High Speed Rail (London - West Midlands) Bill (First sitting) Debate

Full Debate: Read Full Debate
Department: Department for Transport

High Speed Rail (London - West Midlands) Bill (First sitting)

Jonathan Reynolds Excerpts
Tuesday 1st March 2016

(8 years, 8 months ago)

Public Bill Committees
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
It is imperative that as we proceed through the Bill we do everything to make sure we delineate and specify the scope and range of the Bill. Anything that is to be done in future should have a process and a methodology to produce the greatest possible degree of openness and transparency. A report laid before Parliament and publication on the nominated undertaker’s website would achieve that. I trust that the Minister sees the logic of what we are proposing, but we will press the matter to a Division if it is not accepted.
Jonathan Reynolds Portrait Jonathan Reynolds (Stalybridge and Hyde) (Lab/Co-op)
- Hansard - -

I am delighted to be here in Committee. I have served on Bill Committees that have been likened to being on a long train journey in the same carriage with the same people for several weeks. However, at two weeks, this is a high-speed Committee.

I am a supporter of HS2 and have been a supporter of investment in our rail network for some time. HS2 is a very good project for my constituency and for Greater Manchester. That is widely recognised, and the justification is capacity. Even when a lot of publicity was initially given to the speed of the journey time, for me the project was always about capacity. The figures bear that out. Anyone who has caught a train at a particular time from Euston to Manchester Piccadilly will be familiar with our capacity problems. It is extremely clear when we look at the alternatives that patching the existing network or building a new line that is not a high-speed line will not meet the capacity need. The evidence is that we need a project such as this. We have support for the project from both sides of the House of Commons and we should proceed as soon as possible.

The consensus on the merits of the project means that we have to be particularly diligent in Committee to make sure that the powers granted to the Government in the Bill are proportionate and effective. As has been said, the High Speed Rail (Preparation) Bill went through an extremely good process and garnered more support for the project as it proceeded. I read clause 4, as my hon. Friend the Member for Middlesbrough did, as a wide-ranging and permissive set of powers, particularly subsection (4). My reading of it makes it, in legal terms, the same as a compulsory purchase order. There will be understandable concerns that it will weaken accountability and the scrutiny that we gave the provision in the High Speed Rail (Preparation) Bill. We need to be careful that we do not lose some of the good will that we have garnered so far in this process. I hope that the Minister will make clear why the clause is drafted as widely as it is. Will he tell us the benefits of the clause over the reasonable amendment tabled by my hon. Friend the Member for Middlesbrough?

Robert Goodwill Portrait Mr Goodwill
- Hansard - - - Excerpts

As we have already discussed, clause 4 refers to powers to acquire land compulsorily. Compulsory powers are needed because they are a tried and tested method of delivering major infrastructure projects. We have provided safeguards for property owners that go beyond the statutory requirements under normal compulsory purchase rules. For example, we have introduced the voluntary purchase scheme for properties between 60 and 120 metres from the centre of the railway and the need-to-sell scheme for those who have suffered perceived blight due to the railway. The latter has no geographical limit.

The detail of the modifications is set out in the schedule. The hon. Member for Stalybridge and Hyde talked about the importance of capacity. We need to be clear that when we talk about capacity, we are talking about people standing on trains. On most weekday mornings about 4,000 or 5,000 people are standing on trains into Euston and a smaller but still significant number are standing on trains into Birmingham New Street.

The hon. Member for Middlesbrough mentioned clause 65(c). This does not seek to purchase land specifically for phase 2; it relates only to land within limits and does not give a general power to acquire land. While I am not against the flow of what the hon. Gentleman is saying, I believe that we have already addressed his fears in the way we have drafted the Bill. Indeed, clause 4(1) contains the power to acquire all land required for the scheme. The Bill divides that land into different categories. The main category is land within the limits of deviation for the work set out in schedule 1. Other land needed for construction and ancillary purposes is specified and identified in schedules 5, 7, 8, 11, 12 and 16, together with the purpose for which that land is required. There is, therefore, no land within clause 4(1) that is not specifically authorised for compulsory purchase.