High Speed Rail (Crewe - Manchester) Bill: Committal Debate

Full Debate: Read Full Debate
Department: Department for Transport

High Speed Rail (Crewe - Manchester) Bill: Committal

Baroness Laing of Elderslie Excerpts
Committal (to a Select Committee)
Monday 20th June 2022

(2 years, 5 months ago)

Commons Chamber
Read Full debate High Speed Rail (Crewe - Manchester) Bill 2021-22 View all High Speed Rail (Crewe - Manchester) Bill 2021-22 Debates Read Hansard Text Read Debate Ministerial Extracts
Yvonne Fovargue Portrait Yvonne Fovargue (Makerfield) (Lab)
- Hansard - - - Excerpts

My manuscript amendments seek to extend the discussion on the Golborne spur and to allow petitions relating to this link to be heard by the Committee, as I do not believe the full facts have been taken into account by the premature and ill-informed decision to remove the link and to explore alternatives that deliver similar, although I would say inferior, benefits within the £96 billion envelope of the Government’s integrated rail plan.

HS2 phase 2b, Crewe to Manchester, including the Golborne link, will cost £17 billion at 2019 prices. The proposed removal of the Golborne link is expected to reduce costs by approximately £3 billion. The Government committed to publish a supplement to the January 2022 strategic outline business case for HS2 phase 2b to set out the implications of removing the Golborne link ahead of the Second Reading, but that has only just been published. How can a reasonable decision be made without full and costed alternatives that allow time for full consideration of the implications for all, especially those in my borough of Wigan? It does state that it will deliver benefits sooner to Manchester and the north-west, but it is pretty difficult to see the benefits that will be delivered to Wigan, and to Lancashire and Cumbria.

The January 2014 update to the business case for HS2 included a

“without link to the West Coast Mainline”

sensitivity test, which showed a benefit-cost ratio of 0.7, which equates to gaining £7 billion of benefits from spending £10 billion. The benefit-cost ratio with the Golborne rink is 1.2. It is difficult to understand how the Golborne link can be considered a “white elephant” and its removal a

“worthwhile saving of taxpayers’ money”

on that basis. The environmental statement included an alternatives report, which considered a wide range of alternatives for the western leg of HS2 phase 2b, before arriving at a shortlist and then a clear preference for the Golborne link as part of HS2 phase 2b.

One alternative that was considered, and is clearly now back on the table, is the upgrade of the west coast main line north of Crewe. Parts of the west coast main line between Crewe and Wigan are heavily congested, notably the section between Winsford and Weaver in Cheshire, including the Weaver junction. That section is twin track for the majority of its length and is used by long-distance services between Scotland, Liverpool and London, inter-regional services between Liverpool and Birmingham, and freight services. It is already constraining service improvement. This alternative option would include partial four-tracking of the Weaver junction, the provision of an alternative freight route via Sandbach and substantial grade separation between Crewe and Preston. Upgrading the west coast main line was found to deliver faster journey times compared with the existing situation. However, they do not match the journey time benefits provided by the Golborne link, which would deliver substantially faster journey times between cities in the north and the midlands, as is set out on page 20 of the alternatives report.

Both the upgrade of the west coast main line and the Golborne link were found to create extra capacity on the national conventional rail network for other services. However, only the Golborne link would create extra capacity for potential high-speed services north of Birmingham, and would therefore better meet the Government’s strategic objectives for HS2. So without the Golborne link there is a fundamental concern that provision for additional high-speed services north of Birmingham would be to the detriment of local and regional services, and freight services, which would need to be removed or reduced, or at the very least would remain constrained against their potential for growth, including in response to any carbon reduction challenges. This alternative option would also result in years of significant disruption to passengers and freight on the west coast main line compared with building a new railway. The Government have suggested that a solution could be delivered more quickly than the Golborne link, but we have not got any evidence for that. Given that they have made similar claims in removing the eastern leg of HS2 and in downgrading Northern Powerhouse Rail, in preference to upgrading existing lines, there is not enough capacity in the industry to do all of this work, and there is also the time constraint in working around live railways to consider. Even if there was, it is not possible to close different routes at the same time to facilitate the work without causing widespread disruption. Instead, it is highly likely to take much longer than building a new railway.

