(1 year, 4 months ago)
Commons ChamberUrgent Questions are proposed each morning by backbench MPs, and up to two may be selected each day by the Speaker. Chosen Urgent Questions are announced 30 minutes before Parliament sits each day.
Each Urgent Question requires a Government Minister to give a response on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
I think I see the Beatles analogy, because there is a ticket to ride process—[Interruption.] Okay, that was it. That process is available to anybody who wishes to pay cash. For example, if my hon. Friend looks at the Northern Trains website, he will see that there is a whole feature explaining how cash can still be used. The machines should take cash. In the event that they do not, there is a process for passengers to purchase a ticket on the train without fear of a penalty. So yes, cash can still be used in the machines.
The Minister is clearly on Southeastern time. That is why he was late getting the analogy. He said that just 10% of tickets are sold over the counter, but that does not explain who are using the ticket offices and what alternative arrangements he is going to make for them. Southeastern has announced 40 ticket office closures, 35 of which are in south-east London—that is 35 in south-east London. That is an outrage. One in my constituency has closed, but all the ones around my constituency are closing as well. What will he do to ensure that these people not only keep their jobs once they are moved out from behind the glass, but are not moved from being redeployed to redundancy? And what will he do about the 10% who rely on ticket offices?
(1 year, 8 months ago)
Commons ChamberThere is great oversight of the figures. It relates to the question asked by my right hon. Friend the Member for South Northamptonshire (Dame Andrea Leadsom). A report is put out every six months to show the transparency and we do bear down on costs. With regard to the matter mentioned by the hon. Member, I have been to Manchester and heard about the issues there. The problem is that the current two depots are on one side; it would actually make more sense, when the line is built, for them to be on either side. I know that officials from HS2 and the Department for Transport are in discussions with the team in Greater Manchester. The matter is before the Bill Committee, so it would not be appropriate for me to go into further detail.
Southeastern’s new timetable was designed to improve resilience. The operator faced some initial challenges introducing the new timetable, so established a joint taskforce with Network Rail to identify and resolve issues. Changes have already been made, including adding services and carriages where required and we are already seeing an improvement. The taskforce will continue to monitor performance and make changes as required.
I am grateful for the Minister’s answer and for his letter of the 28th of last month, but, as he will know, that very evening, there was yet another dangerous incident at London Bridge due to overcrowding. On 7 February, I was on a train which, due to delayed trains, was so overcrowded that someone fainted in my carriage. The system has been cut back to the point where there is no slack in it. Whenever there is a delay, there is dangerous overcrowding. The Minister has to address that before something serious happens to an individual. We were told that there would be no delays when the new system was brought in, because it would be so efficient that we would not have any of that congestion, but it has been worse. The Minister has to face up to that. He gave Southeastern permission to do that. We need to change the timetable.
The hon. Member will be receiving another letter from me this morning, because I have always said that I would listen, as did the Secretary of State, and that we would try to make improvements as the case was demonstrated. I want to thank my right hon. Friend the Member for Bexleyheath and Crayford (Sir David Evennett) and my hon. Friend the Member for Old Bexley and Sidcup (Mr French), who have met me and the Secretary of State to make the case for their constituents. I can confirm that we have agreed to the reinstatement of a direct off-peak service to Charing Cross on the Bexleyheath line, which will run hourly, Monday to Saturday. This service will be in addition to the current timetable, meaning a total of 309 services will operate each week direct to and from Charing Cross on this line. I hope the hon. Member will welcome that good news.
(1 year, 11 months ago)
Westminster HallWestminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.
Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
It is a pleasure to serve under your chairship, Ms Harris. I thank the hon. Member for Eltham (Clive Efford) for securing this important debate on Southeastern’s rail timetable changes, and I thank all right hon. and hon. Members who have spoken. I have always been a south-eastern MP. Over the past seven years, I have shared debates with many Members or their predecessors in Westminster Hall, the main Chamber and, indeed, meetings on Southeastern. I declare that as an interest, but I have always enjoyed working with south-eastern MPs.
