My hon. Friend is a valiant supporter of the Government. He chaired the Select Committee on the hybrid Bill and I pay tribute to the way in which he sought to deal with the problems that cropped up during the proceedings. However, there would be no need for compensation if there was not an HS2 project. I do not think the opinions polls that I referred to feature people who have been affected by the route of the line; they simply think it is an extremely bad deal. It is a white elephant indeed.
Although our colleague praises the fact that a lot money has been spent on compensation, the truth of the matter is that many of our constituents have had to fight tooth and nail to get the value of their properties, and in fact are losing out overall because it will be HS2 that capitalises on their properties. They have lost their homes and, in some cases, their livelihoods.
That in itself is a complete tragedy. I totally endorse everything that my right hon. Friend said. The project has caused an enormous amount of anxiety and stress. I have friends and constituents who have literally been made physically ill as a result. Not only is it a catastrophic exercise in maladministration and failure to cost things properly, as I will mention, but it has caused anxiety and ultimately cannot be justified.
(6 years, 10 months ago)
Commons ChamberI absolutely agree, but unfortunately that advice has not been taken.
Secondly, I have no confidence whatever in the Government’s stated outcomes for HS2 phase 2 in building costs or in social and environmental impacts. This comes from the dismal experience of their failures over their own reports on phase 1. The House of Lords Economic Affairs Committee cast doubt on phase 1 from the beginning of the process, arguing that the evidence used to calculate the magnitude of benefit was out of date and unconvincing. The Library briefing shows how the benefit to cost ratio of phase 1 has fallen consistently over time. Nothing has been done to address these flaws in the economic modelling.
Progress on the delivery of phase 1 is similarly criticised by the National Audit Office in its 2016 review, which stated that the Department for Transport had
“set HS2 Ltd a schedule for achieving delivery readiness that was too ambitious”,
and that:
“There is a risk that the combined impact of cost and schedule pressures result in reduced programme scope and lower the benefit cost ratio.”
It also stated that:
“Effective integration of High Speed 2 with the wider UK rail system is challenging and poses risks to value for money”.
The NAO attacks the cost estimates for phase 2, which it says are
“at a much earlier stage of development than phase 1”,
with some elements currently unfunded. For the past four years, the Infrastructure and Projects Authority has put HS2 just one step above appearing what it defines as
“unachievable unless significant, urgent and often substantial action is taken.”
I ask the Minister what evidence there is that this will be done.
Cost overruns and delays have long been associated with public construction, but HS2 dwarfs the problems of the past. Think about the amount that could be made available to the public services if these billions and billions of pounds went towards something other than this white elephant in the making. We are doomed to exist in a perpetual cycle of departmental over-promising and under-delivering. In the light of concerns about the phase 1 Bill, it is impossible to trust the Government’s assertions as to the benefits of phase 2.
Thirdly, I must cast doubt over the ability of HS2 Ltd. The Public Accounts Committee accuses HS2 Ltd of having a culture
“of failing to provide full and accurate information to those responsible for holding it to account”
and states that it
“does not have in place the basic controls needed to protect public money.”
There cannot be a bigger condemnation than that. Those basic failures underline the incompetence with which the project has been conducted. Most damningly, the PAC accuses both HS2 Ltd and the Department of not appearing
“to understand the risks to the successful delivery of the programme”.
This is a Second Reading debate, and I am saying that all the reports indicate that we can have no trust in how the principal objectives of the project are being conducted. That is evident in the employment of Carillion as a key contractor on the project. A clear lack of oversight and due diligence has jeopardised public money. Those arguments mean that the Bill fails to meet the standards required of this House.
Moving to the local issues that affect my constituents, I am thoroughly dismayed with the entire project. Not only does the proposal carve through my entire constituency from top to bottom, without any immediate benefit to my constituents in terms of communication or railway stops, but many will acknowledge that the current west coast main line provides a good service and short journey times. As my right hon. Friend the Member for Chesham and Amersham has indicated, this HS2 project will be overtaken by new technologies, such as the possibility of a maglev system or a hyperloop system, and the technology used in the HS2 project is increasingly out of date. Within the timespan for the completion of the project, the money would be better spent on other programmes and public services.
Does my hon. Friend agree that if the project involved running autonomous passenger and freight vehicles or other vehicles of the future up and down the line, it would probably be slightly more popular? The trouble is that the technology and the whole approach involved will produce something that is from the last century.
That is completely right. It is also perhaps true that travel times were quicker in those days than they are now. This project is about not simply capacity but efficiency, and I do not believe that its objectives will be achieved.
Turning to my local objections, a railhead will be established at Yarnfield during the construction period and will later be turned into a permanent maintenance facility. The relocation of the planned facility away from the original destination in Crewe has caused massive consternation to all my constituents in Stone and Eccleshall, and in all villages around the area, particularly Yarnfield. On 24 November 2016, I secured a half-hour Adjournment debate on the matter, and I have spoken in a variety of meetings both locally and in the House since then. Most recently, I had a meeting with the Stone Railhead Crisis Group on Friday 19 January. I will be offering help with petitions to anybody who wants it. I have invited the Clerk of Private Bills to meet the group, and I hope that that meeting will take place soon.
I reiterate that the way in which alternatives to the final proposition were considered was appalling. The original proposal for the railhead to be at Crewe was not selected. I believe that there has been serial misdirection and misinformation about employment and environmental issues. Crewe would have been far better, but now HS2 has decided to go for Yarnfield and the vicinity thereof, which will do appalling damage to my constituents, and their traffic and schools. Every single aspect of the development will have the most serious and deleterious effect on my constituents.
