(6 days, 3 hours ago)
Commons ChamberIt is a pleasure to follow the hon. Member for Christchurch (Sir Christopher Chope), given his deep experience and interesting perspective on bringing in tolls for all our motorways. That may be what happens in certain countries, but I suspect the whole funding of their road network is somewhat different from ours, so I will go back to focusing on the Bill.
I have driven on roads in other countries, and across the bridge to Wales in the past, and it seems entirely natural to me for us to introduce a toll for the lower Thames crossing. It is parallel to the tolled Dartford crossing, and it is hardly going to be the first toll road in the UK. I welcome the Bill, which will enable the funding of the lower Thames crossing to be delivered and maintained through tunnel users paying to use it. It is the first time that a road project has used the RAB model—a model that is already used for energy, water infrastructure and Heathrow airport.
Delivering improved transport infrastructure is core to this Government’s growth mission, so I am glad that the Government are exploring a range of both tried and tested and new methods of working with private sector investors to deliver projects. Those include using RAB for the roads for the first time—as in the Bill—as well as using the community infrastructure levy and further exploring the capture of land-value uplift on new rail schemes. Some of the early private finance initiative schemes in the mid and late ’90s gave public-private funding partnerships a bad name, but I am confident that the relationship between state commissioners and long-term private capital has matured in a way that can only be mutually beneficial.
On the RAB model, however, I do have some concerns. While it provides confidence for investors and a rock-solid return—as the representative of potential investors in the lower Thames crossing told me—there is also a history of gold-plated, over-engineered schemes. Sometimes, as in the case of Heathrow airport, it can be poor value for money, as airlines and businesses that are captive tenants there tell me. All of Thames Water’s bill payers are funding the Thames Tideway tunnel—a project that provides no benefit to my constituency or the health of the River Thames in my constituency, as we are upstream of the intake of the Tideway tunnel.
While there is a regulator in the Bill—the Office of Rail and Road plays an important role—I wonder, as I do with many regulators, whether it has sufficient teeth and funding. Does it have the right powers and sufficient powers over issues such as sustainability, safety, customer focus and local communities? To look again at the example of Heathrow airport, I fear that the Civil Aviation Authority is far too weak in areas other than its core responsibilities of the economy and, of course, air safety.
There is one final issue with the lower Thames crossing that has been exercising both myself and the road haulage industry: the removal of any truck stop or motorway service area from the plans. The Transport Committee produced a report on this matter in 2022, when the hon. Member for Mid Buckinghamshire (Greg Smith), who is now on the Opposition Front Bench, was on the Committee. Our conclusions showed the critical impact of the shortage of safe, secure driver facilities around the south-east, and particularly on routes to and from Dover.
That message was repeated to the Transport Committee in March this year by the haulage industry and driver union representatives. Drivers are required to rest every 4.5 hours and need somewhere to stop and sleep in a place where they and their load are safe, yet we were told that at Medway and Thurrock services, on either side of the Thames, if a driver is not in the motorway service area by mid-afternoon, they would have to go and find an A road lay-by, meaning no toilets, no food and no safety.
Jen Craft
My hon. Friend mentioned Thurrock services. Thurrock is an area that will be heavily impacted by the lower Thames crossing, so I am very glad that she mentions the lack of a service station built into the plans. We already have significant issues with lorry drivers parking in inappropriate places on roads that are not built for that purpose, in order to get the rest that they need because they cannot get into a service station. Does my hon. Friend believe that the lack of a services facility as part of the lower Thames crossing will exacerbate that issue?
I absolutely believe that it will exacerbate the issue, because the lower Thames crossing will significantly increase vehicle throughput, particularly of trucks and lorries, on what is already a busy part of the network.
The originally proposed MSA or truck stop—I am not sure which—has been removed from the plans, and I am told that there is no plan and no requirement to bring one back. This illustrates a national policy gap. In the French motorway system, there is a full MSA every 50 km and partial ones every 10 km. I am told that it is not too late for proposals, and I really do hope that that is the case, although there would have to be a planning application from a landowner in order to bring one in. I cannot believe that it would not be a profitable opportunity for investors to do that and then in due course to link it into the lower Thames crossing, because of course it is only just along the road from the docks, so there is bound to be demand.
The Opposition amendment says:
“this House…declines to give a Second Reading to the Highways (Financing) Bill, because it has no confidence in the Government’s ability to deliver the project on time and on budget, given its record of cancelling major road schemes across the country”
and risks costs
“spiralling further out of control”.
That is rich coming from the party that oversaw most of HS2’s lifespan. HS2 is so desperately needed by our rail system and northern cities, yet what did the Conservatives do when in government? They started construction before the design was agreed and complete, then halted it and removed about half the length of HS2, thus completely undermining the business case. I could go on.
The lower Thames crossing was commissioned because the Dartford crossing has miles-long queues leading on to it. Extra lanes have been built on the M25, and we have all-lane running on many other motorways, yet on many of them traffic still crawls along at slow speeds due to the sheer level of congestion. While there is no doubt that the lower Thames crossing will relieve pressure on the existing Thames crossings for a few years after it opens, how long will it be until the toll payers are effectively paying to park on the approach road instead to cross to the other side of the Thames?
The DFT forecasts that road traffic will grow by 12% on motorways and 10% on all other roads over the next 10 years. To ensure that our roads do not grind to a halt, I really look forward to a policy that incentivises alternative travel options so that road space is available for those journeys for which there is no choice but to drive. For instance, increasing capacity at the Ely and Haughley junctions, or any number of other rail bottlenecks, would increase rail capacity for freight and passengers at a fraction of the cost of the lower Thames crossing or of opening another lane on a UK motorway.
I do hope that my hon. Friend the Minister and the Secretary of State can provide some assurance to me and this House. Unless there is an overarching transport strategy that supports modal shift, it will not be long before we need an even lower Thames crossing.