Wales Bill Debate

Full Debate: Read Full Debate
Department: Wales Office

Wales Bill

Guto Bebb Excerpts
Monday 11th July 2016

(7 years, 10 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Onshore petroleum licensing
Guto Bebb Portrait The Parliamentary Under-Secretary of State for Wales (Guto Bebb)
- Hansard - -

I beg to move, That the clause stand part of the Bill.

John Bercow Portrait The Temporary Chair (Sir Alan Meale)
- Hansard - - - Excerpts

With this it will be convenient to discuss the following:

Clauses 23 to 27 stand part.

Amendment 74, in clause 36, page 29, line 17, leave out from “wind” to end of line 18.

This amendment removes the 350 megawatts limit on the Welsh Government’s legislative competence in the field of energy.

Amendment 75, page 29, line 21, leave out from “zone” to end of line 22.

See amendment 74.

Amendment 76, page 30, line 2, leave out paragraph (c).

This amendment is consequential on amendments 74 and 75.

Amendment 77, page 30, line 16, leave out from “waters” to end of line 21.

This amendment is consequential on amendments 74 and 75.

Amendment 78, page 30, line 37, leave out from “waters” to end of line 39.

This amendment is consequential on amendments 74 and 75.

Amendment 79, page 30, line 40, leave out sub-paragraph (a)(ii).

This amendment is consequential on amendments 74 and 75.

Amendment 80, page 30, line 47, leave out from “waters” to end of line 48.

This amendment is consequential on amendments 74 and 75.

Clause stand part.

Clause 37 stand part.

Government amendments 47 to 49.

Clause 38 stand part.

Amendment 158, in clause 39, page 32, line 23, leave out “or (4A)” and insert “to (4D)”.

See amendment 160.

Amendment 159, page 32, line 27, at beginning insert

“subject to subsections (4B) to (4D),”.

See amendment 160.

Amendment 160, page 32, line 31, at end insert—

“(4B) Where Welsh Ministers are minded to grant planning consent for the construction or extension of a station generating electricity from wind which would have a capacity greater than 50 megawatts, they must not determine the application unless—

(a) they have sent to the Secretary of State—

(i) a copy of any representations made to them in respect of the application;

(ii) a copy of any report on the application prepared by an officer of the Welsh Government;

(iii) a statement of the decision they propose to make; and

(iv) where they propose to grant consent, a statement of any conditions they propose to impose and a draft of any planning obligation they propose to enter into and details of any proposed planning contribution; and

(b) either—

(i) a period of 14 days has elapsed beginning with the date notified in writing by the Secretary of State to Welsh Ministers as the date on which he received the documents referred to in paragraph (a); or

(ii) the Secretary of State has notified Welsh Ministers in writing that he is content for them to determine the application in accordance with the statement referred to in sub-paragraph (a)(iii) and, if applicable, the matters referred to in sub-paragraph (a)(iv).

(4C) Within the period of 14 days set out in paragraph (4B)(b)(i) the Secretary of State may direct Welsh Ministers empowered to determine the application for the construction or extension of a station generating electricity from wind which would have a capacity greater than 50 megawatts—

(a) to withhold consent for a further period up to six months;

(b) to provide further information about the application; and

(c) where he makes a direction under paragraph (4C)(a) within the period specified in the direction to direct them to—

(i) grant consent subject, if necessary, to the conditions set out at paragraph (4B)(a)(iv); or

(ii) refuse consent.

(4D) The Secretary of State may give a direction to Welsh Ministers that applications for consent for the construction or extension of stations generating electricity from wind which would have a capacity less than 51 megawatts must be determined by local planning authorities and must not be called in or determined by Welsh Ministers.”

Clause 39 would devolve powers for onshore wind development approval to the Welsh Assembly. This amendment empowers the Secretary of State to be notified and veto projects considered a Nationally Significant Infrastructure Project (NSIP). The Secretary of State would be given two weeks to inform Welsh Ministers that he wished to consider a project and he would have up to six months to direct refusal of the application. The amendment also empowers the Secretary of State to require Welsh Ministers to devolve approval for projects not considered a NSIP to local council level.

Clause stand part.

Clauses 40 to 43 stand part.

Amendment 81, in clause 44, page 34, leave out line 37 to line 5 on page 35 and insert—

“Omit sections 114 and 152 of the Government of Wales Act 2006.”

This amendment removes the power of the Secretary of State to veto any Welsh legislation or measures that might have a serious adverse impact on water supply or quality in England.

Amendment 125, in clause 44, page 34, line 38, leave out from “(1),” to end of line 40 and insert “omit paragraph (b).”

This amendment removes both the extension of the power in section 114 of the Government of Wales Act 2006 that would be introduced by clause 44(1) and the power in section 114 to block Assembly Bills in respect of water matters.