The disruption due to works at Norton Bridge has already started, and the HS2 works at Stone and Swynnerton belie the notion that disruption will be minimised—it is liable only to get worse. The HS2 phase 2 environmental statement draws attention to lighting being visible along Yarnfield Lane and on the north eastern edge of Yarnfield itself. That is on top of the significant and noticeable noise that the facility will generate, the destruction of woodland, the destruction of visual landscape and the substantial noise from construction traffic.
I am also deeply concerned about the impact on the elderly, and it is shameful that retired people who seek a peaceful rural life will find their area violated. I am also concerned about the communities that are being directly destroyed, such as two properties in Shelton under Harley. There will be noise from construction on Pirehill Lane. There are also problems for several grade II listed buildings, including Blakelow farm, the water tower on Stab Lane and the Swynnerton Heath farmhouse, in addition to non-listed heritage sites such as Darlaston pool, the milestone near Cash’s pit and areas of the Shelton under Harley farm. That is yet another example of the damage that will be done.
In an update statement on 17 July 2017, the Secretary of State for Transport assured me that Yarnfield Lane will remain open. I am afraid to say that that assurance is useless without any consideration of the impact of heavy goods vehicles travelling along that narrow road, rendering it impassable during peak hours as if it were fully closed. That is bound to have a very bad effect on my constituents’ health and welfare. The proposal to use Eccleshall Road as an access and supply route will block the whole area, which is already oversubscribed.
Cold Norton is a cluster of 40 dwellings within 500 metres of the M6, but it does not appear to be included in the documents. If the works lead to the closure of the B5026 and Yarnfield Lane, my constituents in Cold Norton, Norton Bridge, Chebsey, Yarnfield, Swynnerton and Eccleshall will not have access to their main travel route into Stone. There will also be an impact on Great Bridgeford and many other areas in the constituency of my hon. Friend the Member for Stafford (Jeremy Lefroy).
Trains will go straight down my entire constituency, from top to bottom. Baldwin’s Gate, Bar Hill, Whitmore and Madeley are in a rural area of outstanding natural beauty. The proposed scheme will cut straight through it, with two viaducts at the River Lea valley and Meece brook valley, and two tunnels along the way. There will be an enormous amount of construction work in a delicate area.
I will meet the Whitmore2Madeley action group on Friday 2 February to examine the proposed Whitmore construction site. I met the group in July 2017, and I have organised a meeting so that the group can meet the Clerk of Private Bills.
The environmental impact assessments show there will be significant quality-of-life problems at the Stone railhead. The views from Rectory Lane, Manor Road, Madeley cemetery, Madeley Park, Bar Hill Road and Wrinehill wood will all be negatively affected, and there will be traffic problems, too.
Then we have the A51 London Road and A53 Newcastle Road to consider. At least five footpaths will be closed in the process of construction. Communities and cultural heritage in the area will also suffer. Viaducts at Lea valley and Meece brook will prove to be eyesores. Nine properties will be permanently affected, including Rose Cottage and Wood Croft. Construction will cause impossible chaos for 29 residential properties in Whitmore and Whitmore Heath, 20 on Manor Road, 43 on Bar Hill Road and Mallard Close, and five at Moor Hall and Bower End farms. Furthermore, Hey House, a grade II listed house, will have its setting permanently degraded.
I now turn to the environmental cost in the area. Most prominent is the destruction of at least part of two woods—Whitmore wood and Barhill wood. The Woodland Trust points out the possible cost of this damage, noting that the
“Stone constituency will suffer loss or damage to 11 ancient woodlands, totalling 8.9 ha of loss. Whitmore Wood will suffer the greatest single loss of ancient woodland on the entire HS2 route. Tunnelling must be considered to avoid this loss.”
That is an attack on our woodland environment.
An additional 0.2 hectares will be lost at Barhill wood to allow for the Madeley tunnel portal. This forms just a small part of the argument for a longer, deeper tunnel to limit the environmental damage of the scheme, which I know that the Minister is examining. Such a tunnel would not completely remove the damaging local impact of this proposal, but it would nevertheless prevent the inefficient upheaval generated by involving multiple sites. There is an argument about this tunnel and I have been given certain assurances, but I am deeply concerned about whether the money will be made available in any case—we have no certainty about that at this stage. More specifically, the proposal for a tunnel from Whitmore to Madeley would, it is argued, avoid the destruction by HS2 works of 33% of Whitmore wood, the viaduct and embankments in the Lea valley, and the disruptive work on Manor Road. This has to be pursued vigorously so that we get to the bottom of exactly what will be involved. I understand the assurances that have been given, but there are also complications due to the relationship between the northern part and the southern part of my constituency, which will doubtless be the subject of petitions from the two groups in question.
In conclusion, I will be voting against the Bill, as I did on the previous Bill for phase 1. My constituents will be petitioning against the Bill and will appear in front of the Select Committee. I urge the Government and that Committee to do all they can to pay the most careful attention to these petitions if this Bill goes through today, and to provide my constituents with every opportunity to be heard. This is a very, very big thing for them—it is massive. Hon. Members should think what it would be like if this were to happen to any other constituency on the scale it is happening to mine, which is similar to the situation in the constituency of my right hon. Friend the Member for Chesham and Amersham. She has done a fantastic job and we will try to do the same in our area. At the moment, I am deeply disappointed with these proposals and I shall be voting against them.
(7 years, 4 months ago)
Commons ChamberThe House will not be surprised that I rise to my feet to talk about this small motion, but colleagues sitting alongside me may be surprised to learn that I rise to welcome it. As a veteran of the hybrid Bill process, I can say that there is no doubt that it is arcane and has tremendous problems with its practices and procedures. My constituents, and many constituents of other hon. Members, certainly have been at the mercy of the hybrid Bill process, and I shudder when I hear a Front Bencher say that the environmental statement will be at least 12,000 pages long. I have experienced something just as large for phase 1 of the HS2 process, and I can say that these are indeed very opaque documents. Will the Deputy Leader of the House say whether these will be sufficiently navigable instruments, as this is being served up to people electronically? I found, as did many of my constituents, that the documents presented by HS2 Ltd were very difficult to navigate and hard to find. Therefore, I would like assurances that some improvements have been made to the way in which people can move around these very large documents.
