Oral Answers to Questions Debate

Full Debate: Read Full Debate
Department: Ministry of Defence

Oral Answers to Questions

David Mowat Excerpts
Monday 13th December 2010

(13 years, 11 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Lord Robathan Portrait Mr Robathan
- Hansard - - - Excerpts

I recently took a passing-out parade at Bassingbourn, and I was struck by how happy all the young recruits under training appeared to be. We take our duty of care very seriously. It is a tough environment, but the recruits are well looked after, and most of the young people I met were desperate to join their units. We do not allow people under 18 to go to operational theatre as a matter of policy.

David Mowat Portrait David Mowat (Warrington South) (Con)
- Hansard - -

8. What assessment he has made of the value-for-money of the contract to build two new aircraft carriers for the Royal Navy.

Peter Luff Portrait The Parliamentary Under-Secretary of State for Defence (Peter Luff)
- Hansard - - - Excerpts

The strategic defence and security review concluded that a carrier strike capability was needed for the future. The most cost-effective way of delivering that capability from around 2020 is to continue building both the Queen Elizabeth class aircraft carriers, fitting the operational carrier with catapults and arrestor gear to enable the use of the more capable carrier variant of the joint strike fighter.

David Mowat Portrait David Mowat
- Hansard - -

I thank the Minister for that reply. Does he agree that it cannot have been right on the eve of a general election, weeks before we reached the certainty of the strategic defence review, for a large UK supplier to enter into a contract with the Government? It was very difficult to break, so it effectively prejudged the result of the defence review. Is the Minister happy that BAE Systems acted in good faith in this matter?

Peter Luff Portrait Peter Luff
- Hansard - - - Excerpts

Cancellation costs are a very complex area. The contract for the aircraft carriers was related to the programme of work, agreed by the previous Government under the so-called terms of business agreement, to sustain the ability to design and integrate complex warships in the UK. Over the next few years, the QE class is providing that work load, with a Type 26 global combat ship taking over later in the decade. If we were to cancel the contracts for the QE class under TOBA we would need to provide replacement work, which would come at a cost, compounding the inevitable costs of cancelling the QE class ships, one of which is already well under construction. This brings us to the position so clearly outlined by the Prime Minister in the SDSR announcement. I would not point the finger of blame so much at BAE Systems as at my predecessor, who acquiesced in the delay of the carrier contract, which led to £767 million of increased costs in the last financial year alone, and a total of £1.56 billion over the life of the programme, making his peerage just about the most expensive in British political history.