I will do my best to cover the rationale for these changes and to explain the positives and negatives. I will explain the positive changes, although sadly there are no Members present from the constituencies where those changes will take place. I will certainly talk more about the consultation—or lack of one, as Members have pointed out. I will write to all Members who have contributed, so if I have not answered their points directly, I will ensure that we do so via correspondence.
I have met many Members, including my right hon. Friend the Member for Bexleyheath and Crayford (Sir David Evennett), and they have made their points with force. I appreciate what they said because I empathise with colleagues and their constituents who believe that the changes will negatively impact them. With any timetable change, some will feel that they are losing out. There is ultimately no way of making changes that will please everyone who uses the railway, but the changes are necessary, and I hope to highlight some of the reasons behind it.
The changes are driven by our current financial and travel habit situation. Travel habits have changed and there is a need to make our railways more financially sustainable, as well as improving their reliability. That has been the starting point. Within that framework, the team has worked hard to ensure that we will build a more resilient and reliable timetable through the process; again, I will talk more about that. The benefits of resilience and reliability will be there for all who use Southeastern, and we must look at the network as a whole. We must acknowledge that the pandemic has caused changes in travel habits, with many people who can adopting a hybrid approach, working from home some days of the week and/or travelling at different times of the day to avoid peak times. The new timetable needs to reflect that.
The changes in travel habits, alongside the successful introduction of Elizabeth line services, mean that all-day weekday demand on Southeastern services is around 70% of pre-covid levels. That figure drops to between 50% and 65% during peak periods. Demand simply does not warrant 2019 levels of service provision. The Government have earmarked £16 billion of funding for rail services since the start of the pandemic. That is taxpayers’ money and is clearly unsustainable in the long term, so the Department has asked all operators, not just Southeastern, to develop timetables that are appropriate to customer demand and that deliver good value for the taxpayer while prioritising the punctual services that customers rightly demand.
Can I go on a little further? I will touch on the three key reasons why Southeastern has changed its timetable and then I will give way. The first reason is efficiency and the post-covid rail situation. The timetable reduces train mileage to better match capacity to demand and changes the underlying structure to improve efficiency. At a time of unprecedented pressure on Government finances, this will save significant taxpayer subsidy and is essential to enable Southeastern to meet its spending review budgets. Southeastern is taking the opportunity to remove first-class seats from its mainline services, freeing up almost 4 million extra seats for all each year. That creates capacity without adding cost.
The second reason is punctuality and reliability, which are the No. 1 drivers of customer satisfaction as measured by Transport Focus. Today’s timetable includes many crossing moves at key junctions that have a damaging impact on performance. Furthermore, at times of service disruption, the current timetable leads to the spread of delays to other routes and makes it much harder to recover the service. By deconflicting key junctions and changing the base structure, the new timetable is estimated to deliver a 12% reduction in cancellations and a 3% improvement in on-time station stops across the whole Southeastern network services. That is 300,000 more on-time station stops ever year. I want to make clear that reducing the number of London terminals directly served on some routes, which have been touched on today, will dramatically reduce the number of trains having to make complicated crossing moves at Lewisham, a notorious bottleneck. That will significantly improve performance for everyone using Southeastern.
I will turn to the third part of the rationale, which is flexibility. The change provides a simpler, cleaner, basic structure from which services can be altered far more easily and efficiently. Should demand patterns change in the way that we all want them to, services can more easily be scaled up—or down, if that is not the case—subject to available funding, of course.
The Minister gave figures for the reduction in demand. According to the ORR report I have in front of me, the peak of 183.2 million passenger journeys was in 2018-19. That is back up to 97.8 million, which is well over 50%. That is not the 65% reduction that I think he quoted. It is similar with the passenger kilometres, which are at 2,543 million, which is way over 50% of where we were at the highest point. What is happening is that rail services are recovering after covid, as we would expect. It is too early to make these decisions.