The Deputy Leader of the House has already given assurances that nothing in tonight’s order will prevent communities from accessing paper copies. We must not forget that there is a digital divide. Many of the people affected by this project are elderly and do not access large documents easily on computers. It is very important that they have access, free of charge, to those sections of the documentation that relate to their properties or the area around that part of the route.
Does my right hon. Friend agree that when this material comes electronically and then has to be turned, at a person’s home or office, into the kind of material that makes sense and that they can read, the complexity of the documents—the design specifications and all the other things—and the monumental volume of paper becomes very daunting indeed? To refer back to our previous debate on consultation, does she also agree that HS2 Ltd, as I said to the project manager the other day, had better get its act together on consultation and do it properly?
It is clear to me and many others who are involved with the project that HS2 Ltd needs to improve not only its consultation processes but its communications processes, which are still appalling in many instances.
(8 years ago)
Commons ChamberI want to make clear, on behalf of my constituents, my very strong objection to the proposals in section 4 of the document entitled, “HS2 Phase 2a: West Midlands to Crewe design refinement consultation”. I have already registered my objections to HS2 on many, many occasions. My right hon. Friend the Member for Chesham and Amersham (Mrs Gillan) and my hon. Friend the Member for Stafford (Jeremy Lefroy) have also taken a very strong line on this whole subject for a very long time. There will be a Bill, presumably after December. At some point, there will be a hybrid Bill, on which my constituents will be able to petition if they need to do so.
I want to set out my objections to these initial proposals. They amount to a railhead at Yarnfield, in between the proposed HS2 route and the M6, which is likely to become, we believe, a permanent maintenance facility to replace the infrastructure maintenance depot at Crewe. Stone Town Council has said in its objections that it is extremely disappointed with the level of consultation of Stone residents. That does not really fit in with the Minister’s saying in the previous debate, in which I took part with my right hon. and hon. Friends, that he was absolutely determined that consultation would be at the very highest level. I have to say that my constituents do not believe that that has been effective in this particular case, and I ask him to look into that.
I recently held a public meeting with my constituents in Yarnfield village hall, and the depth of frustration and anger at the proposals, which have caused extreme anxiety in the local area, was evident to all, as in a meeting with local residents that I had on the same day in Baldwins Gate, further to the north. I will hold a further public meeting on 3 December in Walton community centre.
The Yarnfield railhead sliver is totally new in the September 2016 consultation. The railhead was meant to have been in Crewe, and this is a shock to all my constituents in the towns of Stone and Eccleshall, and all the villages in and around the area, particularly Yarnfield. This is not a conceptual design, as the others have been; it is a detailed design that required much more time for consultation of the affected people. HS2’s standard consultation process was therefore hopelessly inadequate. Why did HS2 identify the Yarnfield area as appropriate instead of Crewe?
My constituents have raised an important issue in relation to the options appraisal in the community area report for my constituency. It contained eight options, but four were not taken forward. A brief commentary is provided with regard to only one of the four rejected options, which is Madeley. Of the remaining three, one is not related to Stone—option 5, for Crewe—and this is described in one section as the preferred environmental option. Of the three remaining Stone options, option 8—the Stone hybrid, now selected by HS2—seems to be a combination of options 2 and 3, but we have had only a very limited amount of time to consider all this. We believe that there has been misinformation about the number of jobs and a lack of evidence to demonstrate that there was availability in Crewe. This seems to have been overridden, and we do not understand why it has happened.
With regard to the railhead south of Crewe at the northern end of the phase 2a route, the consultation paper does not explain why Yarnfield must be chosen, nor why the so-called design development work would lead to the identification of Yarnfield as appropriate. The reason to move the location from Crewe to Yarnfield cannot be that Crewe is now to have 370 new homes, some of which have already been built. That would be baffling, because the site at Yarnfield is even more inappropriate given the positioning of local residential buildings.
The disruption that has already been caused by HS2 project preparation throughout my constituency, including Stone and Swynnerton, on top of the ongoing works at Norton Bridge that have been shattering the local area and having a great impact on nearby residents, has been excessive. Therefore, the attempt to minimise disruption in Crewe only to maximise it in Yarnfield does not seem, by any means, to be a good idea or a sensible option.
Does my hon. Friend agree that we need better communications with HS2? It has started to do the exploratory groundworks in my constituency, but it failed to get the correct permissions in Chalfont St Giles and since then a lorry has had an accident there. I think that we as MPs need a hotline to HS2 and to the Department, so that we can report some of the aggravation that is going down in our constituencies. If it is already happening in my hon. Friend’s constituency, all I can say is that I have a great deal of sympathy, because it is certainly happening in mine.
I am extremely grateful to, and concur with, my right hon. Friend. Accidents have occurred and I think that a hotline is an extremely good idea. I hope that the Minister is listening.
An analysis of the population of Yarnfield and the Stone area shows that over-65-year-olds make up a significant number of the local population. The proposed option will do nothing to enhance, let alone accommodate, an environment to support such an elderly population. Many residents in Yarnfield who are elderly and infirm will have to live with those proposals being imposed on them. Not only will they create dust, noise, light pollution and total disruption to all the residents of numerous surrounding villages and the Stone town, they will also ruin the lives of many who have chosen to retire to a rural environment and who have settled in the area in good faith. People in Stone town itself are also deeply concerned.
