Defence Procurement and Supply Chains Debate

Full Debate: Read Full Debate
Department: Ministry of Defence
Tuesday 1st December 2020

(3 years, 4 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

John Spellar Portrait John Spellar (Warley) (Lab)
- Hansard - -

I congratulate my hon. Friend the Member for Birkenhead (Mick Whitley) on securing the debate. He listed a number of criteria for people to be here. I tick two of the boxes: as a former union national officer and as a Minister. Indeed, I have been campaigning on this issue for many years, including when I was a Minister. I think colleagues need to understand that, underlying the debate, is a deep sickness within our civil service, which disregards, and even has a contempt for, manufacturing. It is laughable that we are having a debate with the EU over state aid when the Government refused to use the powers that they already have under European regulations. Quite frankly, other countries do not have to do that.

Let us take the example of the fleet solid support ships. France and Italy have ordered ships and prescribed that they be made in their own yards, and the same is true of the Germans. They use, interestingly enough, a foreign design, but they stipulate that the ships have to be built in German yards. There should never have been a question about this. There should have been a lot of work for our shipyards that would maintain a flow of work for the supply industries and, in particular, for the steel industry. Now there has been a welcome development in that the Secretary of State, who previously said that he would be putting out the invitation to bid in the spring, told a recent hearing of the Select Committee that that would happen shortly. I hope that that means that we are bringing that work forward. The Minister will be pleased to learn that I have been drawn to take part in Defence questions next week, when I shall be pursuing this issue.

We need to press on and do what would be taken as read in other countries. Companies understand that. They understand that if they are to sell in those other countries, they have to have substantial manufacturing bases there. Here they believe they can get away without having that. Furthermore, in its assessment of contracts, the Treasury refuses to consider the 30-odd per cent. that will come back to the Treasury directly in the form of the taxes paid by the workforce.

As the hon. Member for Bracknell (James Sunderland) pointed out, the problem goes across the board and includes police cars, fire engines, trains and, recently, hydrogen buses. We are putting lots of money into green hydrogen buses, and there is a nice picture of one in Tyne and Wear that clearly shows that it was made in China. The UK and the Scottish Governments are putting a lot of money into wind turbines, but a huge amount of the work is going overseas. As I said, no one else behaves like that.

I also draw attention to and praise the document from the Confederation of Shipbuilding and Engineering Unions on shovel-ready defence programmes. It argues that we should do what Germany and France are doing and bring work forward. We already know that we need the kit and have already contracted for it, so we can help those companies and, in particular, their long supply chains to keep their workforce and to continue investing in equipment if we bring forward orders for equipment that we already know about. That is also important for aerospace. The civil aerospace industry is flat on its back as a result of the aviation crisis. Helping the supply chain through help to military aerospace is enormously important. As the hon. Member for Bracknell said, the issue is also important for exports. People will come to our companies and say, “If it is not good enough for the British armed forces, why do you say it is good enough for us?”

It is not just about the companies but about the apprentices who are the skilled workforce of the future and the backbone of engineering. It is about good skilled jobs, often in communities that are at the centre of the levelling-up agenda across the country. Many of the companies depend on major plants that have satellite plants around them. They have served us well for many generations. We should back them now.

Charles Walker Portrait Sir Charles Walker (in the Chair)
- Hansard - - - Excerpts

I call Kim Johnson—five minutes.

--- Later in debate ---
Jeremy Quin Portrait Jeremy Quin
- Hansard - - - Excerpts

I have the gift of foresight. Only very recently, I was on a call with the First Minister of Northern Ireland with Northern Ireland defence contractors, talking about the opportunities that may come up. I know that the Chief of the Air Staff will be in the Province to talk about opportunities in aerospace, and we are minded to see how we can support all parts of the United Kingdom, absolutely including Northern Ireland.

To go back to the north-west, the Typhoon programme makes a significant contribution to the UK economy, generating billions of pounds through exports. That is an important issue, which my hon. and gallant Friend the Member for Bracknell raised. That will be enhanced not only by the recent radar development, which has secured in excess of 600 jobs, including 120 jobs at BAE Systems Warton in Lancashire, but also by the recently signed Quadriga contract, which secures further skilled manufacturing work to build parts of 38 new aircraft at BAE Systems Samlesbury, including engineering roles that are central to the UK’s future combat air ambitions.

We can be positive about the future for defence across the UK. The four-year settlement provides the financial certainty needed to pursue a radical modernisation programme to meet today’s threats and prepare for the future.

I urge the hon. Member for Portsmouth South to be a little patient. We have the funding envelope and we are looking forward to producing the integrated review and the defence and security industrial strategy. These are three important parts of the stool that will take us forward for the next few years. It is a platform for the future. I recognise the hon. Member’s eagerness to see those things announced. I would ask him to be patient a little longer. He is obviously happy with the first part of the stool—we have the other two legs to produce, and I hope to bring them forward as soon as practical. As he appreciates, these are cross-Government reports. We will bring them forward when we can.