Amendment 126, page 34, line 41, leave out subsection (2) and insert—

‘( ) Omit section 152 of the Government of Wales Act 2006 (intervention in case of functions relating to water etc).”

This amendment removes both the extension of the power in section 152 of the Government of Wales Act 2006 that would be introduced by clause 44(2) and the power in section 152 of the Government of Wales Act 2006 to intervene in the exercise of devolved functions in respect of water matters.

Clause stand part.

Clause 45 stand part.

Amendment 130, in clause 46, page 35, line 33, leave out “consult” and insert “obtain the consent of”.

Clause 46 would require the Secretary of State to consult the Welsh Ministers before establishing or amending a renewable energy scheme as it relates to Wales. This amendment would require the Secretary of State to obtain the consent of the Welsh Ministers instead.

Amendment 132, leave out lines 1 to 3.

New section 148A(3) of the Government of Wales Act 2006 (as inserted by Clause 46) provides an exception to the consultation requirement for renewable energy schemes in respect of any levy in connection with such a scheme. This amendment is partly consequential upon amendment 130, but it would also mean that there would be a requirement for the Secretary of State to obtain the consent of the Welsh Ministers for any levy in connection with a renewable energy scheme as it relates to Wales.

Amendment 131, page 36, line 17, leave out subsection (2).

This amendment is consequential upon amendment 130.

Clause stand part.

Clauses 46 to 50 stand part.

Amendment 144, in clause 51, page 39, line 2, at end insert—

“( ) If a statutory instrument containing regulations under subsection (2) includes provision within devolved competence or provision modifying a devolution enactment, the Secretary of State must send a copy of the instrument or, if subsection (8A) applies, a draft of the instrument to the First Minister for Wales and the First Minister must lay it before the Assembly.”

This amendment and amendments 145, 146 and 147 are intended to apply appropriate Assembly procedures to regulations which make provision within the Assembly’s competence or which adjust the Welsh devolution settlement by modifying the Government of Wales Act 2006 or the Wales Act 2014 and provide for regulations containing provisions of this kind that amend primary legislation to be subject to an affirmative Assembly procedure, and for regulations containing provisions of the same kind which modify subordinate legislation to be subject to a negative Assembly procedure.

Amendment 147, page 39, line 2, at end insert—

“( ) In this section ‘devolution enactment’ means a provision contained in—

(a) the Government of Wales Act 2006 or an instrument made under or having effect by virtue of that Act;

(b) the Wales Act 2014 or an instrument made under or having effect by virtue of that Act.

( ) For the purposes of this section—

(a) ‘modifying’ includes amending, repealing and revoking;

(b) ‘within devolved competence’ is to be read in accordance with subsections (7) and (8) of section 17, but no account is to be taken of the requirement to consult the appropriate Minister in paragraph 11(2) of Schedule 7B.”

See the statement for amendment 144.

Amendment 150, page 39, line 4, leave out “primary legislation” and insert “an Act of Parliament”.

The amendment introduces separate provisions for the use of the power in clause 51 in relation to an Act of Parliament.

Amendment 82, page 39, line 6, after “Parliament” insert

“and the National Assembly for Wales.”

This amendment ensures that when exercising the power to amend, repeal, revoke or modify any Acts or Measures of the National Assembly for Wales, the Secretary must seek the permission of the National Assembly, as well as both Houses of Parliament.

Amendment 145, page 39, line 6, at end insert—

“(6A) A statutory instrument containing regulations under subsection (2) that includes—

(a) provision within devolved competence modifying any provision of primary legislation, or

(b) provision modifying any devolution enactment in primary legislation,

may not be made unless a draft of the instrument has been laid before and approved by a resolution of the Assembly.”

See the statement for amendment 144.

Amendment 151, page 39, line 6, at end insert—

“(6A) A statutory instrument containing regulations under subsection (2) that includes provision amending or repealing any provision of a Measure or Act of the National Assembly for Wales may not be made unless a draft of the instrument has been laid before and approved by a resolution of each House of Parliament and the Assembly.”

The amendment provides that where the Secretary of State uses the power in clause 51 to make regulations that amend or repeal an Assembly Act or Assembly Measure, then the regulations must be approved by the Assembly and each House of Parliament.

Amendment 152, page 39, line 7, at beginning insert “Subject to subsection (7A),”.

The amendment is linked to the provision that where the Secretary of State uses the power in clause 51 to make regulations that amend or revoke subordinate legislation made by the Welsh Ministers or the Assembly, the regulations would be subject to annulment by the Assembly and each House of Parliament.

Amendment 146, page 39, line 9, leave out

“, is subject to annulment in pursuance of a resolution of either House of Parliament”

and insert

“or the Assembly, is subject to annulment in pursuance of a resolution of—

(a) either House of Parliament, and

(b) if it includes provision that would be within devolved competence or provision modifying a devolution enactment, the Assembly.”