(8 years, 1 month ago)
Commons ChamberI am grateful for the break in proceedings and for that kind intervention by my hon. Friend. As I have said before, it is never possible to over-flatter a politician! I feel passionately about this issue, as do many others, and if I have the freedom to speak, I am very happy to reflect the views of others. I know that my hon. Friend the Member for Stafford (Jeremy Lefroy) has himself worked very hard on trying to mitigate this scheme. In fact, I am now alongside two Staffordshire Members. I am second to none in my admiration for the support that I have had from my colleagues who, I think, feel as strongly as I do.
At the time of Third Reading, I tabled amendments proposing the introduction of an adjudicator—an independent regulatory body that could deal with complaints swiftly and fairly. People who are affected by the scheme would have confidence and faith in such a body, and I think that it is still badly needed. I urge the Minister to think about the amendments again before Royal Assent, to accept them and to try to create a body that would give confidence and faith to the people who are being so badly affected.
As my hon. Friend the Member for Stafford (Jeremy Lefroy) is aware, we have a serious problem in our part of Staffordshire. What my right hon. Friend the Member for Chesham and Amersham (Mrs Gillan) is suggesting would help enormously to deal with the frequent complaints about the manner in which HS2 Ltd is operating, which is causing local people enormous anxiety. I shall be seeing some of them over the weekend to discuss these very questions. I am deeply grateful to my right hon. Friend, and totally endorse her proposal.
I thank my hon. Friend for what he says. We spent some time drafting the amendments, and some serious and senior legal brains were brought to bear. The Minister is new to his post, so he might not be as familiar with this project as the rest of us, and this would be a good opportunity for him to review my proposal. Then at least I would feel that it had been examined and considered before being rejected, whereas at the moment I feel that the proposal was rejected out of hand because it came from someone whose constituency was affected so badly by the scheme.
I am astounded by the lack of information that HS2 Ltd has about communications. I do not know whether the Minister has had a chance to look at the answers that have been supplied to my written questions over the past fortnight. In preparation for the debate, I asked for the annual budgets for communication and engagement by HS2 Ltd since 2010. The response stated that the figures could not be provided, as
“the amount of time spent on communication and engagement activity is not centrally tracked.”
I am astounded that, in spite of all the external criticism and scrutiny of its poor communications, HS2 Ltd is not even keeping track of what it is spending, how it is spending, and who is doing what.
The cost of HS2 started at £30 billion, then rose to £50 billion, and is now increasing further. According to the latest estimates from all the experts, it is rising exponentially. One can imagine that it might end up being £80 billion or even more, in which case it would cost more than Hinkley Point, the Heathrow development and a development at Gatwick, if that were also to take place. We are talking about a payment of massive sums for what many people regard as a badly thought out project that will cause a great deal of anxiety and trouble.
It is a case of the three Hs: Hinkley, Heathrow, and HS2; and the greatest of them all is HS2. The Minister has probably heard me say this before, but I still think that the project is so gargantuan that it deserves to be overseen by a dedicated Minister who would keep an eye on it. A sum of £80 billion is larger than the budgets of many Departments of State. It is absurd to think that five Secretaries of State and as many Ministers have overseen this project over a comparatively short period. The lack of continuity is ridiculous. Now we have lost the chief executive, of course, who is going to Rolls-Royce. We have an interim chief executive—Mr Hill, I believe—who comes from CH2M, which has just received a bonus from HS2 for some of its works, and I believe is still in the running to bid for contracts. The arm’s length relationship with contractors does not seem to have been maintained in the current circumstances.
My right hon. Friend the Member for South Northamptonshire asked me to raise particular communications flaws in the need-to-sell scheme. Apparently, constituents still find it difficult to speak to a named lead on their case and cannot retrieve information from HS2 Ltd until they have made an application. On Tuesday, in reply to a written question inquiring about the effectiveness of the scheme, the responding Minister told me that it was operating fairly and as intended. That is certainly not reflected in my right hon. Friend’s remarks to me, so that is worth looking into. I hope that the Minister will respond positively to that.
I will not go into the inadequacy of the legislative process through which the HS2 Bill is being put through this House and the House of Lords. That is a matter for another time but, needless to say, the process itself causes a great deal of confusion and consternation. My right hon. and learned Friend the Member for Kenilworth and Southam (Jeremy Wright) raised with me the excellent point that better communication and provision of information would have negated the need for the House of Commons Select Committee to hear so many petitions. Constructive engagement beforehand could have promoted a dialogue away from the Committee Room, and thus speeded up the passage of the Bill. I think that people felt the only way they could communicate with HS2 Ltd was by depositing a petition and coming along in person to make their case.
I also wish to highlight the poor practice of corridor deals during the Select Committee process. The relocation of the construction haul road in Great Missenden in my constituency was agreed in principle between Buckinghamshire County Council and HS2 Ltd in such a deal. The promise by the promoter altered the evidence given thereafter in Committee and, as it stands, the pledge has not been fulfilled.
The nature of these corridor deals means that vital discussions are not transparent and assurances cannot be enforced. In this case, my constituents feel they are left in a very uncertain and unclear position as to HS2’s intentions towards a traffic management plan that will have an enormous local impact at Great Missenden.
My right hon. and learned Friend the Member for Kenilworth and Southam also asked me to raise the unsatisfactory fact that constituents need to resort to submitting freedom of information requests to obtain meaningful and detailed information. Once again, such information should have been available from HS2 Ltd at the outset, and it is a great shame that it does not display greater transparency. It must understand that I, as an MP—I think I am speaking for my hon. Friends in the Chamber with an interest in the matter—have always approached this on a twin-track basis. If I could not persuade the Government that this was not the scheme in the right place at the right time, and going to the right places, I would be working hard to mitigate its effect on my constituency, and especially on the area of outstanding natural beauty. However, it always seems to me that HS2 thinks that MPs are working against it, yet if this scheme is going to go through, we will have to accept that, but we need to work with HS2 to improve the outcomes for the people we represent.