The four-year settlement ensures that the armed forces will be able to adapt to the threat with cutting-edge technology, compete effectively in the information age and fight decisively when required. It will position the UK as a global leader in the new domains of cyber and space and transform the UK’s capabilities across sea, land and air.

As has been stated, it is underpinned by record investment of at least £6.6 billion on military research and development. I hope to encourage the hon. Member for Liverpool, Riverside (Kim Johnson), who is keen to see us committing to programmes. The announcement that the Prime Minister made confirmed our order of eight Type 26 and five Type 35 frigates.[Official Report, 7 December 2020, Vol. 685, c. 6MC.] It also supports a subject close to the heart of a number of people in this Chamber—the future of the fleet solid support ship programme, which will supply our carrier strike group, and which I know is of direct interest to the right hon. Member for Warley (John Spellar), as it is to the hon. Member for Birkenhead, among many Members. That is an ongoing process, as the right hon. Member for Warley knows; I look forward to his Defence question next week. The competition will be launched next year. I was going to say in the spring, which is but a short step away. We are looking forward to spring dawning.

John Spellar Portrait John Spellar
- Hansard - -

Will the Minister give way?

Jeremy Quin Portrait Jeremy Quin
- Hansard - - - Excerpts

I give way to the right hon. Gentleman, as I thought I might have to.

John Spellar Portrait John Spellar
- Hansard - -

This is absurd. We know what the requirement is. It has already been out to one tender. The only argument was about whether it was a warship. Why are the Government still dithering? Why do they not get the order there, let companies bid in and let their suppliers know and start tooling up and getting supply chains working? Why can they not get a move on?

Jeremy Quin Portrait Jeremy Quin
- Hansard - - - Excerpts

The right hon. Gentleman will be aware that these are warships, which I know he regards as a great step forward in our thinking, as we have learned more about how they will operate in the carrier strike group. He will just have to be a little more patient. We are getting on with the procurement. Come the spring, he will see that competition launched.

John Spellar Portrait John Spellar
- Hansard - -

Why the delay? Quite frankly, they could always have been designated as warships, because they always had guns on them. What is holding it up now?

Jeremy Quin Portrait Jeremy Quin
- Hansard - - - Excerpts

First of all, we have had a delay in this programme for quite some time—I do not know if it goes quite back as far as the previous Administration, but it might well have done. For a long period, people have been thinking about the FSS and how exactly it should be incorporated. All I can say is that I am delighted that, very soon, the right hon. Gentleman’s pain will be over, with the competition being launched. I am pleased that we have reached that point. It is critical, as the right hon. Gentleman will agree, that the next competition is extremely well founded, well based and successful, and we are putting in place the basis to ensure that that is the case.

I must move on. Another major project of direct importance is the future combat air system, which is a truly strategic endeavour. It will build on the success of Typhoon and F-35 to again promote great jobs in engineering in our high engineering base in the north-west of England and throughout the UK. On land, our exciting £2.8 billion commitments to Boxer at Telford is now feeding through supply chain orders throughout the sector. All these programmes, whether at the cutting edge of maritime combat, air or land capabilities support jobs not only at tier 1, but throughout the supply chain, as has been said, with 119,000 directly employed and a further 80,000 or so employed through the defence supply chain. While decisions on the allocation of funding across the breadth of our capabilities will be made and announced in due course, this settlement will support skills and jobs, and apprenticeships, as mentioned by my hon. Friend the Member for Barrow and Furness (Simon Fell), throughout the UK.

In order to ensure a strategic approach, I announced earlier this year that we are leading a cross-Government review of the UK’s defence and security sectors. It will identify how we can ensure that we have competitive, innovative and world-class defence and security industries that drive research and investment. We recently launched the social value in procurement model which, to the hon. Member for Portsmouth South’s point, will provide another tool to ensure our major procurement projects evaluate priority social value themes and outcomes linked to prosperity. As part of the defence prosperity programme, we are working with industry and Government colleagues to develop a joint economic data hub within the UK Defence Solutions Centre to collect and aggregate economic data from across the sector. It will provide a better understanding of the economic contribution of the defence sector at a UK, national and regional level that can inform our decision-making process.

Throughout defence, we are committed to ensuring that we seize the opportunities provided by smaller companies. We are targeting a 25% spend with such companies. We have already hit 19%, up from 13% a couple of years prior to that. We are extremely mindful of the need to maintain a clear vision of our supply chain, and we are working through a Department-wide supply chain resilience and risk programme. Defence has some of the most complex supply chains and challenging procurement programmes across government. However, they contribute to the UK’s proud history of providing the skills, capabilities and equipment that keeps us and our allies safe, and I am convinced that, given the Government’s commitment, the UK will have an equally proud future.