See the statement for amendment 144.

Amendment 153, page 39, line 10, at end insert—

“(7A) A statutory instrument containing regulations under subsection (2) that includes provision amending or revoking subordinate legislation made by—

(a) the Welsh Ministers, or

(b) the National Assembly for Wales as constituted by the Government of Wales Act 1998,

if made without a draft having been approved by a resolution of each House of Parliament and the Assembly, is subject to annulment in pursuance of a resolution of either House of Parliament or the Assembly.”

The amendment provides that where the Secretary of State uses the power in clause 51 to make regulations that amend or revoke subordinate legislation made by the Welsh Ministers or the Assembly, the regulations would be subject to annulment by the Assembly and each House of Parliament.

Amendment 154, page 39, line 11, leave out subsection (8).

The amendment removes the definition of “primary legislation”.

Clause stand part.

That schedule 5 be the Fifth schedule to the Bill.

Clause 52 stand part.

Government amendments 59 and 60.

That schedule 6 be the Sixth schedule to the Bill.

Government amendments 50 to 52.

Amendment 12, in clause 53, page 40, line 8, at end insert—

‘(4) Section 16(6) comes into force on the day appointed by the Treasury by order under section 14(2) of the Wales Act 2014 for the coming into force of sections 8 and 9 of that Act.”

The new limits proposed by New Clause 6 on borrowing by the Welsh Ministers are calculated by reference to the financial consequences of commencing the income tax provisions of the Wales Act 2014. This provision ensures that the new borrowing limits come into effect at the same time as commencement of the income tax provisions.

Clause stand part.

Clause 54 stand part.

New clause 4—Assignment of VAT

“(1) The Government of Wales act 2006 is amended as follows.

(2) In section 117 (Welsh Consolidated Fund), after subsection (2) insert—

‘(2A) The Secretary of State shall in accordance with section 64A pay into the Fund out of money provided by Parliament any amounts payable under that section.’

(3) After that section insert—

‘117A Assignment of VAT

(1) Where there is an agreement between the Treasury and the Welsh Ministers for identifying an amount agreed to represent the standard rate VAT attributable to Wales for any period (“the agreed standard rate amount”), the amount described in subsection (3) is payable under this section in respect of that period.

(2) Where there is an agreement between the Treasury and the Welsh Ministers for identifying an amount agreed to represent the reduced rate VAT attributable to Wales for that period (“the agreed reduced rate amount”), the amount described in subsection (4) is payable under this section in respect of that period.

(3) The amount payable in accordance with subsection (1) is the amount obtained by multiplying the agreed standard rate amount by—

10

SR

where SR is the number of percentage points in the rate at which value added tax is charged under section 2(1) of the Value Added Tax Act 1994 for the period.

(4) The amount payable in accordance with subsection (2) is the amount obtained by multiplying the agreed reduced rate amount by—

2.5

RR

where RR is the number of percentage points in the rate at which value added tax is charged under section 29A(1) of the Value Added Tax Act 1994 for the period.

(5) The payment of those amounts under section 64(2A) is to be made in accordance with any agreement between the Treasury and the Welsh Ministers as to the time of the payment or otherwise.’

(4) The Commissioners for Revenue and Customs Act 2005 is amended as follows.

(5) In subsection (2) of section 18 (confidentiality: exceptions) omit ‘or’ after paragraph (j), and after paragraph (k) insert ‘, or

(l) which is made in connection with (or with anything done with a view to) the making or implementation of an agreement referred to in section 117A(1) or (2) of the Government of Wales Act 2006 (assignment of VAT).’

(6) After that subsection insert—

‘(2B) Information disclosed in reliance on subsection (2)(l) may not be further disclosed without the consent of the Commissioners (which may be general or specific).’

(7) In section 19 (wrongful disclosure) in subsections (1) and (8) after ‘18(1) or (2A)’ insert ‘or (2B).’”

This new clause would allow the payment into the Welsh Consolidated Fund of half the receipts of Value Added Tax raised in Wales, on the lines of section 16 of the Scotland Act 2016.

New clause 5—Tax on carriage of passengers by air

“(1) In Part 4A of the Government of Wales Act 2006, after Chapter 4 insert—

Chapter 5

Tax on carriage of passengers by air

116O Tax on carriage of passengers by air

‘(1) A tax charged on the carriage of passengers by air from airports in Wales is a devolved tax.

(2) Tax may not be charged in accordance with that provision on the carriage of passengers boarding aircraft before the date appointed under subsection (6).

(3) Chapter 4 of Part 1 of The Finance Act 1994 (air passenger duty) is amended as follows.

(4) In section 28(4) (a chargeable passenger is a passenger whose journey begins at an airport in the United Kingdom), for “England, Wales or Northern Ireland” substitute “England or Northern Ireland”.