This alternative option would also be more expensive than the Golborne link, as the works needed between Crewe and Wigan would be of a similar scale to those needed between Wigan and Preston to accommodate the high-speed trains. That is likely to cost in the region of £5 billion to 10 billion—and that is the estimate from Network Rail. On that basis, the cost of upgrading the west coast main line between Crewe and Wigan will exceed the £3 billion needed for the Golborne link by around £7 million.

It is pertinent for the Wigan borough that the loss of the Golborne link will be to the detriment of the service provision at the proposed new rail station at Golborne, which is on the west coast main line south of the proposed junction with HS2. Significant capacity enhancements to the west coast main line between Warrington and Wigan, particularly around the junction with the Chat Moss line, would be needed if that station was to be served by the stopping trains without disrupting the high-speed through services. In the absence of the Golborne link, they will all pass through that location.

The report also considered a connection to the west coast main line north of Preston, near Brock. It would be 46 km in length as an extension to the Golborne link north of Lowton. It would pass close to a number of communities, including Hindley and Ince-in-Makerfield, as well as numerous other communities in Lancashire, and would require an elevated crossing of the River Ribble and a new parkway station west of Preston. That would clearly mean additional noise and visual and landscape impacts that would all need to be mitigated. A further 63 demolitions would be needed, it would impact the setting of up to three scheduled monuments and up to six grade II listed buildings, and it would impact on two ancient woodlands.

Preston City Council did not support the need for a new parkway station on the outskirts of Preston, instead favouring investment in the regeneration of the existing city centre station. Although such a connection would deliver journey-time improvements between London and Glasgow, it was considered that the benefits gained from the journey-time savings and new markets did not outweigh the substantial costs and additional sustainability impacts. It was therefore determined that this alternative option did not deliver sufficient economic or journey-time benefits to offset the higher costs, sustainability impacts and lower regional connectivity.

Option 3 was a new connection to the south of Preston, on the basis that it would have the potential to deliver more benefits and reduce journey times by two to three minutes more than the Golborne link. As with the connection north of Preston, this would be an extension to the Golborne link north of Lowton. The alternatives report explored the recommendation in detail and determined that various connections to the west coast main line south of Preston performed less favourably in terms of construction complexity, sustainability and journey time when compared with the options connecting to the north of Preston. That was despite a shorter length of track.

There is a clear contradiction between the Union connectivity review and the alternatives report. A connection to the west coast main line south of Preston may deliver greater benefits than the Golborne link, but the feasibility of such a connection has been examined by HS2 across a number of locations and been deemed unsuitable for progression in favour of other options. It should be noted that any connection to the west coast main line south of Preston would in effect extend the Golborne link and cost significantly more than the link’s £3 billion cost. It is also highly likely to cost more than the works that would otherwise be needed to accommodate high-speed trains on the west coast main line between Wigan and Preston, which Network Rail has advised would cost in the region of £5 billion to £10 billion.

There is another option. If Government chose to extend HS2 northwards, which currently seems unlikely, the council would want to retain the Golborne link connection to Wigan to avoid the borough being bypassed by HS2. This would need a junction with the extended route north of Lowton and the retention of that part of the Golborne link from that point to the west coast main line at Bamfurlong, which is a short length of around 3 km. The remainder of the Golborne link would be part of a longer link regardless. [Interruption.]

Baroness Laing of Elderslie Portrait Madam Deputy Speaker (Dame Eleanor Laing)
- Hansard - -

Order. The hon. Lady is making a serious speech. There are people sitting in this Chamber who are not whispering to one another but speaking as if they are in a normal evening conversation. If you are in the Chamber and someone else is speaking, it is polite to speak quietly to one another. I am not suggesting that there should be no conversations going on, but I should not be able to hear those conversations from the Chair.