I am happy to send our statistic base to the hon. Gentleman and others who have contributed to the debate, so that we can agree on our starting point. The ORR report also demonstrates that passenger contributions through the fare box were more than £12 billion during pre-covid time, and we have got back to only £6 billion. That in itself demonstrates that we do not have the same patronage across our services. He will know that commuting has been the worst hit, because commuters can work differently. I am confident that my evidence base will stack up for this, but I will exchange it with him and other to ensure that is the case. I am about to come to consultation, but I will take an intervention.
(2 years ago)
Commons ChamberBefore the pandemic, the rail services through my constituency suffered from chronic overcrowding, yet the Government used the pandemic as an excuse to cut peak-time services from my constituency without consultation of those rail users. What is he going to do to monitor the damage that he has done and to ensure that those services are restored when those trains get chronically overcrowded again?
Southeastern did indeed ask for a derogation to consult, and changes had to be made quite rapidly during the pandemic, although may I just say that, as a fellow user of Southeastern, the hon. Member will find that there are some benefits from that? It is not just about taking down some costs; it is also about simplifying the line structure, so that at Lewisham, for example, there will not be as many trains crossing. If he would just wait and see how matters progress, he and I might find that it has been a good timetable change after all.
(8 years, 8 months ago)
Westminster HallWestminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.
Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
That is a worry and something the Minister should consider. If that is the case, the Government should take the franchise away now, because if Southeastern is going to look at its bottom line rather than the quality of the service, passengers will continue to suffer. That was a prime example of giving way to someone and them coming up with a better line in their intervention than I have in my speech, so I congratulate the hon. Gentleman on pulling all that together.
People in south-eastern London have suffered for decades. We had the disastrous privatisation that gave us the Connex franchise. We then had a period of relative stability, when the franchise was taken back in-house—in effect, nationalised—but that was followed by the ridiculous decision under the Labour Government to reprivatise it. I opposed that at the time, but we are where we are.
Passengers who use London Bridge station understand that the Thameslink scheme is bound to cause disruption. They have accepted that, despite the chaos at Christmas 2014. At the time, the Minister accepted that there had been an unacceptable deterioration in the service and she took action—I commend her for that—but this year’s performance has deteriorated to an all-time low. Passengers had accepted that train patterns would be substantially altered and that regular journeys had to change, because trains that people were used to catching might no longer be going to Cannon Street or Charing Cross, but the level of disruption they are suffering now is nothing to do with that. On the lines between Dartford and London Bridge, the service has failed, although when we had discussions before the Thameslink works started, we were told that the situation was under control. As I said, my constituents do not care who is to blame; they want to know that the tickets they purchase will get them to where they want to go.
I am grateful to the Library for an excellent paper it has produced to provide Members with information for this debate. It sets out how the public performance measure is calculated. The PPM shows the percentage of trains that arrive at their terminating station on time and combines figures for punctuality and reliability into a single performance measure. It is the industry standard for measuring performance, but it does not distinguish between extreme lateness and a brief delay. Southeastern’s PPM has fallen from 91.3% 12 months ago to 83.2% now. The average for all operators is 89.3%, so we are way below that. Another measure is right-time performance, which uses the percentage of trains arriving at their terminating station early or within 59 seconds of schedule. Southeastern’s right-time performance has fallen from 65.2% 12 months ago to 53.5% now. The average for all operators is 64.8%. Again, it is well below average.
The cancellation and significant lateness measure is for when a train is cancelled at origin or en route—this was my experience on the train that was going to Bexleyheath but then went to Sidcup—and when the originating station is changed or the train is diverted. A train is significantly late if it arrives at its terminating station 30 minutes or more late. On that measure, 2.4% of Southeastern trains were cancelled or significantly late 12 months ago, but the figure is now 4.3%—it has nearly doubled—while the average for all operators is 3%.
On every single measure we see poor performance from Southeastern. In autumn 2015, Passenger Focus showed that Southeastern’s passenger satisfaction was 75%, down from a high of 84% in 2013. In autumn 2015, the Chiltern franchise had the highest satisfaction rate, at 91%. The bottom three ranked operators were Thameslink, Southern—they are franchised as Thameslink, Southern and Great Northern—and Southeastern, which share the common factor of going into London Bridge. That must account for some of the dissatisfaction that people have with the service.