(5) In section 31(4B) (exception for passengers departing from airports in designated region of the United Kingdom) for “England, Wales or Northern Ireland” substitute “England or Northern Ireland”.

(6) Subsections (3) to (5) have effect in relation to flights beginning on or after such date as the Treasury appoint by regulations made by statutory instrument.’”

This new clause would make air passenger duty a devolved tax in Wales, on the lines of section 17 of the Scotland Act 2016.

New clause 6—Lending for capital expenditure—

“In section 122A(1) and (3) of the Government of Wales Act 2006 (lending for capital expenditure), for ‘£500 million’ substitute ‘£2 billion’.”

Section 122A of the Government of Wales Act 2006 (inserted by section 20(10) of the Wales Act 2014) makes provision for limits on borrowing by the Welsh Ministers for capital expenditure. This new clause changes the limit on the aggregate at any time outstanding from £500 million to £2 billion.

New clause 8—Corporation tax—

“(1) In Part 4A of the Government of Wales Act 2006, after Chapter 4 insert—

‘Chapter 4A

Corporation Tax

116P Corporation tax

A tax charged on trading profits in Wales is a devolved tax.’”

This new clause would make corporation tax a devolved tax.

New clause 9—Trading profits taxable at the Welsh rate—

“After part 8B of the Corporation Tax Act 2010 insert—

“Part 8C

357Y The Welsh rate

‘(1) The Welsh rate of corporation tax for a financial year is—

(a) if a resolution of the National Assembly for Wales—

(i) sets a rate under section 357YA for the year, and

(ii) is passed before the beginning of the year,

the rate set by the resolution;

(b) if the Welsh rate for the year is not determined under paragraph (a), but the Welsh rate for one or more earlier financial years was determined under that paragraph, the rate for the most recent of those earlier years;

(c) otherwise, the main rate.

(2) For the purposes of subsection (1)(a)(ii), a resolution passed before the beginning of a financial year is treated as not having been so passed if it is cancelled by a resolution under section 357YA that is itself passed before the beginning of the year.

357YA Power of National Assembly for Wales to set Welsh rate

(1) The National Assembly for Wales may by resolution set the Welsh rate for one or more financial years specified in the resolution.

(2) The Assembly may by resolution cancel a resolution under subsection (1).

(3) A resolution under this section may not be passed by the National Assembly for Wales except in pursuance of a recommendation which is made by Welsh Ministers and which is signified to the National Assembly for Wales.

(4) This section authorises the setting of a nil rate.

357YB Welsh rate supplementary provision

(1) The Secretary of State must lay draft regulations before the House of Commons and the National Assembly for Wales within twelve months of this Act coming into force.

(2) The Secretary of State must seek the consent of the Treasury before laying draft regulations under this section.

(3) The Secretary of State may make regulations under his section only if both the House of Commons and the National Assembly for Wales have approved those regulations in draft.

(4) Regulations under this section may make any necessary provision, including modifying or amending any enactment, that the Secretary of State or the Treasury considers necessary for the introduction of a Welsh rate of corporation tax.

(5) Regulations under this section may, for example, include—

(a) provision for the application of the Welsh rate of corporation tax to Welsh profits;

(b) provision about the operation of certain reliefs for trading losses that are given against profits;

(c) definitions of “Welsh company”, “qualifying trade”, “small or medium-sized enterprise” and “Welsh employer”;

(d) provision about whether a company has a Welsh regional establishment;

(e) rules for determining whether profits or losses of a trade are “Welsh profits” or “Welsh losses”;

(f) rules applying in the case of a Welsh company that is a small or medium-sized enterprise;

(g) rules applying in the case of a Welsh company that is not a small or medium-sized enterprise;

(h) the treatment of intangible fixed assets in relation to Welsh companies;

(i) provision about R&D expenditure credits and relief for expenditure relating to research and development;

(j) provision about relief for expenditure relating to the remediation of contaminated or derelict land;

(k) provision about film tax relief, television production, video games development and theatrical productions;

(l) provision about profits arising from exploitation of patents etc.;

(m) rules for determining whether profits or losses of a trade are “Welsh profits” or “Welsh losses” in the case of a company that is a partner in a Welsh firm;

(n) definitions of “excluded trade” and “excluded activity” (profits of which are not Welsh profits); and

(o) provision about the meaning of “back-office activities” (profits imputed to which may be Welsh profits).’”

This new clause mirrors the approach of the Corporation Tax (Northern Ireland) Act 2015 in defining a Welsh rate of corporation tax, but leaves the details to be set out in secondary legislation.

Guto Bebb Portrait Guto Bebb
- Hansard - -

It is a pleasure to serve under your chairmanship this evening, Sir Alan.