Yvonne Fovargue Portrait Yvonne Fovargue
- Hansard - - - Excerpts

This is an important factor for Wigan, for my borough and for the people who live in my borough. It is important that we get HS2 right so that we get the economic benefits for all the north-west. In any such connection, the council would seek to progress the items that have been identified for petitioning on the Golborne link, to mitigate the adverse impacts of the proposals on local communities, including the proposal for a green tunnel at Lowton.

The Golborne link would free up capacity on the west coast main line for residual passenger services and rail freight and maximise the time that services can travel at high speed between London, Birmingham and Scotland, minimising end-to-end journey times. The significance of that is set out in the January 2022 update to the HS2 Phase 2b business case, which is explicit about the role of the Golborne link in unlocking capacity and services to Scotland. As the hon. Member for Paisley and Renfrewshire North (Gavin Newlands) mentioned, this is important for Scotland, not just for Wigan.

The Golborne link also gives rise to the opportunity to connect to the Manchester spur and bring significantly improved journey times to Manchester airport and Manchester Piccadilly, avoiding the congested Castlefield corridor in central Manchester—from Wigan, the north-west and Scotland. Our services to Manchester Oxford Road are always under threat in Wigan. We have very poor transport links, and we will not even get a tram until 2040, so it is important that HS2 provides actual benefits for my borough.

At £3 billion, the Golborne spur is clearly cost-effective compared with the option of upgrading the west coast main line, and it could be delivered more quickly, with minimal disruption to passengers and freight on the existing rail network.

--- Later in debate ---
Graham Stringer Portrait Graham Stringer
- Hansard - - - Excerpts

I said there has not been enough debate. We have just had the Second Reading of the Crewe to Manchester hybrid Bill. There has been a great deal of debate all over the north-west about the link, particularly in Wigan and Leigh, but I was referring to debate in this Chamber, where it should be taking place and where, in the future, it will not be allowed because it is not part of the hybrid Bill.

It may or may not be coincidence that the decision was made. Other people from different political parties may agree with the hon. Member for Leigh, but if the Prime Minister wanted votes from the parliamentary Conservative party, he would not go to Wigan Council looking for those votes; he would go to his own Back-Benchers.

The second reason not to do with the Prime Minister is that this is simply about cuts. We saw £3 billion appear, and my hon. Friend the Member for Makerfield made a persuasive argument that there is no cheaper option but only more expensive options. So, when they have spent time on this project from the very beginning, are the Government looking at ways of cutting it? Leeds and Yorkshire have lost out. Parts of the east-west link have gone. It looks to me as though, if it is not about votes for the Prime Minister, it is about cuts. I cannot see any real alternative explanation.

That brings me to an overall point that was also referred to by my hon. Friend. If one goes back 40 years to when this country first started looking at high-speed rail—I was a Manchester politician then, leader of the council, not a Member of Parliament—we were promised high-speed rail coming into Manchester Piccadilly when the cross-channel link was made, but it was cut. The trains were bought for that route. They used to say in French—

Baroness Laing of Elderslie Portrait Madam Deputy Speaker (Dame Eleanor Laing)
- Hansard - -

Order. I hope that the hon. Gentleman is not speaking widely about the general concept, because we are not on the Second Reading debate now; we are very specifically debating motions 4, 5, 6, 7 and 8. I have allowed him to range quite widely. However, I hope that he is not going to range too far as he should be speaking specifically to these motions, not making a Second Reading speech.

Graham Stringer Portrait Graham Stringer
- Hansard - - - Excerpts

I am grateful for your advice, Madam Deputy Speaker. I will now finish in two or three sentences. I was trying to make the point, while not extending the debate too widely, that over a long period there have been cuts to the original high-speed link and to this high-speed proposal that a Labour Government originally decided to take forward in 2010. We have had a long history of cuts. I think the most objective view of what is before us is that it is not a chance to look at an alternative, because there is no such chance within the hybrid Bill; it is another cut in a series that has gone on for a long time.