Last week, Which? published its annual passenger satisfaction survey. Southeastern was placed joint last, with an overall score of 46%; last year it was at 45%. Which? considers the impression of passengers over the previous year of the service provided. The difference between that and the Passenger Focus survey is that Passenger Focus considers the last journey that passengers made. That can be open to all sorts of factors, which can distort the figure. I would say that the Which? methodology far more accurately reflects the passenger experience than that of Passenger Focus, which is now Transport Focus. Those figures demonstrate just how consistently poor the service has been.
I am sorry that the fracture clinic will prevent me from being here for the entirety of the debate. I thank and congratulate the hon. Gentleman for holding this debate. Many of my constituents have experienced the same difficulties he has described. While I believe there will be better times around the corner once the track and station at London Bridge are developed, I am still concerned that we are short of capacity on these lines. Does he agree that it would be a huge concern if plans to give the Mayor of London wider powers for outer London were to affect the capacity further south? Does he also agree that to free up capacity we need a high-speed rail link from Bexhill and Hastings to St Pancras to create more capacity for his constituents?
I wish the hon. Gentleman luck in pursuing his scheme; I have got my own, which I will come to shortly. I have to say, Transport for London cannot be worse than Southeastern. It has had a positive impact when it has taken over other lines in similar circumstances, so hopefully it can achieve what Network Rail and Southeastern have failed to achieve in south-east London. Key bottlenecks such as Lewisham have to be overcome to achieve some of the things that Transport for London is talking about. I remain sceptical about whether it can achieve everything it says it can, but I am prepared to run with it and to be a critical friend, guiding it along the path of improving our train services in south-east London.
We need to hold people to account for what the figures demonstrate is consistent failure. The Minister did take action last Christmas when the service was appalling and there was a dangerous number of passengers on the concourse at London Bridge, but we must do more. To quote the Minister back at herself, on 28 January she admitted to the hon. Member for Bromley and Chislehurst (Robert Neill) that
“Southeastern was not at the top of the list for overall satisfaction. It is not quite at the bottom, but it is not at the top either.”—[Official Report, 28 January 2016; Vol. 605, c. 526.]
It was actually second from bottom and it has been so consistently. The Minister was reluctant to call it how it is, but we do our constituents a disservice when we do not do that. We really need to call it how it is to hold these people to account.
One concern I have about accountability is that the penalties that the franchise operators are required to pay the Government if they fail in their obligations are shrouded in commercial confidentiality, as are the payments made if they overperform. I would like to see some examples of overperformance—it would cheer me up no end. Why is that shrouded in secrecy? It is public money and a public service, so there should be public accountability. The Government should be proud to say, “We have penalised this franchise” when it fails our constituents. They should say, “Yes, we have made them pay a price and forced them to reinvest this money in this way to address this failure.” We should not say to the companies, “You can come and run a public service. You can hide behind commercial confidentiality and not let people know the price being paid.” All too often we see these people paying themselves huge bonuses in public services after such failures and that is not acceptable.
I want the Minister to ensure that we can see how the companies are being penalised for failures, because of the effect of those failures on people’s lives. They are late for work, late for job interviews, late getting a connecting train. We have all travelled on these train services that get stuck, and we have heard people’s life stories on their mobile phones as they go into meltdown around us because of delays. It is not right that the companies are not held publicly accountable when their failure is on such a scale.
Given the scale of the problem, the compensation scheme seems to be underused by passengers. Something needs to be done about that, because if we can make compensation easily accessible the companies might start to consider the standard of their performance a little better. People are eligible for compensation after their train is delayed for 30 minutes. The compensation scale goes up to a 100% refund for 60-minute delays, but according to the Library’s document no figures are available for take-up. I suggest that take-up is extremely low. The Office of Rail and Road found that just 11% of passengers surveyed nationally always or usually claimed compensation when they were entitled to it; 15% said they rarely claimed; and 68% said that they never complained.