Clause 22, alongside detailed technical provisions in part 2 of schedule 5, devolves onshore petroleum licensing in Wales to Welsh Ministers, fulfilling the St David’s Day commitment. Clause 23 is necessary to facilitate a smooth transfer of existing onshore licences. Clause 24 transfers to Welsh Ministers the regulation-making powers in the Infrastructure Act 2015 with respect to the right to use deep-level land below 300 metres for the purpose of exploiting onshore petroleum.

The St David’s day agreement stated that responsibility for speed limits in Wales should be devolved. It also committed the Government to consider the Smith agreement, to determine which recommendations for Scotland should also apply to Wales. As a result of this work, powers over traffic signs, including pedestrian crossings, will also be devolved. Clause 25 and section E1 of schedule 1 devolve these powers by reserving only powers relating to the exemption of vehicles from speed limits and certain traffic signs—for example, emergency vehicles attending incidents.

Together, the clause and the schedule have the effect of devolving to the Assembly and Welsh Ministers legislative and executive competence in respect of substantially all the provisions of the Road Traffic Regulation Act 1984 that concern speed limits and traffic signs. This means the Assembly will be able to legislate in respect of substantially all aspects of speed limits and traffic signs on all roads in Wales.

Clause 26 fulfils a St David’s day commitment and implements a Silk commission recommendation to devolve the registration of local bus services, including the relevant functions of the traffic commissioner. Devolution of bus registration is achieved by the matter not being listed as a reserved matter in schedule 7A. Clause 26 gives effect to the devolution of the relevant traffic commissioner functions to Welsh Ministers. Clause 27 also fulfils a St David’s day commitment and a Silk commission recommendation by devolving the regulation of taxi and private hire vehicle services in Wales to Welsh Ministers.

This complements the devolution of legislative competence to the Assembly for taxi and private hire vehicle licensing in new schedule 7A. Taxi and PHV services are currently licensed by local authorities under legislation that covers England and Wales outside London. Local licensing authorities set their own policies and standards. I therefore support these clauses standing part of the Bill.

Paul Flynn Portrait Paul Flynn
- Hansard - - - Excerpts

These considerable and weighty clauses will bring significant benefits to the people of Wales. We are grateful for the improvements that have taken place as a result of the Government accepting the criticisms made of the draft Bill. Real progress is being made.

The main issues I wish to raise with this group of amendments involve energy, because there is a great opportunity for Wales to become a powerhouse for energy for the whole United Kingdom. For too long, we have neglected the vast energy of the tide that sweeps around the Welsh coast at different times of the day, providing pulses of energy that could be coupled with demand-responsive schemes such as pumped storage schemes in order to give completely demand-responsive electricity not only cleanly, but by providing renewable power in an entirely predictable way—the tide will always come in.

We have made huge strides in Wales on hydro schemes in Rheidol, Ffestiniog and Dinorwig. The possibility of using the topography of Wales to produce energy has been long neglected. When we look at the problems of the Port Talbot steelworks, we need to realise that washing along the shore of those steelworks is the highest rise and fall of tide in the world. They are in trouble because their energy is so expensive, yet a source of energy is available on their doorstep—free, British, eternal and absolutely predictable.

Amendments 130 to 132 deal with renewable energy schemes. These Welsh Government amendments would create a duty on the Secretary of State to consult Welsh Ministers before establishing or amending a renewable energy incentive scheme in Wales. As drafted, the clause excludes the requirement for the Secretary of State to consult in relation to the creation of a levy to fund an incentive scheme.

The obligation merely to consult is insufficient in respect of this important matter. The Energy Act 2013 provides that the Secretary of State must consult Welsh Ministers before making regulations in relation to contracts for difference. This is a fairly fresh concept, but it has been used widely by this Government and the previous one. Interested parties should also be consulted before a renewables obligation closure order is issued. When the UK Government announced the early closure of the renewables obligation scheme for onshore wind in 2015, there was no prior consultation with Welsh Ministers. We therefore think it essential that, as part of establishing an appropriate devolution settlement for energy, the requirement is put on a firmer and clearer footing. The amendment therefore provides that the Welsh Ministers’ agreement must be sought in relation to renewable energy incentive schemes in Wales either proposed or, in the case of existing schemes, proposed for amendment.

We further propose the omission of clause 46(3), which inappropriately limits the scope of the responsibility of the Secretary of State to engage constructively with Welsh Ministers. We see no reason, and none is offered in the explanatory notes accompanying the Bill, why that engagement should not extend to the consideration of matters relating to levies to fund renewable energy incentive schemes.

