HS2: Economic and Environmental Impact Debate

Full Debate: Read Full Debate
Department: Department for Transport

HS2: Economic and Environmental Impact

Lord Freeman Excerpts
Thursday 16th November 2017

(7 years, 1 month ago)

Grand Committee
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Lord Freeman Portrait Lord Freeman (Con)
- Hansard - -

My Lords, I congratulate my noble friend Lord Framlingham on raising this issue. I do not agree with him, but it is important that your Lordships not only debate it again today but on an annual basis—I do not know what the necessary procedure would be—to consider the progress made on the project in terms of controlling costs and analysing the benefits to come, which I will briefly touch on.

The arguments for the project are economic. I will not touch on the environmental issues that my noble friend has raised, because last year’s Select Committee—on which a number of colleagues here participated directly or indirectly—undertook the long process of considering more than 1,000 petitions. I believe, however, that it is important to concentrate on the issue of cost and that there should be a mechanism—which if necessary I will institute—that enables this House to look at the progress of the project and the control of its costs.

This is a long-term project, and it is very difficult to measure and estimate the total costs over a great number of years. As the Rail Minister responsible for HS1, I know that there was considerable concern at the outset about the project cost and about the impact on households affected on the route from central London to the tunnel. But that process worked extremely well. It is a long-term project that has proved outstandingly successful, and it makes one of the key points that I wish to make. The regeneration around that railway line, particularly just outside London, across the river but also right down to the Channel Tunnel, is beyond all estimates that were made about the benefits of HS1. We need to bear in mind—and I shall come on to the benefits to the north of England in this regard—that it is very difficult to make an estimate of what those benefits are, but they have certainly outstripped the early estimates that were made by the Department for Transport.

I have read the report from KPMG, which estimates £15 billion of productivity gains over 20 years. That is to some extent a heroic estimate; it is very difficult for even a distinguished firm like KPMG to make the kinds of estimates that have been bandied around. But for London to Birmingham, there is an overwhelming case for the high-speed line. Not only is the west coast main line pretty much at capacity but, looking forward even 10 years, let alone 50 years, we will need greater capacity, which means faster trains to connect London with the major city of Birmingham. Beyond Birmingham, in the second phase, the same applies. A number of local authorities, particularly in Manchester, Crewe, Wigan, Sheffield and Leeds—as well as with the trans-Pennine connection, HS3—have expressed their views about the future of this project, and they have all been positive, because it will bring a greater and faster connectivity between those great conurbations and the capital. That is an extremely important point. It is very difficult to forecast the actual environmental and economic consequences, but the initial reactions, particularly from Manchester, which I warmly welcome, should be taken into account.

I shall mention one aspect of the proposal that may not have been fully understood. The initial construction of the line is planned to call at Old Oak Common. That is quite important because of its connectivity to Heathrow. I am told and believe that trains will stop for only two minutes for those who wish to get out there before proceeding into Euston. That seems to me to be a real benefit.

Finally, HS1 has turned out to be a tremendous success, and the capacity provided seems to be improving and increasing all the time. It has done a great deal for tourism and business, and I believe that this new project, HS2, and, ultimately, HS3 across the Pennines, will make a tremendous contribution to the productivity and prosperity of this country.