We clearly need to do more to encourage passengers to come forward. Rather than come to their Member of Parliament, because they see us as the only outlet to vent their spleen, perhaps they could by right claim their compensation and make their voices heard directly with the franchise operators. Which? is running a campaign to make rail refunds easier that calls for
“clear information on how to get a refund for rail delays…all train companies offering cash as the first option”
and for train companies
“to be held to account if they fail to encourage passengers to claim refunds.”
I commend that campaign to the Minister and urge her to support it.
The Minister said on 28 January:
“We effectively now have rail fares going up at the lowest level”.—[Official Report, 28 January 2016; Vol. 605, c. 526.]
Is that absolutely correct? I have figures that say an annual season ticket from Eltham to central London has gone up by £328 a year—33%—since 2010. I do not think my constituents would say fares have been going up at the lowest level. Would the Minister care to comment on that? I do not think it is true. People are being forced to pay more for a service that clearly is not up to the standard they have a right to expect.
I know that an announcement is pending about increased capacity on our rail services—12-car trains. I have been campaigning on that for 15 years and been fobbed off with “The electricity supply isn’t up to it. The platforms aren’t long enough. We have terrible bottlenecks at Lewisham and London Bridge. Twelve-car trains are such a drag,” and all the rest of it. The fact is that in south-east London we do not have direct access to the London underground. Most of our journeys are like the spokes of a wheel, going in to central London and the main terminals at London Bridge, Charing Cross, Waterloo and others. Our constituents rely heavily on those services and have few alternatives. Buses do not really provide an alternative for journeys of that length, nor do buses have the capacity for the number of people who want to make those journeys. There is a transport deficit in south-east London.
We constantly hear from the people at Transport for London about how much TfL must invest in the London underground and how important it is to increase capacity, and I get that. I understand how vital it is to London. However, TfL is even calling the new underground line going through New Cross the orbital route; that is how far TfL thinks London goes out—as far as New Cross. People outside its orbit are Pluto, or something. Because we do not have direct access to alternatives, our rail services are vital.
For too long people have been crammed on to overcrowded carriages, particularly at peak times. This morning, for example, I was waiting at the station at 7.35 at Eltham. The Victoria train came in and it was six carriages long, at peak time. It is not acceptable. The train that I caught to Charing Cross was eight carriages long. At those times of the day they should be 12-car trains. Trains are packed by the time they get to places such as Eltham, Kidbrooke and Blackheath; anyone getting on at Lewisham needs a crowbar. It is not acceptable. We have got to have increased capacity on our rail services.
TfL is very keen to take over the service and it would have my blessing, but as I said, I will be a critical friend. If it is going to increase the frequency of trains on the service it will have to deal with the signalling system. It is no good putting more frequent trains through with fewer carriages; we need more capacity. I will support TfL’s bid for the metro services on Southeastern, but we need to ensure that the Government and MPs scrutinise what it says about what it will deliver. We need to improve the service and increase its capacity significantly.
The landslide caused me great concern. I thought, “What if it had happened as a train was going by?” which was highly likely, because the vibration of a train could have exacerbated the situation and brought a landslide down. Some infrastructure was involved, so I want to know if a proper survey of the infrastructure has been done. As I said, more than 70% of the delays have been due to signals and infrastructure under the control of Network Rail. Does it survey the infrastructure to the point at which it identifies likely problems and puts them right, so that they do not become constant nagging problems and a cause of future delays? It seems that the system is creaking at the seams. Is Network Rail on top of that? I would like the Minister’s assurance that she is on top of Network Rail, and that she will ensure it tries to drive out the gremlins that cause all the problems for Southeastern and our constituents.
As I have mentioned, I want the penalties and rewards for train operating companies’ performance to be published and the people concerned held to account. I would like the Minister to put pressure on the transport operating companies to make people aware of compensation schemes. Above all I want the Government and TfL to recognise that south-east London has a transport deficit, which cannot continue to be ignored when the future expansion of rail services, including such things as the underground and the docklands light railway, is considered. The situation in south-east London is unacceptable. I look forward to hearing what the Minister intends to do about it.
Several Hon. Members rose—