What is so depressing is the fact that the lessons from phase 1 that we have tried to point out do not seem to have been learned, and the mistakes are being repeated in phase 2. The burden of supplementing HS2’s poor performance has certainly fallen disproportionately on local authorities. I am fearful about the next part of the process and the planning that will follow, because there will be more and more burdens on our local authorities, whose budgets—let’s face it—are stretched as it is.
As my hon. Friend the Member for Stafford implied, the fact is that whatever is decided regarding the current Bill as it goes through the House of Lords will inevitably be applied as a precedent for the next Bill. That is why we need to follow closely what my right hon. Friend the Member for Chesham and Amersham says. I congratulate her on doing everything possible to get this right now.
Separately from giving evidence and making recommendations on how we should change the procedures of the House, I think that everyone would agree that it is inequitable that our Standing Orders prevent Members of Parliament from appearing as petitioners in the other place. The Chairman of the Committee had no choice but to interpret the Standing Orders in that way, but to remove the right of advocacy from Members of Parliament seems self-defeating and inadequate, and I am sure that Members of both Houses will want that to change.
The burden on local authorities, especially in relation to communications, has been astronomical. The leader of Buckinghamshire County Council told the House of Lords HS2 Select Committee on Monday that the council had spent £110,264 in 2015-16 on community liaison relating to HS2. That was entirely to cover for HS2’s poor communications. The council has asked for retrospective compensation to recover those costs, which I think is entirely reasonable. I hope that the Minister will agree to that request. If he cannot do so at the Dispatch Box today, perhaps he will do me the courtesy of looking into the matter to see how we can compensate our local authorities.
I would like the Minister to note that I find it incredible that a county council can provide actual figures for communication and community engagement, down to the last pound, whereas HS2 Ltd cannot do so. Indeed, the county council has since incurred further costs in assisting HS2 Ltd’s groundwork investigations, as its staff are consistently used to help to mediate between HS2 Ltd and residents when intentions to access land have not been adequately communicated. HS2 Ltd could and should be doing that job satisfactorily on its own, if only it had the will. Prior to the introduction of the local engagement managers, local authorities were expected to plug the gap in communication and to provide residents with information that was not readily available from HS2 Ltd. The Minister should bear in mind the fact that that was all done at the councils’ own expense.
It is not just local authorities, parish councils and residents that are affected in this way; HS2 Ltd’s poor engagement reaches into a wider constituency. I have been contacted by the Woodland Trust, which reports that it has not been engaged on the independent review of biodiversity, as recommended in the House of Commons Select Committee, and that it might now have to petition the House of Lords without the information it needs. It also tells me that information regarding third-party planning applications has not been forthcoming from HS2 Ltd, and that that has caused unacceptable delays in compensation payments. A project of this size that brings with it such a heavy burden on our environment, in particular the violation of the AONB in the Chilterns, really should ensure that it deals with the detail and follows up with the environmental organisations that are trying to help to mitigate the project’s impact on the environment.
I ask the Minister to take note of the ongoing communication failures and to ensure that he will make sorting them out his priority. This catalogue of errors has considerably hindered HS2 Ltd’s operation—it is the company’s fault—and is costing the taxpayer even more money. The Minister needs to consider creating a scrutiny body with teeth to hold the organisation to account, especially with construction fast approaching.
HS2 Ltd needs a better attitude towards the affected people. When I was preparing for this debate, I thought of two main themes that I wanted to leave with the Minister. First, I want to ensure that there is an overhaul of the communication and engagement strategy and the attitudes of HS2 Ltd. That should be considered at the highest level of the Department for Transport. Secondly, echoing the interventions from my hon. Friend the Member for Stone (Sir William Cash), I want to ensure that this communication calamity never happens again. Residents who received substandard treatment during phase 1 should be the exception, not the rule. If residents are going to be treated the same way under phase 2, the taxpayer will be paying even more for the project than is anticipated.
We have to reconsider how we do major infrastructure projects. We had an announcement this week on Heathrow, which I welcomed because it will be of economic benefit to Buckinghamshire, my constituency and my residents. We finally got a decision after the Davies commission and years of investigation—the project has been examined from every angle. HS2, however, was written on the back of an envelope by a Labour Transport Minister and immediately adopted by the coalition Government. All those processes were not followed. One system is far too long and the other is far too short. We need to find a way of ensuring that our infrastructure projects are the right projects in the right places, and that communications and engagement are of the highest standard, otherwise greater problems will emerge as such projects progress.
I do not usually talk at such great length and did not realise that I was going to have the luxury of taking so many interventions. I thank my colleagues in the Chamber for their support today, particularly those who must remain silent. I hope that the Minister will assure me that he will use his influence radically to re-evaluate how HS2 Ltd deals with our constituents, and that he will embed a culture of respect, transparency, openness and improved communications.
(8 years, 8 months ago)
Commons ChamberI drew the House’s attention to that report in a point of order. The report is appended to today’s debate, but of course there was no possibility of tabling amendments that referred to that report in an attempt to alter HS2’s behaviour.
New clause 2 is designed to ensure that all local authorities are properly compensated for any damage to roads as a result of HS2 constructions. As others have confirmed, that vital safeguard should be added to the Bill. The Secretary of State, who is now in his place on the Front Bench, visited my constituency earlier this month and saw at first hand some of the problems that my constituents face. I am grateful for that visit. He also saw the problems we have in Buckinghamshire with potholes. I am particularly concerned about the roads in and around Great Missenden. Quite by chance, my right hon. Friend witnessed maintenance works being carried out on those roads during his visit.