Amendments 144 and 147 relate to clause 51. Clause 51 provides the Secretary of State with order-making powers to make consequential provision following the enactment of the Wales Bill. This includes powers to amend, repeal, revoke or otherwise modify primary or secondary legislation as he considers appropriate. Affirmative procedure in both Houses is provided for where the amendment or repeal of primary legislation is envisaged in any such order. There is, however, no provision for Assembly approval of a draft order that would repeal or modify Assembly legislation. Furthermore, as the Bill is drafted, the Secretary of State could propose orders making modifications to the Acts of Parliament underpinning the Welsh devolution settlement without requiring the Assembly’s consent, although parliamentary consent would be needed. Even if such modifications were contained in a parliamentary Bill, the Assembly’s consent would be required. This is wrong in principle. If the Secretary of State wishes to take powers by order to make amendments, up to and including repeal, to Assembly legislation, that should be possible only with the consent of the Assembly itself. If orders are proposed that would make changes to the parliamentary legislation establishing the Welsh devolution settlement, they, too, should require Assembly consent before they can be made. The Welsh Government amendments would give effect to those important principles.

I welcome the agreement in this House across all parties. Plaid Cymru introduced a slightly tribal note by attacking Labour for not going to the same lengths that it has gone to in some of its amendments, but I think Labour has taken a pragmatic view. Where the Government made it clear they are not going to change their minds, we have tried to introduce amendments that are halfway between the Opposition and Government positions, and which might be acceptable to the Government. It should not be concluded from that that we have shown any lack of enthusiasm for the process of devolution.

Plaid Cymru’s amendment 74 relates to energy limits. The Welsh Government would have no powers over schemes above 350 MW. That is a very low level. It would include the tidal lagoon in the constituency of my hon. Friend the Member for Swansea East (Carolyn Harris), but it would not include the two tidal lagoons planned for either side—the Cardiff side and the Newport side—of the River Usk. The two schemes have enormous possibilities to produce huge amounts of electricity, particularly if they are linked with pumped storage schemes in the valleys. If the pulse of electricity comes in the early hours of the morning when it is not required, the energy can be used to pump the water up to the adjacent hills very close to the shore in Newport, and then drawn down to produce electricity throughout the day. This is a form of energy production that we have long, long neglected. We have ignored the power of the tide and we have used other, polluting forms of energy.

--- Later in debate ---
This Bill has within it the movement of power over onshore wind to the National Assembly, a change that has already happened through the Energy Act 2016. The part of this Bill that I am more interested in, and the detail I shall want to return to, is any powers we give the Welsh Government as a consultee to influence the subsidising process. That is where I disagreed fundamentally with the shadow Secretary of State, as he seemed to be suggesting that we give the Welsh Government power over that aspect of onshore wind as well. If that were part of this Bill, for me, representing my constituency and facing a Government in Cardiff who wanted to do it great damage, the Bill would be difficult to support.
Guto Bebb Portrait Guto Bebb
- Hansard - -

We have had a decent debate about the issues relating to this group of amendments. Clause 36 is a carefully drafted clause, which, again, gives effect to the St David’s day commitment on energy consenting. The combined effect of subsections (1) to (6) is to disapply the Secretary of State’s power under the Planning Act 2008 to grant development consent for electricity generating stations in Wales and in the Welsh inshore and offshore zones, not exceeding a capacity of 350MW. This is a compromise, but one based on the views expressed by Silk and the St David’s day agreement, which was attempting to reach a consensus. Development consenting for all onshore wind-powered generating stations in Wales has already been devolved through the Energy Act 2016, and I shall say more about that in a moment in relation to some of the amendments put forward by Conservative Members.

Amendments 74 to 80 were tabled by the hon. Member for Arfon (Hywel Williams), and they again seek to reopen the issue of the political consensus we found under Silk and as part of the St David’s day process. It is important that we recognise that the Bill is attempting to move forward on the basis of consensus, whereas the amendments are trying to open up the whole issue once more. Clearly, we have to accept that the electricity transmission system in England and Wales is thoroughly integrated, and we must keep that in mind when we legislate on this issue. It is also important to highlight that the consensus on the 350MW figure is appropriate, given that we are dealing with a system that is interrelated and interdependent. It is moving significant changes and decision-making powers to Wales, but it is also recognising the importance of what might be seen as a strategic energy development. One of more than 350MW is considered to be strategic, whereas one of less than that can be done on a Welsh basis.

We have rightly talked a lot about hydroelectric generation in this debate. I am proud that my constituency has several sites that are open to development for hydro energy production. A 350MW rule would imply that all those developments could be decided upon in Wales, which is a major development. The biggest challenge we would have would be ensuring that the electricity infrastructure to take energy out of the Conwy valley was up to speed.

Hywel Williams Portrait Hywel Williams
- Hansard - - - Excerpts

Perhaps this is a mischievous point, but may I ask the Minister this: if 350MW and over is “strategic”, was 50MW and over strategic in the past? If so, what has changed?

