All 1 Debates between Chris Heaton-Harris and Graham P Jones

Colne to Skipton Railway Link

Debate between Chris Heaton-Harris and Graham P Jones
Tuesday 29th October 2019

(5 years, 1 month ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Graham P Jones Portrait Graham P. Jones
- Hansard - - - Excerpts

I thank you, Mr Howarth, for chairing this debate. I also thank the hon. Members who have contributed to it, including my hon. Friend the Member for St Helens North (Conor McGinn), who probably agrees that rail passengers in his constituency would be liberated by the reinstatement of this rail link, and my hon. Friend the Member for Burnley (Julie Cooper). She rightly pointed out that Burnley Borough Council, along with other local councils including Labour councils, led on the Todmorden curve initiative without much input from Lancashire County Council, which was very disappointing for a transport authority. We do not congratulate Burnley Council enough.

I also thank my hon. Friend the Member for Keighley (John Grogan) and the hon. Member for Harrogate and Knaresborough (Andrew Jones), the former heavy rail Minister, who has been backing this project for quite a long time. He probably feels that he has been backing it for so long that it must happen one day. I suggest that if he votes Labour at the next election, that day might come sooner, rather than later or never.

The Minister touched on the issue of the M65, which I did not bring up. To summarise briefly, that is another key pipeline project that must go ahead in conjunction with the rail link. I raised that issue quite a while ago, alongside my hon. Friend the Member for Burnley, and have been a vociferous campaigner at the vanguard of the campaign to ensure that we get that connection through to the north-east, to Leeds and to the M1.

The Minister said that the Government were investing heavily in the north. I gently point out that if he is serious about investing in the north, he should back the budget for Transport for the North and the Northern Powerhouse Rail project, which comes in at £39 billion; I hope that commitment is not going to recede. The Government seem undecided about how much they will spend on Northern Powerhouse Rail, with some figures as low as £12 billion, rather than the £39 billion that is required. I also hope that the Government will commit to the northern infrastructure pipeline, a £7 billion investment to get some of the projects up and running quickly. They have not done so yet, so the idea that they have made some commitment to investment in the north that is equivalent to what is invested in the south does not bear scrutiny.

The Minister talked about cost, affordability and value for money. We are back to those words again; we are telling deprived communities, “You are not worth it. You are not getting anything. Hard luck.” This is a £360 million project; over 100 years, that is £360,000 a year. East Lancashire clinical commissioning group spends £1 billion a year, and that figure does not include West Yorkshire’s clinical commissioning groups, which probably spend more. Building this rail line will cost 0.3% of the health budget, so let us get some perspective. When we talk about levels of deprivation, building this line is an easy answer. In the context of a health budget, this rail infrastructure investment is a minuscule amount, particularly if we look at the whole corridor. It probably amounts to less than 0.1% of the health budget for that corridor, where deprivation levels are some of the most severe in the country. I do not understand the Government’s thinking in denying this investment at this stage; we should press on and do it. As my hon. Friend the Member for Keighley said, there is no better time than the 175th anniversary of the opening of the original line. Let us get the shovels in the ground.

The Minister mentioned value for money. Is it not about time that we get local contractors and local people in? This is a deprived area. Why are we not bringing in local contractors to do some of this basic work, such as the trackbed work, which does not require engineering?

Chris Heaton-Harris Portrait Chris Heaton-Harris
- Hansard - -

European procurement rules.

Graham P Jones Portrait Graham P. Jones
- Hansard - - - Excerpts

It does not matter. That does not excuse us from bringing in local contractors to do some of the most basic work, lowering the costs. We do not always have to bring in experienced contractors from the south on high-value contracts; that does not serve the cost analysis very well. I do not think that affordability, cost and value for money should be the drivers of this particular scheme.

My hon. Friend the Member for Keighley was right to say that Christmas could have come early for us all if the Minister had committed to this rail line, but he has not. My hon. Friend the Member for York Central (Rachael Maskell), who gave a very good speech, rightly suggested that it is about time that we brought the railways into public ownership so that we can make these decisions, instead of their being made by consultants and outside bodies. Local, democratically elected people should decide what is best for their local communities, not some of the experts who have failed east Lancashire.

Question put and agreed to.

Resolved,

That this House has considered the proposed reinstatement of the Colne to Skipton railway link.