Buckinghamshire County Council highways authority estimates that it will spend about £7.5 million on pothole-related maintenance over the next five years. That figure takes no account of patching, resurfacing, drainage, road sweeping and other related costs. I believe that considerable additional costs will arise from the large number of heavy goods vehicles pounding their way up and down some of Buckinghamshire’s fragile roads. Local authorities may well be reimbursed for reasonable costs, but what are reasonable costs? I want them to be reimbursed fully and I want that to be enshrined in statute, to make sure that the provision is both sufficient and justiciable.
New clause 3 is intended to increase the amounts allocated by the Department for Transport to the business and local economy fund and the community and environment fund from £30 million to £150 million. The £30 million originally announced for those funds to assist those affected by HS2 has been felt across the board to be meagre and insufficient, especially as the funding is intended to cover the entire route of phase 1. The Select Committee acknowledged the significant shortfall and the Government’s response to its final report stated that the sum would be increased to £40 million. I contend that that is not enough. The impacts of the project will be long standing and severe for the environment, local authorities and communities. Through new clause 3, I propose that the funding be increased to £150 million to give those affected the compensation they deserve and to ensure that adverse effects are minimised.
Both of us have signed new clause 33 on compensation by reference to a property bond. I wanted to put that on the record. My right hon. Friend is doing a great job, and I do not want to take up the time of the House to refer to new clause 33, knowing that she agrees with me.
I am grateful to my hon. Friend, and grateful for the support that I have received from colleagues across the piece.
On new clause 3, there is currently no information on how the funds will be divided, which areas will be prioritised or how the money could be spent. There is also no clarification of whether, for example, the funds to be allocated will include the moneys already allocated to the Colne valley. Will those come out of this funding envelope? There has been a suggestion that the money will be delivered locally through local enterprise partnerships, but that would be most unsuitable. In Buckinghamshire, for example, we have two overlapping LEPs. How would the money be administered? I think it should be kept separate from the LEPs and genuinely given to local groups so that they can decide how best to distribute the funds. I urge the Minister both to increase the funds and to provide further details on how they will be administered.
The last new clause to which I shall speak in this group is new clause 4, which deals with compensation. All the MPs who have constituencies along the route will know that compensation issues have caused great worry and stress to our constituents, and many of the recommendations of the HS2 hybrid Bill Select Committee, although welcome, have yet to translate into changes to the schemes. The Select Committee’s report in February 2016 stated that
“the Government said that it would work to implement a revised process for the valuation of properties for ‘Need to Sell’ that will allow more local valuers to be used”.
That review was promised for autumn last year, but we are still waiting.
The Department for Transport’s response to the Select Committee report is silent on the valuation point, and although a response was promised before Third Reading, when I last looked I had not yet received that. I may be wrong—HS2 tends to slip out its documents just in time for debates, which I think is poor practice. In this case such poor practice is affecting people’s lives. Implementing a fair valuation process for property owners who are receiving unacceptably low offers from HS2 is of paramount importance.
I still have a large number of constituents who have been negotiating with HS2 for months to get a fair price for their property, and I know from colleagues that it is a similar story up and down the route. I have been appalled at the treatment of individuals, who have had to employ expensive lawyers even to get timely and rational answers from those employed by HS2 or from HS2 itself. My colleagues and I have raised these points for years, yet there continues to be a litany of errors from HS2. There have been internal emails that are rude and disrespectful about constituents. The Public Administration and Constitutional Affairs Committee report published earlier today refers to the Parliamentary and Health Service Ombudsman report, which accused HS2 of being guilty of maladministration. I believe that that has characterised the way in which HS2 has dealt with people who have lost their houses, their businesses and their land.
(9 years, 2 months ago)
Commons ChamberIf I may finish this point, I will then give way.
In addition, those areas of Government activity that are permitted by Parliament will be subject to guidance from the Prime Minister to Ministers and from the Cabinet Secretary to civil servants based on the purdah guidance issued before previous referendum campaigns. The Cabinet Secretary said in evidence to the Public Administration and Constitutional Affairs Committee that civil servants would not under any circumstances be permitted to support Ministers in doing things that Ministers were prohibited by statute from taking part in.
(10 years, 1 month ago)
Commons ChamberMy right hon. and learned Friend makes an important point. Those people have worked hard, saved and invested in those properties.
My right hon. Friend is making an excellent speech. Those of us who are between Birmingham and Manchester are extremely glad that we are going to have the opportunity to petition and to have our case heard by the High Speed Rail (London - West Midlands) Bill Select Committee, and we are grateful to her for everything she has done.
I thank my hon. Friend. I glad to see that the Chairman of the Committee, my hon. Friend the Member for Poole (Mr Syms), is in his place. I note that there are many hon. Members here tonight, and I welcome those who have just come into the Chamber. It is important to put these points to the Minister in as forceful a way as possible.
The home owner payment scheme proposes to give home owner payments to those living between 120 metres and 300 metres from the line. This once again limits compensation by distance from the line. It also does little to assist the functionality of the property market in affected areas. The payments on offer are too low and, as the effect of inflation is not considered, they might be inaccurate as well.
Like other colleagues, I have many farmers and landowners in my constituency, and none of the schemes properly addresses the impact of HS2 on them. I deal with a number of organisations, including the Country Land and Business Association and the National Farmers Union, that are campaigning hard to ensure that affected landowners receive fair and timely compensation, and I hope the Minister understands the special problems facing farmers and growers. He is a farmer himself, so I am hoping for that special understanding.
(10 years, 7 months ago)
Commons ChamberI am awfully sorry, but if I give way to the right hon. Gentleman I will have to give way to others, and so many people want to speak that I will eat into the time allowed to them. The right hon. Gentleman can make his own speech.
