Coastal Erosion

Lord Swire Excerpts
Tuesday 12th June 2018

(6 years ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Lord Swire Portrait Sir Hugo Swire (East Devon) (Con)
- Hansard - -

In following the hon. Lady’s speech just now, I am not certain as to which is eroding more quickly: the coastline of Scotland or support for the increasingly incompetent SNP Administration in Edinburgh.

I want to confine my remarks to a particular part of my constituency, one of the jewels in the crown of East Devon: Sidmouth, a regency seaside town well known to my hon. Friend the Minister. Sidmouth is at the gateway to the Jurassic coast world heritage site, and a large part of the town is in a conservation area. For years now, I have been working with various bodies and individuals in the town—not least the local councillors, Councillor Stuart Hughes and now Councillor Tom Wright—to try to resolve what has become an increasingly difficult problem, particularly for the residents of Cliff Road, overlooking Pennington Point, which has seen erosion year on year. Indeed, earlier in 2018 it was widely reported in the national press that Cliff Road was one of the most endangered roads in the UK, owing to coastal erosion.

We are very dependent on the south-west coastal path in Sidmouth. We have replaced the Alma bridge, but the various different schemes have gone on for too long. Over the years I have had Sir James Bevan, the chief executive of the Environment Agency, down to see the erosion. Andrew Sells, who is in charge of Natural England, has been down. I even had my right hon. Friend the Member for North Shropshire (Mr Paterson), who was then the Secretary of State for Environment, Food and Rural Affairs, come and look at it.

There are two issues at stake. One is the complexity of trying to get a satisfactory solution. It is a complicated engineering issue. Many different bodies are involved in the steering group: East Devon District Council, Sidmouth Town Council, local fishermen, the Environment Agency, Devon County Council, the National Trust and the Cliff Road Action Group. All of those groups have a rightful interest, but that has delayed the implementation of a scheme that can arrest the erosion that we see year on year.

The new scheme, the preferred scheme, for the Sidmouth beach management plan would see a new groyne wall installed on East Beach and a plan to raise the splash wall along the promenade. I am extremely nervous about the prospect of raising the wall along the promenade because we have seen what happened in the neighbouring constituency of Tiverton and Honiton: one can drive down the esplanade in Seaton and not actually see the sea. We would not want that replicated in Sidmouth. This part of the £9 million project would last around 100 years.

We now have a funding issue. East Devon District Council needs to raise £3.3 million, with the rest hopefully being secured from the Environment Agency. Work would begin in 2019 and be completed in 2020. When we look at the areas we can raise the money from, we see that we are left with either a local levy, the district council, Sidmouth Town Council, South West Water, local charities, visitors, East Devon housing, and residents. I humbly submit to the Minister that it is not satisfactory to try to leave a small local authority with a funding gap that will prevent the scheme from being realised.

Lord Bellingham Portrait Sir Henry Bellingham
- Hansard - - - Excerpts

My hon. Friend is being incredibly generous in giving way. My local authority has similar problems, but it faces a structural funding deficit. The Minister’s Department and the Ministry of Housing, Communities and Local Government must consider making some form of ring-fenced precept available to local councils, and perhaps there should be more contributions from town and parish councils inland.

Lord Swire Portrait Sir Hugo Swire
- Hansard - -

I agree with my hon. Friend that it is almost impossible to ask local authorities for large amounts of money to fill the gap because they all operate under very strict financial constraints now. Such schemes should not be held back by relying on the local authority to make up the difference, so I ask the Minister whether Bellwin can be extended. Can my residents of Cliff Road, who have found it impossible to get mortgages and increasingly difficult to get insurance as they see their gardens disappear, get a compensation package?

I hope that the whole area can be dealt with quickly. We need a masterplan for the whole Port Royal area along the esplanade, but there is no point in doing that until we have secured the Pennington Point and rock revetment scheme, because that would threaten the sewage works in the area, which could in due course flood the entire town.

