Great Western Line: Electrification Debate

Full Debate: Read Full Debate
Department: Department for Transport

Great Western Line: Electrification

John Penrose Excerpts
Tuesday 22nd November 2016

(7 years, 5 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Charlotte Leslie Portrait Charlotte Leslie
- Hansard - - - Excerpts

The hon. Lady also anticipates something that I will raise in my speech. Whichever Government want to make dramatic railway infrastructure improvements, they face challenges. Whether a Labour Minister or a Conservative Minister was sitting in the Minister’s chair here, I suspect that the challenges involved in delivering what they want to do could be very similar. I will come back to that point in my speech.

I am afraid that all south-west MPs might agree that, when we see the bills for HS2 soaring to £42 billon, the deferral of our meagre-by-comparison £5 billion project is particularly hard to swallow, especially since the south-west has consistently been among the bottom regions in the league tables for regional spend per capita.

The south-west is a region that boasts exciting opportunities, that is incredibly fast-growing, and that desperately needs the kind of focus on rail investment that we have seen with HS2 and Crossrail. So, forgive me, Minister, if I say for the south-west that, when it comes to seeing actual infrastructure—not promised but built—many people in the region feel that it is now our turn.

Nevertheless, returning to the point that my hon. Friend the Member for North Wiltshire (Mr Gray), raised, there have been improvements and the Government are making efforts. I must also be fair about the context of this debate. I recognise that, this deferral notwithstanding, the region will still receive, which it might not have received otherwise, 5,000 extra seats on journeys into London at peak time. Most of us have made that journey, so we know that those seats will be welcome. We have been promised new trains, which will deliver faster journeys. We are told that there will be station improvements down the line. However, I hope that the Minister will forgive me for being honest and saying that, given the recent announcement of the deferral, we will believe these things when we see them. I would also appreciate a bit more clarity in the Minister’s response about the exact tangible benefits we will get in return for what has been a hard blow in the form of the announcement of deferral.

As I said, the improvements are welcome, and I do not want to be ungracious by denying that. However, major concerns remain about what the decision says about how we do big infrastructure projects and I will be asking the Minister specific questions. If he is not able to answer them today, I would deeply appreciate a detailed written response.

John Penrose Portrait John Penrose (Weston-super-Mare) (Con)
- Hansard - -

I want to pick up on my hon. Friend’s earlier point about the south-west not always being at the front of the queue for such things. Bristol is, I think, the fastest-growing core city outside London, and therefore has a huge economic benefit to bring to the country. Does my hon. Friend agree that it is strange, therefore, that other areas have been given preference on the list for electrification? The deferral also includes the deferral of some of the Thames valley commuter lines and some of the lines to Oxford. Would it not now be sensible to re-examine the business case for the electrification of some of the lines radiating out from Bristol, on the basis that the economic case for Bristol’s economic zone must make it more attractive? That would go some way towards addressing the relatively low priority that Bristol and the south-west have previously been afforded.

Charlotte Leslie Portrait Charlotte Leslie
- Hansard - - - Excerpts

If Hansard could kindly ascribe my hon. Friend’s comments to me I would be very grateful, because that is exactly the point I want to make. Yes, it does seem strange. It plays to a historical view that the south-west is always overlooked. I do not understand why we seem to have been axed when other places still seem to be a political priority. On the economic arguments, that does not make sense.

--- Later in debate ---
Paul Maynard Portrait Paul Maynard
- Hansard - - - Excerpts

I have just said that we will be making announcements about what—[Interruption.] Is the hon. Lady going to listen to my reply or just mutter at me? I am happy to respond to her point if she wants to listen. We will take decisions about what control period 6 comprises and announce the whole of that control period at the appropriate time. As a member of the Public Accounts Committee, she will be more than aware that Sir Peter Hendy has already reprogrammed other projects across the country. As Rail Minister, I am not prepared to part-announce elements of control period 6 depending on what debate I happen to be in at any moment in time. That would not be a prudent way to go forward—nor, were I in her position on that Committee, would I think it a particularly prudent position for any Minister facing her queries to take.

John Penrose Portrait John Penrose
- Hansard - -

Will the Minister give way?

Paul Maynard Portrait Paul Maynard
- Hansard - - - Excerpts

I will happily give way, and then I will need to make a little progress.

John Penrose Portrait John Penrose
- Hansard - -

Can the Minister reassure us that as a result of the deferral that he has just described, the cost-benefit ratio of the elements of the programme that have been paused will not be substantially changed? Can he also provide us with information about how those cost-benefit ratios compare with both the decision not to go ahead at all with the electrification of the suburban Bristol railway lines and things that are going ahead, such as High Speed 2?

