I thank the right hon. Lady for her passionate and well-argued intervention. She is absolutely right that the western rail access to Heathrow makes eminent sense for south Wales, my region and the Slough area. It will support not only the economies of our areas but the national economy, by making it easier to expand and develop our key hub airport. I hope that one thing the Minister will look at is the timeline for the western rail access. Given the widespread support across the House for that access, I hope that the timeframe will be greatly shortened so that people can get the shovels in the ground on this project, which makes eminent sense.

I am conscious that I could give a long list of improvements that are needed. I am sure that several contributors are about to highlight those they see as vital for their areas. For me, there are two key issues that affect the whole network—resilience and electrification. The Dawlish collapse brought into stark view how vulnerable parts of the main line are. That is not the only issue, but it has given us the opportunity to debate all these other issues. As my hon. Friend the Member for South West Devon (Mr Streeter) said in his foreword to the “On Track” report by the Peninsula Rail Task Force:

“It took a crisis to get here, but this is our chance”.

It is worth looking at the impact that that crisis had. My hon. Friend the Member for North Cornwall (Scott Mann) reminded us of the impact that the railway has on tourism. Some 7% of Torbay’s tourist visitors come by train. After the pictures of the hanging tracks in the media, there was a 20% drop in tourism bookings because of the image it created. That shows that this is not just a transport issue.

Huw Irranca-Davies Portrait Huw Irranca-Davies
- Hansard - - - Excerpts

I want to support the point the hon. Gentleman is making. The incident he is talking about was the most extreme example of damage to a piece of major rail infrastructure. It is no fault of Great Western Railway, but I travelled up from south Wales by bus for part of my journey today because of flooding on part of the line. Okay, that is an extreme event, but we are having more and more. There is also regular flooding around the Severn tunnel. Does the hon. Gentleman agree that we need to be absolutely sure that we have a resilient railway structure, as well as having electrification?

Kevin Foster Portrait Kevin Foster
- Hansard - -

I agree completely. My constituency is not scheduled to benefit from the electrification project, but it is affected by flooding on the Somerset levels. It is vital that we make sure our railway is future-proofed. A few years back, I took a bus in the constituency of the right hon. Member for Exeter (Mr Bradshaw) when there was flooding on the railway line across Cowley bridge that looked like something out of the Bible. It is vital that we tackle the range of resilience issues, not just the very famous issue on the coast. I know that Network Rail is looking at the cliffs near Teignmouth. I am sure that my hon. Friend the Member for Newton Abbot (Anne Marie Morris) will talk a bit more about that in her contribution. That aspect needs to be looked at too, not just the sea wall. Much of the signalling throughout Devon and Cornwall was installed in the 1960s. It is listed for consideration in control period 6, which is between 2019 and 2024, and it is vital that that goes ahead because we must improve journey times and ensure a modern infrastructure.

The issue of resilience has been brought into focus by the imminent publication of the final report from the Peninsula Rail Task Force, which will set out its 20-year plan for railways in Devon, Cornwall and Somerset. Resilience will be at the heart of that, and it is vital to have the funding needed to complete such a commitment. There have been encouraging noises on that issue over the past week or two, and I hope that we might hear a couple more words from the Minister when she responds to the debate. It is clear just how vital it is that we secure that line.

Electrifying the Great Western route into south Wales is probably the single biggest project on that line since the Severn tunnel, and it will electrify the line in communities along that route—I suspect that colleagues may wish to speak a little more about that. It is pleasing that in the south-west it is no longer the case that the only way to get close to a bit of electrified track is to buy a train set! As a member of the Public Accounts Committee I have sat through a discussion on progress so far—not least the estimated cost of that electrification, which has now reached £2.8 billion—and I imagine that the Minister might not be relishing the thought of committing to more such projects. However, it is right that those issues are highlighted, as investment must not just be about creating a corridor for electric trains to speed through to south Wales; it must be the starting point for an integrated network of electrification across the areas served by Great Western Railway.

--- Later in debate ---
Kevin Foster Portrait Kevin Foster
- Hansard - -

I am enjoying the hon. Gentleman’s speech, but does he agree that we must ensure that the rolling stock that we have is correctly specified? Cross-country journeys connect parts of south Devon and, sometimes, south Wales on the route to Birmingham, and some trains have not been not specified to go along a piece of track that a wave might go over.

Huw Irranca-Davies Portrait Huw Irranca-Davies
- Hansard - - - Excerpts

That is a very good point. I hope that what has been said today will be noted not just by the Minister, but by train operating companies and infrastructure companies. I hope that they will act on the suggestions that have been made by Members, so that their services can work better for commuters and other passengers.

Several Members on both sides of the House have drawn attention to the importance of the spine of the network to all the branches that flow from it. It is not just to do with high-speed links or electrification. I travel here from Maesteg, where I live with my family—it is north of Bridgend, up the Llynfi valley—and I am fortunate that we still have a branch line there. Thank goodness that, at the height of the Beeching cuts, there was local opposition and strong-minded leadership in the Labour authority, and people fought and said that they would be damned if that line would close. They managed to keep it open, and nowadays it is a tremendous success. That route from Maesteg down to Bridgend, and all the way up to Chepstow and beyond, is a very popular route and we need to go further. We talk about travel-to-work areas. The people in my constituency travel down from Maesteg and from all the valleys I represent to work in Swansea, Bridgend and Cardiff, and they need good reliable and affordable transport in order to do that. We are fortunate that we have that in the Llynfi valley and we need to keep it that way.

We are also fortunate that we were able to open a new station on the Great Western mainline spine. It is rare to see that happen nowadays. The station at Llanharan, between Cardiff and Swansea, was closed in the ’60s under Beeching, but after a fight lasting more than 40 years, we were able, along with local Assembly Member Janice Gregory and local councillors Geraint Hopkins, Roger Turner and Barry Stephens, to reopen it. It has had great benefits, with more than 2,000 homes being built in the area and possibly another 2,000 on the way. The station has been an economic boon to the area. People want to come and live there because it is not just a place along the Great Western spine route; it now has a station. The point has been well made that we must ensure that we do not bypass communities when we deliver the electrification and the mainline spine; we also need to connect the spine to the communities.