I do not want to delay the debate unduly. The Minister is welcome to come to Sidmouth at any time to see the situation for himself. We are almost there now. This has gone on for so long. The scheme must be implemented. We cannot wait any longer. We have got people onside. We have got everything lined up now. I pay tribute to all those who have got this far, but we have a funding deficit and I ask the Minister to be creative in looking at the compensation issue for the residents of Cliff Road and also in helping with the funding that we need to get the scheme under way.

None Portrait Several hon. Members rose—
- Hansard -

--- Later in debate ---
George Eustice Portrait The Minister for Agriculture, Fisheries and Food (George Eustice)
- Hansard - - - Excerpts

It is a pleasure to serve under your chairmanship, Sir David. Like a number of other hon. Members, I congratulate my hon. Friend the Member for Angus (Kirstene Hair) on securing the debate. She articulated the problems facing her constituents in Montrose with passion, and was characteristically robust in the points she made. I am conscious that this issue affects many parts of the country, including my own, as my hon. Friends from various Cornish constituencies pointed out. It is good that so many Members turned up at 9.30 am to raise this important issue in the first debate of the morning when we might face a lateish night in this place.

As the shadow Minister pointed out, the Under-Secretary of State for Environment, Food and Rural Affairs, my hon. Friend the Member for Suffolk Coastal (Dr Coffey), would normally lead on this part of the portfolio. I am covering this debate because, as a number of hon. Members know, she is recuperating from a recent illness. However, she will be following the debate closely, as coastal erosion is an ongoing challenge for her constituency of Suffolk Coastal. I very much look forward to receiving a text from her later this morning, as often happens after such debates, giving me an update on how I did.

As everybody is aware, responsibility for the management of coastal erosion is devolved to the Governments of the four nations of the UK. I will return later to some of what they are doing.

Coastal erosion is a natural process that always has and always will change the shape of our coastline, but change can be distressing for those living nearby. In March this year, we all saw the dramatic pictures from Hemsby when the “beast from the east” struck the coast of Norfolk. That county has a dynamic coastline, which has been retreating progressively over past centuries, but on that occasion the concentrated power of wind and sea eroded nearly 5 metres of shore along a 700-metre frontage, leaving 13 homes balanced precariously above the sea. Proactive management by the Environment Agency and the local council led to residents being evacuated by Great Yarmouth Borough Council. After the storm, 11 properties were demolished and, of the remainder, one property was saved by the owner rolling it back, and another needed only part of it to be demolished as it too was rolled back.

The key difference between fluvial flooding and coastal erosion is that, while still distressing, the impact of fluvial—river—and surface flooding tends to be temporary, while the impact of coastal flooding is terminal and carries much greater risk to human life. Of the £2.5 billion to be invested in flood defences between 2015 and 2021, nearly £1 billion is dedicated to coastal areas, reflecting how seriously we take that challenge.

Given my constituency, I understand people’s concerns. Cornwall has the longest coastline in England, at more than 1,000 kilometres, and the occurrence of coastal flooding is likely to increase threefold over the next 100 years. My constituency has both a north-facing and a south-facing coastline, and some of the exposed cliffs along the north coast have historical rates of coastal erosion of up to 40 metres in the past 100 years. They are likely to experience at least a further 40 metres of erosion in the next 100 years.

Sustainable coastal management needs to embrace change. I recognise that this debate was called on the back of a particular Scottish concern, in the constituency of my hon. Friend the Member for Angus, but this is a UK-wide matter and I feel that I should consider how we approach things in each nation, starting of course with England, where the Government set the overall policy and local councils lead on management of coastal erosion risk in their areas.

Earlier this decade, a significant decision was taken by the Government to recognise formally that we would not defend every part of our coastline from erosion. We devolved decision making to a local level, confirming what had already been happening in practice. That made the process for councils designing a shoreline management plan more meaningful. Such plans set out at a high level the policy framework to manage the risk of change.

Covering three time horizons—20, 50 and 100 years—the plans recommend four approaches to management: first, advancing the line, or moving defences out beyond the coast, which is used in some circumstances; secondly, holding the line, which means using either soft or hard defences to reduce or eliminate erosion; thirdly, managed realignment, where we accept the inevitable but manage the process, taking account of local geology and wildlife; and, finally, an approach of no active intervention, which allows nature to take its course.