Paul Maynard Portrait Paul Maynard
- Hansard - - - Excerpts

There will always be ongoing recalculations of the cost-benefit ratios of any wider projects, as well as the elements within them. I do not see this as a matter of HS2 or the great western main line. There are investment backlogs that we have to catch up on in all parts of the country, and each investment has to respond to a specific rail need in that region. Here, we are trying to respond to a specific rail need by ensuring that all the passenger benefits that can be accrued by electrification can be delivered as soon as possible for the use of the new bi-mode intercity express programme trains.

John Penrose Portrait John Penrose
- Hansard - -

rose

Paul Maynard Portrait Paul Maynard
- Hansard - - - Excerpts

If the hon. Gentleman wants to intervene, it will have to be the final occasion.

John Penrose Portrait John Penrose
- Hansard - -

That is very reassuring. I would be very happy if the Minister would provide the specific numbers that I asked for, perhaps in a letter.

Paul Maynard Portrait Paul Maynard
- Hansard - - - Excerpts

I will happily write to the hon. Gentleman with that information at a later point. That is more than fine.

Hon. Members have noted the extra seats and the 15-minute journey time saving from London Paddington to Bristol Temple Meads via Bristol Parkway that the new trains will provide, and I hope that they will also note that those trains should stimulate economic growth across the region as a whole. Bristol is one of the few cities that is a net contributor to the UK Treasury, and that has to be recognised. We need to do more to work with Bristol to ensure that all those in the commuter belt around Bristol are properly able to access the city. That entirely makes sense. But we need to go back to the fundamental point that modernising this line has been an ambitious and challenging undertaking, and it has not been straightforward. Even closing the Severn tunnel for six weeks this autumn has caused immense disruption to journeys and people’s lives, but it has been worth while, because had we not closed it for those six weeks, there would have been five years of weekend work and disruption.

As a result of that challenge and the complexity of the work, with ageing assets, heritage sites and a very busy line that Network Rail has to work around, difficulties have occurred. As was mentioned, the National Audit Office report was highly critical of what had occurred. However, what is often not pointed out in these debates is the recognition the NAO has given to the changes that the Department has made since 2015. In particular, we now have a programme board for each route upgrade across the country, chaired by a senior responsible owner from the DFT, to provide effective oversight of delivery.

We are working closely with Network Rail, train operators and other partners to ensure that major construction works and the introduction of new train services occur in a pragmatic, sequenced and timely manner and that all elements of those complex processes interact sensibly with each other. There is no point in delivering a piece of rolling stock that cannot operate on a particular track because the infrastructure work has not been done. That requires work to be sequenced. Much of the criticism in the NAO’s report was of the failure to sequence early on in the process and understand the true scope of the project.

My hon. Friend the Member for Bristol North West was concerned that the decision represents a waste of money. I would say that it does not at all. The preparatory work will enable future decisions to be taken, which is also a point that she made. If one takes some of the work around Bristol East junction, for example, the savings made through the deferrals are specifically targeted at bringing forward the work to enable the capacity improvements that will allow full advantage to be taken of the new bi-modes. If that did not occur, there would be less benefit from having the bi-modes because there would not be the capacity at Bristol East junction. That underlines the point about sequencing work and, in a project of this complexity, the overall need to have a degree of flexibility in the system so that, as technology moves on, options change and new pieces of locomotive and rolling stock come on stream, we have the capacity in our projects to make those pragmatic decisions and seek to deliver the benefits to passengers as soon as is possible.

As I mentioned earlier, this decision underscores a wider approach to rail investment across the country as a whole. Passenger outcomes must be delivered while achieving the best value for every pound spent. On that point, the Government have been clear about the rationale for electrification. We are not against using electrification as part of a wider strategy for delivering improved services. Electrification does bring benefits. It enables, for instance, the use of electric trains, which over time reduce the cost of running the railway as well as bringing environmental benefits—but we have to make improvements in the way that makes most sense and gives most value to the taxpayer. Therefore, in some cases, where a train can run on both electric and diesel power, it is right to look at how that can be factored into any decision about how we sequence the different elements of any electrification process.

In the end, electrification is not an objective. It is a means to an end. It is an input. It is about putting wires up. It is about traction and power. It is an engineering solution to a defined problem. Yes, it is an enabler of new trains, but that new capacity is needed by passengers as soon as possible. Therefore, if we have access to these new trains, I think it right that we go down that path.