John Leech
Main Page: John Leech (Liberal Democrat - Manchester, Withington)Department Debates - View all John Leech's debates with the Department for Transport
(13 years, 7 months ago)
Westminster HallWestminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.
Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
It is a pleasure to serve under your chairmanship for the first time, Mr Walker. I am delighted to have the opportunity to speak in this debate. As I am mindful of the time, I certainly will not take my six minutes.
This is a timely debate, given that the Transport Committee is about to embark on an inquiry into high-speed rail. I urge the many right hon. and hon. Members who show a keen interest in the issue to make their views known so that our inquiry can take them into consideration when reaching a decision on the strategic viability of high-speed rail.
To put my cards on the table, I have always been a big supporter of creating a high-speed rail network that not only connects Birmingham and the northern cities of Manchester and Leeds but goes all the way to Scotland and allows rail services from Scotland to compete with domestic flights. At the same time, I recognise that an infrastructure project of such size can create a great deal of controversy, and that it will have a terrible impact on some people who live along the line.
I certainly would not decry any hon. Member for doing their job in representing their constituents’ concerns. Any infrastructure project of such a size will cause significant disruption and heartache for the people whom it affects. I have some sympathy with the right hon. Member for Holborn and St Pancras (Frank Dobson), given the impact that the project will have on his constituents.
In my constituency, the extension of the Metrolink is certainly causing a significant amount of heartache among many of my constituents who support the project on the whole but have problems with non-adherence to promises made before work was commenced. One can understand why some residents turn against schemes and have major concerns about their impact. That is why it is vital that clear and transparent decisions are made about the local environment and how it will be protected for the people most affected by the route, and that those decisions are stuck to. However, I certainly hope that high-speed rail will go ahead, and I will comment briefly on why I think it must.
By pressing ahead with a high-speed rail network, we can ensure sufficient rail capacity for the foreseeable future. Some opponents have argued that upgrading the existing main line networks would deal with any capacity constraints, but that would only address the problem in the short term. Ultimately, a high-speed rail network will inevitably be necessary. We must consider the next 100 years, not just the next 10. Some £10 billion has already been spent on upgrading the west coast main line, yet on 1 March, the new chief executive of Network Rail made it clear that the west coast main line would be at full capacity again within six to 10 years. In an answer to my question, he said that
“the West Coast line, within 10 years at the absolute maximum, and probably six years, will be at capacity, and that is with additional carriages included in the area. We can look at other tactical interventions in that line to put more capacity in there, but in the end it comes down to capacity: we will, across a number of key parts of our network, run out of capacity.”
The chief executive of Network Rail is absolutely clear that even with extra costly improvements, the west coast main line will not have enough capacity to deal with the growth in rail travel. We need the high-speed network to accommodate future rail travel.
Competing services and franchises are already battling for space on the network. We in Manchester are lucky to have a good service to London. I suppose that I should declare an interest as a regular user of that service, including the 9 o’clock train this evening. Due to the success of the franchise, Virgin is considering extending the service to four trains an hour rather than three, but doing so would adversely affect both local and regional services, so the local integrated transport authority understandably opposes any additional trains on the Manchester to London service. The creation of a high-speed network will release significant capacity on the existing network, allowing the expansion of regional and local services that are completely constrained at the moment by the needs of longer distance services.
To add a word of caution, I hope that the Minister can put hon. Members’ minds at rest about the impact of spending on high-speed rail. Many people have argued that we should not proceed with high-speed rail because it will result in a lack of investment in the existing network as all the money is diverted into paying for the high-speed network. It is worth pointing out that the coalition Government have already shown a commitment to investing in rail infrastructure, despite the difficult economic times. Again, I welcome the announcement in the Budget of funding for the Ordsall curve in Manchester, which will have a dramatic impact on capacity and journey times, but I hope that she can assure us that high-speed rail will not get the go-ahead at the expense of investment in the existing network. I hope that she will make that clear in her remarks.
Before I was interrupted, I was about to say that it is clear that a project of this size and scale will not be without controversy, which I shall come on to later. However, I certainly recognise the importance of increasing capacity and connectivity in rail, particularly in respect of the west coast main line and the Chiltern line. The previous Labour Government rightly assessed that improved transport capacity would be needed from the 2020s between our major cities, starting with the route from London to the west midlands, two of Britain’s largest conurbations. The projections show that by then, the west coast main line will be at capacity. It is projected that, by 2033, the average long-distance west coast main line train will be 80% full, with routine severe overcrowding for much of the time.
Perhaps there will be benefits from some of the suggestions put forward by my hon. Friend the Member for Luton North (Kelvin Hopkins), the hon. Member for South Northamptonshire (Andrea Leadsom) and my hon. Friend the Member for Coventry North West and others, but I also understand the argument that the development of the 335-mile Y-shaped network would bring our major cities closer together and, as such, create the potential to boost investment and economic growth in the north. I would like to ask the Government how much extra capacity they anticipate high-speed rail will bring, and what estimates they have made of the modal shift from air travel that would result from the extension.
Labour remains committed to investing in a world-class rail system, and high-speed rail could have an important role to play in delivering it. That is why we began this process in government. As Members will know, Labour has just embarked on a fundamental review of all its policies, which is exactly what the Conservatives did after the Prime Minister became leader of that party. We will look at all areas of policy, and fundamental questions will be asked about how we can make transport more affordable and help to reduce inequality and increase social mobility.
Absolutely. As I have said, capacity on the west coast main line is of fundamental importance, and the issue must be resolved. We have to look at future capacity on rail lines and how we will deal with such issues. Clearly, everything will be on the table as part of our policy review, and we encourage as many members of the public as possible to get involved in our ongoing discussions, including those on both High Speed 2 and Rail Package 2; we need to study alternatives for viability as well. It would be unwise for any future support for high-speed rail not to be at the heart of that policy review when it involves a £30-billion commitment for future Parliaments. Perhaps the hon. Member for Weaver Vale (Graham Evans) will be interested in that. In the meantime, the Government will have our support as they move forward with the next stage of planning the route.
Clearly, there is concern about the hybrid Bill that the Government propose. The Opposition have real doubts about their commitment to taking the planned high-speed rail line beyond Birmingham, as Labour had planned. They have decided not to use the forthcoming legislation to do that. As I have said in previous debates, we will support the Government if they want to put powers in the Bill to extend the line to Leeds and Manchester.
I wish to turn briefly to interoperability. If we are to proceed with high-speed rail, we need to look now at ways to integrate it with the traditional rail network. We also need to look at how we can maximise the benefits for rail all over the country, including London-based projects such as Crossrail and Thameslink. How will we plan for the wider impacts of high-speed rail, to ensure that the benefits are shared in other parts of the network? For instance, can the Minister tell us how many more fast trains to London there will be from places such as Coventry, Liverpool and Sheffield as a result of released capacity from the HS2 line? In short, what will be the benefit to areas not directly connected by high-speed rail?