The Secretary of State for Transport claims that HS2 is essential to deal with an impending capacity crisis on the west coast main line. However, the available figures show that intercity trains on the west coast main line coming into Euston are on average just 52% full in peak hours. There is severe commuter overcrowding on many commuter lines into all our major cities, and HS2 will do very little, or in many cases nothing at all, to relieve that. Is the commute into Euston really the priority over other areas?
The big picture is the claim that HS2 will heal the north-south divide. Even today the Institute of Economic Affairs has again questioned the promises of an economic transformation of the north. There is no academic peer-reviewed evidence to show that the presence of a high-speed rail line will lead to increased economic output at the levels suggested in what is now a questionable report from KPMG, commissioned by HS2. The report claims that HS2 would bring benefits of £15 billion per year. However, it assumes that rail connectivity is the only variable driving local economic growth. We know that that is simply not the case; if it were, Ebbsfleet in Kent would be a boom town.
However, London could be the winner. The majority of academic evidence available in other countries shows that where a high-speed rail line connects a dominant city to a less dominant town or city, it is the dominant city that gains. HS2 will suck skills and businesses to London rather than to our regions. If HS2 had a viable business case, it should have been built starting in the north, connecting the northern cities to each other and then eventually to London.
We are getting a project that has markedly changed since it was first proposed. HS2 was going to allow someone to jump on a train in Manchester and travel straight to Brussels, but that has now been ditched. The direct link to Heathrow has of course now been dropped, but in any event why are we not going for maximum connectivity to our airports in the south by finalising our high-speed rail policy after the result of the Howard Davies commission?
My right hon. and learned Friend the Member for Beaconsfield would also like assurances from the Government on the so-called Heathrow spur, on which he still has many questions. Even the much vaunted connections between the towns and cities are far from perfect. In fact, HS2 connects only four city centres. The proposals for Euston are not settled and Old Oak Common will require an enormous amount of work to connect it to the rest of London’s transport infrastructure. The HS2 station in Birmingham is a 15 minute walk through an underpass to Birmingham New Street, where the rest of the city’s trains come in. If we look to the plans for Sheffield Meadowhall, Toton and Derby, the HS2 stations will be miles outside city centres. The latest business case included £8.3 billion of cuts to existing rail services, affecting many towns and cities, and the KPMG report showed that many local economies away from the line of the route would suffer. The main objective to shorten journey times drastically has now been questioned by calls from the Environmental Audit Committee to decrease average speeds. That means that HS2 may not even achieve its original aims on either speed or connectivity.
Finally, HS2 is not really green. A meagre 1% of HS2 passengers are predicted to transfer from air, and just 4% from cars. The remaining 95% of passengers are predicted to be new journeys or transfers from less polluting modes of transport, and that is before we examine closely the vast amount of power needed to power the railway. If the project goes ahead, it is important that we protect the environment and the people who will be affected. People expect the project to be implemented to the highest standards, ensuring the best environmental protections and giving support to the communities and individuals who are severely affected.
The Chilterns area of outstanding natural beauty is in my constituency, as everybody now knows. It is known as the lungs of London and is the last large expanse of protected unspoilt countryside in the south-east of England. There are more than 50 million visits annually, and many of the villages, hamlets, ancient woodlands and hedgerows remain largely unchanged since Norman times. The Chilterns is designated under the Countryside and Rights of Way Act 2000, and the Government have a legal duty to adhere to those protections: anything less would make a mockery of all the Government’s pledges to protect our natural environment.
The Environmental Audit Committee’s report of 7 April was highly critical of the project and said that the Government have “significant work to do” to prove that they are prioritising environmental protection. Some 40% of the route is yet to be examined. If the project does proceed, I now believe that the only way to mitigate properly the damage to the AONB is to fully tunnel the whole area. The demand for longer tunnelling through the AONB was the most frequently raised concern in the responses to the environmental statement, with more than 8,000 people raising it as an issue. The line will already have a devastating impact on the AONB, including destroying 10.2 hectares of irreplaceable ancient woodland, as well as communities such as South Heath and Wendover.
My right hon. Friend the Member for Aylesbury and I have worked together on considering HS2 and the long tunnelling option. He has said to me that if he is not satisfied with the arrangements for mitigation of the AONB and compensation, particularly where Dunsmore, Wendover Dean and Wendover are concerned, he will join me in the Lobby and vote against the project on Report and Third Reading. As it stands, Buckinghamshire will take all the pain and have no gain. My right hon. and learned Friend the Member for Beaconsfield has constituents in Denham who remain entirely unpersuaded by the arguments put forward both in respect of the generality of the proposal for HS2 and of the detail. The impact of the Colne valley viaduct travelling through a site of special scientific interest, with no details on how the noise will impact on the local community, is a source of real anxiety. His constituents have argued for further tunnelling under the Colne. It is important to remember that the voices of our Buckinghamshire colleagues in Government are as equally important as the voices of Back Benchers, if not more so. I want allies inside the Government, as well as on the Back Benches, as we scrutinise this project.
On compensation, we have had no fewer than five consultations and still those people whose homes and livelihoods have been devastated by HS2 have had to wait for over four years for the final compensation scheme to be announced. The eventual compensation announcement on 9 April was not popular. I know that the concerns are shared by Mr Speaker. He believes that the fact there is no provision for homeowners whose properties are further than 300 metres from the line but who have seen their property fall in value as a result, is unacceptable and so do I.
I am sorry.
People blighted by HS2 will not only be negatively affected by the line itself, but by the construction, noise, traffic, impact on our blue light services, decrease in tourism, and the disruption to our waterways; I need not go on. The effect of these has not been explored fully to any adequate degree.
