Lord McLoughlin Portrait Mr McLoughlin
- Hansard - - - Excerpts

I well understand the concerns raised by my hon. Friend. This is one of the problems when major work is done on the railways. As he may have heard earlier, I travelled in the cab of one of those trains on Monday to see some of the work that is already ongoing in preparation for the electrification of the whole line. There will be some disruption—that is unavoidable. Nottingham station was closed for five weeks over the summer, but the whole job was done on time and it actually came in £5 million below budget.

Ian Mearns Portrait Ian Mearns (Gateshead) (Lab)
- Hansard - -

T3. The Secretary of State will be aware that there has been significant disruption on the east coast main line because of infrastructure failure. I think we have now had three Mondays on which there has been significant disruption, and a fortnight ago 30,000 passengers were stranded, some for five or six hours, while repairs were carried out. The east coast main line was electrified on the cheap—many engineers tell us that, and there has been severe disruption. Can we do something about it, please?

Lord McLoughlin Portrait Mr McLoughlin
- Hansard - - - Excerpts

I understand the hon. Gentleman’s point. It relates to what we are doing with HS2 to increase capacity in the longer term, although that is not the short-term answer he wants. I was disturbed to read the reports about the delays on the line, and I will talk to Network Rail to see if there is anything we can do.