into their hands when crossing the dual carriageway. I am getting fed up with the sluggish approach of our council and of West Yorkshire Combined Authority. As I say, let us get this bridge built.
Will the Minister use all his efforts to put pressure on the Labour West Yorkshire Mayor, who is dragging her feet on this issue, and on Labour-run Bradford Council, to get this project delivered with urgency? Will he write to those two organisations to put pressure on them to get the bridge built? Will he come to see me and meet some of my residents in Silsden and Steeton, so that we can get this project off the ground? All we want to do is get the bridge built.