Guto Bebb Portrait Guto Bebb
- Hansard - -

It should be stated that a former Secretary of State for Wales and former leader of this party had long argued that there was a need to look at a higher limit. It is fair to say that the process of devolution is an ongoing one, and it is highly unreasonable to criticise the fact that we are moving towards a situation where very large developments of hydro power in north Wales could be decided upon in Cardiff.

Paul Flynn Portrait Paul Flynn
- Hansard - - - Excerpts

As the process is ongoing, do we not have a responsibility to catch up with information that was not available to the Silk commission? I do not think that the Newport barrage and Cardiff barrage were envisaged at that time. How does it make sense for the Welsh Government to have control over the Swansea lagoon, but not over the Newport and Cardiff lagoons?

Guto Bebb Portrait Guto Bebb
- Hansard - -

I am very sympathetic to the concept of tidal lagoons, but, as the hon. Gentleman will be aware, a review is being undertaken at this time and I would not want to prejudge it. It is being undertaken by Charles Hendry, who is well respected across this House.

Clause 37 allows Welsh Ministers to make declarations extinguishing public rights of navigation, so as to ensure safety out to the seaward limits of the territorial sea in relation to generating stations up to 350MW. Clause 38 aligns, in a single authority, the ability to consent both to a generating station itself and the associated overhead line which would connect that station to the transmission system. It does so by removing consenting applicable requirements under either the Electricity Act 1989 or the Planning Act 2008 for certain associated overhead lines with a transmission capacity of up to 132kV necessary for connecting generating stations of up to 350MW capacity. This is an attempt to generate a one-stop shop for energy opportunities of that size in Wales. The Silk commission rightly identified that a one-stop shop should be developed, and the Bill tries to deliver that in a Welsh context.

Government amendments 47 to 49 correct an inadvertent constraint in the current drafting of clause 38 by removing the presumption that Welsh Ministers are the devolved consenting authority.

On clause 39, the Planning Act 2008 introduced the concept of “associated development”—development that the Secretary of State could consent to as part of the development consent orders which underpin and facilitate major development projects. The ability to grant associated development allows for more of the complete projects to be delivered within a single consent, to try to make the situation easier for developers. In Wales, the benefit of this approach has hitherto been restricted only to certain activities around the construction of underground gas storage facilities. Clause 39 amends relevant definitions in the Planning Act 2008 to extend the scope of associated development in Wales to include activities accompanying generating projects above 350 MW and larger overhead lines connections of 132 kV. Again, it fulfils a St David’s day commitment and implements a Silk commission recommendation.

I think it is fair to say that amendments 158 to 160, tabled by my hon. Friend the Member for Brecon and Radnorshire (Chris Davies), seek to re-open matters which have already been debated in the context of the Energy Act 2016. That Act delivered the Government’s manifesto commitment to give local people the final say on wind farm applications. It also ensured that in Wales it is for the Assembly and Welsh Ministers to decide how decisions are taken. I see no basis for rowing back from that position now, but I agree wholeheartedly with my hon. Friend that the Welsh Government should ensure that local people in Wales have the final say on these matters.

In our discussion of the Bill, we have talked about the importance of financial accountability, but this is also a case of political accountability. In my constituency, Aberconwy, we had the development of the Gwynt y Môr wind farm. I think I am right in saying that every single councillor in the Conwy local authority area voted against the development, but it was imposed by diktat by the then Energy Secretary. The important point is that the changes and the power given to local communities as a result of Acts passed by the coalition Government were a direct response to that political need for change. If the Assembly Government are guilty of taking powers into their own hands, there is political accountability there which needs to be challenged and needs to be part of the political discourse in Wales.

The Energy Act has ended subsidy for new onshore wind. If an onshore wind project does not already have planning permission, it is not going to be eligible for subsidy under the renewables obligation. In all the circumstances, therefore, the amendment should not be pressed to a vote.

Clauses 40 and 41 devolve further powers to Welsh Ministers in respect of equal opportunities. The powers follow as closely as possible the approach adopted in Scotland, but the two approaches are not identical. Clause 40 covers the operation of the public sector equalities duty. It removes the requirement in section 152 of the Equality Act 2010 that the Welsh Ministers consult a Minister of the Crown prior to making an order amending the list of Welsh public authorities that are subject to the duty, replacing it with a requirement to inform.

Clause 41 provides for the commencement and implementation of part 1 of the Equality Act 2010 in Wales. Part 1 imposes a duty on certain public bodies to have due regard to socio-economic considerations when making strategic decisions. Clause 41 allows the Welsh Ministers to bring part 1 into force in Wales on a date of their choosing. It also enables Welsh Ministers to amend the 2010 Act to add or remove relevant authorities that are to be subject to the duty, without first consulting a Minister of the Crown.

Clauses 42 and 43 extend Welsh Ministers’ existing responsibilities for marine licensing and marine conservation in the Welsh inshore region to the Welsh offshore region. The clauses fulfil St David’s day commitments and implement recommendations in the Silk commission’s second report.

