Draft Contracts for Difference (Miscellaneous Amendments) Regulations 2022 Debate
Full Debate: Read Full DebateLee Rowley
Main Page: Lee Rowley (Conservative - North East Derbyshire)Department Debates - View all Lee Rowley's debates with the Department for Business, Energy and Industrial Strategy
(2 years, 6 months ago)
General CommitteesI beg to move,
That the Committee has considered the draft Contracts for Difference (Miscellaneous Amendments) Regulations 2022.
I am grateful for the opportunity to contribute today. In the sixth carbon budget, the Climate Change Committee emphasised the crucial role that carbon capture and storage will play in reducing emissions from industrial processes, combustion, electricity generation and hydrogen production. The energy White Paper 2020 set out the Government’s view on how to achieve a low-cost, low-carbon electricity system. Although we cannot predict exactly what the generating mix will look like in 2035, we have made a commitment to decarbonise the UK’s electricity system by then, subject to security of supply, and we are confident that renewables will play a key role. However, in order to decarbonise while maintaining security of supply and ensuring that costs are kept low, we will need to balance renewable variability against continuing demand. To do that, we will need system flexibility, energy storage and non-weather-dependent, low-carbon power generation.
On the Minister’s comment about being unable to predict the energy generation mix in 2035, can he at least predict what the mix will look like in 2030? Clearly, the Government have set their own targets—for example, on what offshore wind will look like in 2030. We have a so-called energy security strategy, which I would have thought is key to the Government being able to predict what the mix will look like and then plan accordingly to facilitate that.
I am grateful for the hon. Gentleman’s intervention. The point of what I am trying to articulate is that this is a journey that will potentially vary over the course of a number of months and years. We will not know whether it is 1%, 5% or 10%, but the journey of the overall mix is towards a renewable and clean energy future, and we are absolutely committed to getting there. We consider that thermal power with carbon capture and storage is one technology that will provide this at scale and help in the journey that the hon. Gentleman outlines.
In the subsequent net zero strategy, the Government committed to use consumer subsidies to support the construction of at least one power CCS plant, which is to be operational by the mid-2020s. In the round, these strategies illustrate the critical importance of carbon capture and storage technologies, and we have developed specific business models to bring forward carbon capture, utilisation and storage projects. Existing schemes are not considered fit for purpose, because such projects require specific support, given the need for co-ordination across the sector, with supporting infrastructure yet to be built. To enable this, we have developed the dispatchable power agreement. This is a carbon capture storage subsidy for gas-fired projects connected to a full carbon capture and storage system, and it is intended to provide low-carbon, flexible power generation.
The dispatchable power agreement contract is a bespoke contract based on the standard terms of the contracts for difference used previously in allocation rounds, but with specific amendments to ensure suitability for power carbon capture and storage. The dispatchable power agreement will be a key tool used to ensure low-carbon electricity generation by bringing forward investment in power carbon capture storage plants, and to incentivise such facilities to operate in a manner that benefits the UK energy market. The DPA incentivises investment in order to bring forward projects that are ready to build low-carbon generation capacity. The availability payment incentivises power CCUS projects to maintain a high level of capture rate throughout the life of a contract. It is commonly referred to in the business model and is intended to implement our commitment.
The draft regulations were laid before the House on 31 March 2022. The amendments in the instrument laid before the House today are therefore needed to ensure that existing regulations under the Energy Act 2013 can be used to award DPAs. Those regulations are used to award contracts for difference currently: the proposed amendments are not intended to impact the standard CFDs for the current allocation round or future allocation processes of the standard contract for difference.
This statutory instrument introduces three changes to the existing regulations: the Contracts For Difference (Allocation) Regulations 2014—the allocation regulations —and the Contracts for Difference (Definition of Eligible Generator) Regulations 2014—the eligible generator regulations. The statutory instrument amends the eligible generator regulations specifically with regard to the definition of an eligible generator. Currently, new-build generating stations connected to a complete carbon capture storage system are eligible generators. The change we propose allows a retrofitted carbon capture storage project to constitute an eligible generator. It does that by widening the criteria for carrying out a generating activity to include altering an existing generating station into a generating station connected to a carbon capture storage system. By making that change, retrofitted power carbon capture storage plants can be eligible for the dispatchable power agreements.
The statutory instrument also amends the allocation regulations. Currently, the allocation regulations include a specific reference to the contracts granted pursuant to section 10 of the Energy Act 2013. The regulations refer to such contracts and the language suggests that they will include a strike price and a reference price within their payment mechanism. The amendment retains the reference to a strike price and a reference price, but also amends the language to state that such prices may be included, although an alternative payment mechanism that does not use those terms could be used in future. That ensures that contracts that do not specify a strike price and a reference price can be contemplated. It means that there will not be a requirement for those specific terms to be used in dispatchable power agreements, which will allow for the alternative mechanisms that I have suggested.
Finally, the statutory instrument amends the eligible generator regulations. Currently, an eligible generator is defined as connected to a complete CCS system, and a complete CCS system is defined as a system of plant and facilities for capturing some or all the carbon dioxide, or any substance consisting primarily of carbon dioxide, produced by or in connection with the generation of electricity by a generating station, and transporting the carbon dioxide or the substance captured and disposing of it by way of permanent storage. The proposed amendment was to add the words into limb (b) after transporting—
“including by way of non-pipeline transport methods”—
to make it clear that transport can contemplate alternative transport methods. The existing language does not necessarily limit the potential methods by which transport can be done, but it makes it unambiguous that this definition is not intended to be limited to pipeline methods. That is consistent with the consultation respondent who noted that it would be helpful that transport could be carried out by way of non-pipeline methods.
The proposed amendments in this statutory instrument are intended to facilitate non-pipeline transport generally. The proposed changes to the eligible generator regulations aim to be neutral regarding what those possible configurations could be.