Lastly, what worries me most, and what is in my reasoned amendment, is this: if the project goes ahead, this House should be aware of the risks. Many people are concerned at what I consider to be the wholly deplorable position of the Government in not publishing the Major Projects Authority’s reports into the project. The Information Commissioner is now challenging the veto placed on it by the Government in the courts and maintains that the release of the documents is in the public interest, as do I. The reports rate the project as amber/red, meaning that successful delivery is “in doubt” because of major risks or issues in key areas. The Government expect the support of Members to carry the Bill, so they should be expected to produce this information and make it accessible to Members of this House. All projects carry risk. It is unacceptable that we should not be aware of the risks when we are spending such vast sums of taxpayers’ money.
I will be voting for my reasoned amendment to halt the project and I hope that colleagues will join me in the Lobby. I know that many colleagues will abstain, but I hope that the vote tonight—even though this is David and Goliath and for once Goliath is going to win—will ensure that, as the Bill passes through Committee, our colleagues who are scrutinising it will be able to support the maximum environmental protection and compensation for those communities and people who will be paying the highest price for this project with their homes, businesses and local countryside. They will be gaining none of the benefit. Whoever joins me tonight in the Lobby, I am grateful for their support. I do not expect that we will win the vote, but my goodness we are giving notice to the Government, and any future Government in charge of this project, that it will be scrutinised inch by inch.
(11 years, 1 month ago)
Commons ChamberMy amendments are intended to probe the Government’s intention. I believe that they should have made provision to include more stops on the line. For example, I would have thought that between Manchester and elsewhere, there could have been other stops giving greater benefit to some of the areas that will be destroyed by the line.
I tabled an amendment in Committee, and it must have struck a chord, because the official Opposition have tabled something very similar, and I am delighted to say that the Government, in an attempt to hug the Opposition closer, have now signed up to it and it has become a Government amendment. I congratulate the shadow Secretary of State on her victory. One of the major problems is with the connectivity of HS2. If it is not fully connected and integrated into our transport system, it will be the white elephant that so many of us believe it will be.
I congratulate my right hon. Friend on tabling the amendment. It is not only the Opposition and the Government who need congratulating; she needs congratulating herself.
That is most gratifying. I am glad that my hon. Friend has observed the first rule of politicians: one can never over-flatter another politician.
Connectivity is at the heart of some of the failures of this project. For example, it does not go to Heathrow; it does not connect properly with the channel tunnel rail link; indeed, it does not even go into the centres of the cities it is supposed to serve, whether Sheffield, Derby or Nottingham. All the time savings claimed by the Government come to nought if travellers have to make their way from outside the city centre, as I know will be the case for Sheffield. We need to ensure that if this is ever built, the connectivity is as good as it can be.
(11 years, 5 months ago)
Commons ChamberI oppose this Bill on national and local grounds. I pay tribute to the people of Stone, Swynnerton, Whitmore and Madeley for the meetings we have had to discuss these matters, and I also pay tribute to the Country Land and Business Association and Stop HS2 for the back-up they have given at these meetings and in consideration of all these matters.
I oppose the Bill for many reasons. The route will cut a swathe right the way through my constituency from top to bottom. I also agree very much with the comments of my right hon. Friend the Member for Chesham and Amersham (Mrs Gillan) and my neighbour and good friend the hon. Member for Stafford (Jeremy Lefroy). I do not need to repeat their points. They have made them forcefully and so have many others, and they are right.
The reality is that my constituents gain no benefit from this whatever. As has rightly been said, it is all pain and no gain. The unfairness of the current arrangements is so gross that it has to be rectified; there is a complete failure to understand that in the 21st century we must have a proper compensation arrangement if this Bill is to go through, as many predict.
I do not believe that the comments of the Public Accounts Committee can be in any way disputed, and as for the question of the amount of money involved, that is the biggest white elephant of all time. As has been noted, the amount has already gone up to £50 billion-plus, and I will not be surprised if it is £75 billion by the time this is finished. The reality is that this is a very expensive operation that is blighting people’s homes already in a way that is completely unfair, and it deserves to be discarded.
On the question of compensation, the arrangements favour the acquirer so much against the claimant, and they do not even say how the compensation is to be calculated. As for the exceptional hardship scheme, three quarters of the applications have been rejected, as the Minister knows, and compensation is available only through a discretionary scheme.
Does my hon. Friend agree that there is nothing in this Bill that either pushes forward any compensation scheme or stops the Government continuing to pay compensation, and what we really want is the new consultation on compensation, which I hope the Department will launch as soon as tomorrow or the next day?
I could not agree more. The fact is that the current arrangements for compensation are wholly inadequate to deal with this unique—and, I believe, appalling—scheme.
We are also now pressing for a property bond scheme, which would underwrite the property values where this project has an adverse impact. That needs to be set up. Members will know that it is fear of the unknown that has the greatest impact on the property market. A property bond scheme would create stability in the market, and the idea has already been propagated by the BAA and Central Railway. The ideas are out there, and amendments will doubtless be tabled in Committee to show how such a scheme could work in practice; the argument can be made in more detail then.
As far as I am aware, this scheme has no support whatsoever in my constituency. I have held many meetings in packed rooms and overflowing halls. At the end of them, I have asked, “Does anybody agree with the proposed scheme?” Only one person, who I think was from HS2 Ltd himself, said yes. The amount of very sensible opposition to the scheme is amazing.
The west coast main line is a very good service. My hon. Friend the Member for Stafford hit the nail on the head: it is available and can be improved. Extensions can be made to Euston to improve the availability of the service.
The bottom line is that the whole scheme should be rejected. I shall vote against it with absolute determination tonight, and if we lose, we move on to the compensation arrangements. In fairness to the people who have been completely blighted and whose lives have been destroyed, we must have a property bond and proper arrangements. It is disgraceful.