Clause 44 enables the Secretary of State to intervene on legislation or Executive activities where she has reasonable grounds to believe that these might have a serious adverse impact on sewerage in England. As part of this Bill, legislative competence for sewerage will be devolved, subject to the matters set out in C15 of new schedule 7A. These powers of intervention are similar to those already held by the Secretary of State in relation to water. They may be used where an Act of the Assembly, or the exercise, or failure to exercise, a relevant function might have a serious adverse impact on sewerage services and systems in England.

Amendments 81,125 and 126, tabled by the hon. Member for Arfon, seek to take forward the recommendations of the Silk commission in relation to water and sewerage. The Silk report recognised that water and sewerage devolution is complex and that further work to consider the practical implications was needed. The Government set up the Joint Governments Programme Board with the Welsh Government to look at these issues and report on the likely effects that implementing the commission’s recommendations would have on the efficient delivery of water and sewerage services, consumers and the water undertakers themselves. As my right hon. Friend the Secretary of State explained earlier, that work has concluded and the Government are considering the evidence before deciding whether and how the recommendations will be taken forward. We will consider carefully the interests of customers and businesses on both sides of the border before reaching that decision. It should be stressed that this issue is under consideration.

Liz Saville Roberts Portrait Liz Saville Roberts
- Hansard - - - Excerpts

Will this material be available when we are next discussing the Bill? If I remember correctly, I first heard about that working group when we were discussing the 50 years since Capel Celyn. As we are now nine months down the road, it would be appropriate for it to be reported to the House before the Bill comes to the end of its journey.

Guto Bebb Portrait Guto Bebb
- Hansard - -

I thank the hon. Lady for her question. Her recollection is correct. We have only just received the report, so consideration of it must now take place. It is now with the Wales Office, and, after it has been considered, we will, in the manner described by my right hon. Friend the Secretary of State, discuss the contents of the report with other parties who have an interest in the Wales Bill.

Clause 45 fulfils a St David’s day commitment and a Silk commission recommendation to devolve to Welsh Ministers the power to make building regulations for “excepted energy buildings” such as generating stations and gas storage facilities. Clause 46 formalises the current differing arrangements for consulting the Welsh Ministers on renewable energy incentive schemes.

Amendments 130 to 132, which were submitted by the Opposition, would require the Secretary of State to gain the consent of Welsh Ministers, rather than to consult them. Energy policy is a reserved matter as regards Great Britain. Maintaining consistency provides for workable schemes, certainty to the industry and fairness to consumers. It is right that responsibility for renewable energy incentive schemes should rest with UK Ministers. I hope that that comment has been welcomed by my hon. Friend the Member for Montgomeryshire (Glyn Davies).

Clause 47 implements for Wales the conclusions of the HM Treasury review of the Office for Budget Responsibility, published last year. The OBR has a statutory duty to carry out a number of core functions, including to produce fiscal and economic forecasts. This clause ensures that it will continue to receive information from Wales as necessary to fulfil that duty. It reflects the increased fiscal devolution to the Assembly, and the Welsh Government’s competence for economic development. These roles mean that the OBR is more likely to require and use information held in Wales to fulfil its remit.

Clause 48 increases the accountability of Ofgem to the Assembly. Clause 49 provides that where a coal operator wants to mine in Wales, it must seek the approval of Welsh Ministers as part of its application for a licence. Clause 50 increases the accountability of Ofcom to the Assembly and Welsh Ministers. It goes further by giving Welsh Ministers the power to appoint one member to the Ofcom board who is capable of representing the interests of Wales.

Clauses 51 and 52 and schedule 5 and 6 make consequential and transitional provision relating to the Bill. Clause 51 allows the Secretary of State to make consequential amendments by regulations in connection with this Bill, and through amendments 82, 144 to 147 and 150 to 154, the Opposition parties are seeking to give the Assembly a role in approving those regulations. Amendments 144 to 147 would require the Assembly also to approve those regulations where such consequential amendments are within the Assembly’s competence or where they alter the Assembly’s competence. Amendments 82 and 150 to 154 would achieve the same with regard to consequential amendments that amend Acts or measures of the Assembly or secondary legislation made by the Welsh Ministers.

Clause 51 is a fairly typical consequential provision that ensures that the Government are able to tidy up the statute book where required in connection with this Bill. Indeed, similar provisions are included in Assembly legislation as well. Giving the Assembly a role in approving the Secretary of State’s regulations made under this clause would be as unjustified as giving Parliament a role in approving Welsh Ministers’ regulations made under Assembly Acts. It would also make the process far more complicated and time consuming than it needs to be. In reality, we would discuss any proposed changes that impacted on the Assembly’s competence with the Welsh Government before regulations were laid.