To confirm that this statutory instrument is the most appropriate way to approach this area, in accordance with the Energy Act 2013, a consultation was carried out last year between July and September, and a response was given two months ago on gov.uk. We received 16 responses to the consultation; some directly involved in power CCS, some trade associations, some non-governmental organisations and other interested parties. The responses were largely positive and in favour of the proposed changes. Respondents requested some clarification, which have been provided in the official published Government response.
Will the Minister explain why no impact assessment was done for the draft regulations? We are talking about consumer subsidies, so we should have an impact assessment of what it could mean for people’s energy bills.
I will be happy to answer the important point the hon. Gentleman raises when I conclude, along with any other comments made.
Let me conclude in order to give Members the opportunity to comment. The draft regulations facilitate the Government’s CCUS programme generally, but the decision to award support is separate. Decisions about the specific support that will come through those remain subject to the outcome of a separate process and value for money and affordability considerations. The measures introduced by the SI are aligned with the Government’s carbon budget and net zero targets, as they help to enable power carbon capture and storage projects. I commend the draft regulations to the Committee.
I thank everyone for their contributions. I welcome the welcome: as a Committee, I think we are broadly in assent with the substantive points in the regulations. Alongside that, there were a substantial number of questions, some about the specifics of the statutory instrument, which I shall address as best as I can, and some about energy policy more broadly.
While I accept hon. Members’ challenge to contextualise what we are talking about today, I hope that they will forgive me if I do not seek to delay the Committee too long by debating aspects of broader energy policy, such as the validity and value of nuclear, the potential alternative approaches with hydro, grid upgrades and the like, simply because they are broader than this relatively narrow SI and there are opportunities elsewhere in this place to debate them.
I completely understand and acknowledge the points made by the hon. Member for Kilmarnock and Loudoun, but “dribs and drabs” is perhaps a little unfair. We are trying, in a careful, cautious and incremental way, to address the specific issues that we need to address to ensure that our statute book works for some of the changes that we are making, with a very ambitious and broad-based approach to transforming and decarbonising the energy system over the long term.
The hon. Gentleman asked about the impact assessment. There is no requirement at this stage to undertake an impact assessment, although he can see from the process that we have undertaken, particularly around the consultation, that a significant amount of work was done to understand people’s views. When we have changed the law and we are seeking to put things through the process we are changing today, appropriate consideration can be given to various mechanisms. We have been clear that there will be changes, and I referred to some of them in my opening speech.
The hon. Member for Southampton, Test asked a number of detailed questions about biomass. My understanding is that BECCS could be eligible, provided that it is connected to the complete CCS systems that I talked about in my opening speech and that are mentioned in the broader contextual documentation that is available. However, on the broader questions about biomass, I again defer to the strategy, which will be published in due course.
Paragraph 7.13 of the explanatory memorandum states clearly:
“It is not directly linked to the actual amount of electricity it produces but rewards the plant for being available when needed and capturing the level of CO2 as required.”
That is still talking about dispatchable energy, whereas biomass would be a constant output. I do not see how that would allow BECCS to be included in the scheme, so I am looking for further clarity.
I am grateful for the hon. Gentleman’s question. My understanding is that we are allowing BECCS to be eligible in general, but the specifics and the detail—recognising that there are two different elements of both generation and capture through the energy value chain and how they interact—will need to be dealt with on a case-by-case basis and looked at in the round when we launch a process to move on as part of this process of changing the statute book.
My hon. Friend the Member for Windsor asked about the reference price and the strike price. I do not think there is anything more apparent here than simply adding an additional layer of flexibility. We are not saying that we are definitely doing something else, or that we definitely want to move away from reference prices and strike prices; to the point raised by the hon. Member for Kilmarnock and Loudoun, this is just about ensuring that we do not have to come back again if we determine in the future that a different model is appropriate—one that does not mention reference prices and strike prices but potentially mentions some other element.
I wonder how that ties in with what is in the carbon capture and storage business plan about the articulation of strike price and reference price-type arrangements in capex and opex as the system progresses. That suggests that the system is more of an RAB system than a CfD system. In the Minister’s mind, how do the two interact?
I am grateful for the hon. Gentleman’s question. The narrow assessment that we are doing today is to try to ensure that the statute book is as flexible as it can be in the event that alternative models emerge. The technicalities of those alternative models would need to be debated and discussed with experts. For the moment, we are trying to ensure that the legislative framework allows for that variation, should it be necessary. Whether it will ultimately be necessary is a broader question, which will be addressed in due course.
The hon. Member for Kilmarnock and Loudoun raised some important questions about timelines for power plants, the number of power plants and where they will be located. I am sure he expects me to say this, but I am not in a position to outline the precise process by which the system will be operationalised, I am not in a position to confirm whether it is one or n, and I am certainly not in a position to confirm where those locations—singular or plural—will be. This is about getting the legislative and statutory framework ready to be able to make those decisions, which will be made in due course through the appropriate processes.
I make a similar point about bespoke versus auction processes, and about some of the technical questions that the hon. Gentleman asked about comparisons between new and older. He also asked about the broad true cost of transportation, whether it is pipeline or non-pipeline. He makes an important point, and that will all need to be considered in the round when we come to operationalise the changes in due course.
I hope that I have addressed many of the key questions relating to the SI. There is obviously a broader debate about energy policy and some of its elements, but I hope that the Committee is minded to support these technical changes to the rules and regulations that govern these areas, so that we have the flexibility to ensure that we can develop this technology and operationalise it successfully. I commend the regulations to the Committee.
Question put and agreed to.
Resolved,
That the Committee has considered the draft Contracts for Difference (Miscellaneous Amendments) Regulations 2022.