Much of the debate has focused on whether the devolved Administrations are doing enough to support their councils. I shall say a little about what we do in England. To support our councils, the Environment Agency provides a national picture of what is happening on the coast. It has established national coastal erosion risk maps that provide a consistent assessment of coastal erosion risk around the country and set out a best-practice method for calculating that risk. The agency is also supporting a national refresh of shoreline management plans to ensure that they remain based on accurate information. There is also investment, which, inevitably, was a big feature of this debate.

We put significant investment into coastal erosion prevention. In England, between 2015 and 2021, our plans will see £885 million invested in projects to manage coastal erosion and better to protect communities against flooding from the sea. At the same time as the Government made the decision specifically not to defend the entire coastline, they also made the important decision that any scheme with a positive benefit-cost ratio could still receive some Government funding to support partnership funding locally. We also established corporation tax relief for businesses to contribute to such projects.

Our partnership approach means that schemes that would not have progressed in the past can go ahead if local funding can be found through the partnership model. Our £2.6 billion capital investment programme is expected to attract more than £600 million in partnership funding contributions on top of that.

In Norfolk, an innovative public-private project will provide protection for nationally important gas infra- structure and enhance protection for local communities.

Lord Swire Portrait Sir Hugo Swire
- Hansard - -

I hear what the Minister says about local businesses helping, but in a town such as Sidmouth, where the average local business is a small retailer already suffering under business rates and with lack of footfall on the high street, is it realistic to expect such smaller companies to contribute?

George Eustice Portrait George Eustice
- Hansard - - - Excerpts

There will always be challenges in raising funding, but we are committed to the partnership model and projects that would not have been able to take place before we introduced those measures can now do so. I visited Sidmouth last year, so I am familiar with what my right hon. Friend highlights—his constituency has a beautiful, albeit quite hilly, footpath along the coastal road—but I am happy to visit his constituency again to look at those issues at first hand.

To complete my point about the innovative approach in Norfolk, we are seeing a technique called sandscaping, whereby 1.8 million tonnes of sand and gravel are deposited near the shore. That provides direct protection from storms and acts as a source for material to nourish beaches.

My hon. Friend the Member for Angus highlighted a comparison between the approaches to funding taken in Scotland and in England. The difference is that every year, despite budgetary pressures, we have increased funding on flooding, which is up from £399 million in 2010-11 to £502 million now. We have ring-fenced money specifically for coastal erosion, as she acknowledged.

This issue is devolved, so it is for each part of the UK to decide how to operate such matters, but it is complex and difficult, as hon. Members have pointed out, and we can all learn from each other, from the success or failure of the different approaches that we take. I am sure that the point she has made today will be heard by those in her constituency and, indeed, by the Scottish Government.

In those areas where defence from coastal erosion is neither practical nor economic, it is important that affected communities are supported and helped to adapt. That means anticipating the changes. Local authorities need sustainable approaches that reduce future burdens on communities, encourage a more positive approach and promote economic growth in a viable manner.

Finally, I want to touch briefly on the approach taken by the devolved Administrations. My hon. Friend raised the specific issue of Montrose, where up to 80 metres of coast could wear away in the next 50 years. In Scotland, the Scottish Government have concluded a piece of evidence called “Dynamic Coast: Scotland’s Coastal Change Assessment”, which was launched in August 2017 and identified some of the challenges ahead. I understand that Scotland has allocated a budget of £42 million a year to help local authorities with flooding and coastal erosion. In Northern Ireland, a gap has been recognised. The approach taken has been on the principles of the Bateman report, but, in the last Assembly, Ministers recognised the need for a more strategic approach to coastal management. They committed to work together on a baseline study, which is now under way. Last but by no means least, in Wales, I am aware that the Welsh Government have also made significant investments to improve coastal defence infrastructure over the past few years through new schemes.

To conclude, we have had a comprehensive debate covering many different issues and areas, with hon. Members raising issues relating to particular constituencies. It has been a pleasure to respond to the debate.