Debates between Baroness Wheeler and Earl Howe during the 2017-2019 Parliament

Tue 3rd Sep 2019

Parliamentary Buildings (Restoration and Renewal) Bill

Debate between Baroness Wheeler and Earl Howe
Baroness Wheeler Portrait Baroness Wheeler (Lab)
- Hansard - -

My Lords, we welcome the Government’s amendments in this group, and their focus on public engagement and awareness. Amendment 1 creates a duty on the sponsor body to promote public understanding of restoration and renewal, while Amendment 2 introduces a need for the sponsor body to ensure the works facilitate engagement and a participatory democracy. Amendment 5 ensures that the sponsor body carries out its duties with the views of Members, staff and the public at the front of its mind. We also welcome Amendments 3 and 4, which strengthen the reference to the parliamentary building works in regard to ensuring the safety and security of staff and the public, as well as to educational facilities.

At the start of the Bill’s passage, one of the main areas on which we sought government reassurance was engagement with the public, as well as with staff and Members in both Chambers. The Joint Committee recommended that the sponsor body should,

“promote public engagement and public understanding of Parliament”,

and we are pleased that the Government now fully accept this. Engagement must be at the heart of the programme of restoration and renewal, as this Palace, as well as the democratic processes and structures it represents, can often feel very distant to many people across the country. It is vital that there is a strong relationship between the sponsor body and the public, so that they have confidence in the programme throughout the process. These amendments help to alleviate our concerns and ensure that restoration and renewal becomes about far more than the necessary bricks and mortar, rewiring and replacement, and sewerage and stairways. They also allow us to change the way Parliament looks and feels, both inside and out.

Like other noble Lords, we read with great interest the results of the 2019 Members survey on R&R, confirming the themes and issues raised during the passage of this Bill in both Houses on accessibility, remote and digital integration, and safety, security and protection. The first survey showed just how vital regular communication, consultation and engagement are now and will be as the programme progresses to its successful completion. In particular, this is a working building for more than 8,000 members of staff, and the omissions in the original Bill on the importance of seeking their views about the works have now been rectified. Amendment 5 is a welcome step forward in helping improve their working conditions throughout restoration and renewal, and this must be an aim for the sponsor body.

In closing, I of course pay tribute to my noble friend Lord Blunkett for his tireless work on these issues throughout the Bill’s passage, and to the Government for their willingness to discuss and address our concerns and arrive at the good place to which the Minister referred.

Earl Howe Portrait Earl Howe
- Hansard - - - Excerpts

My Lords, I am most grateful to the noble Lord, Lord Blunkett, for his very kind remarks and the constructive suggestions he has made. I express once again my appreciation to him for working with us as he has done and for the support he has demonstrated for these amendments. I am grateful, too, to other noble Lords who have endorsed the approach that we and the noble Lord have taken. It has been important throughout the Bill’s passage that we should listen to all Members and, where possible, seek to work with them towards an agreed position. I hope and believe it is clear that we have done exactly that. I thank other noble Lords who have spoken in the debate: my noble friends Lord Norton, Lord Cope and Lord Haselhurst, and the noble Baronesses, Lady Scott and Lady Wheeler.

My noble friend Lord Haselhurst asked two questions that go back to the issue, which I know has been considered by both Houses, of whether it would be possible to retain a foothold, so to speak, during the R&R programme in the Houses of Parliament regarding Westminster Hall and the Elizabeth Tower. I can tell him that these matters were partly covered at earlier stages of our debates, but it was agreed by both Houses in early 2018 that the Bill should allow for a full and timely decant of the Palace without retaining a foothold. Analysis by the programme in 2017 found that continued use by Members and/or the public of Westminster Hall or the area surrounding it would be highly disruptive and costly for no additional quantifiable benefit. The costs would be connected to maintaining a secure perimeter in close proximity to construction works and the additional cost to construction from managing a complex and partially occupied site. Having said that, access to the Elizabeth Tower could be a different matter. In fact, it is a matter for the sponsor body and Parliament to decide in due course. Members of the other place and noble Lords will be free to offer their view to the sponsor body on this issue as part of its consultation strategy.

As I said, these amendments build on the current work the shadow sponsor body is undertaking in these areas, in my judgment very capably. What matters now is the future. Like all noble Lords, I look forward to seeing how the sponsor body builds on this work and fulfils the specific obligations the amendments set out.

--- Later in debate ---
Baroness Wheeler Portrait Baroness Wheeler
- Hansard - -

My Lords, we welcome and fully support the principle behind Amendment 8, which underlines that the work should be carried out without delays and must be cost effective. The sponsor body has said it expects the current timeline for the project to be around 10 years, from the mid-2020s to the mid-2030s. Of course, there remains some vagueness around this length of time, and we hope the sponsor body is able to provide a more detailed timeline as soon as possible, with some clarity on milestones and gateways for both the decant and the completion of the full works. Obviously, this will most likely come after the business case has been presented and discussed by Parliament. Nevertheless, providing clear information on timelines and milestones will most certainly be important for public engagement and the engagement of staff and Members. We very much support this amendment.

Earl Howe Portrait Earl Howe
- Hansard - - - Excerpts

My Lords, I am grateful to the noble and learned Lord, Lord Wallace of Tankerness, for his amendment, which would require the sponsor body’s reports on the progress made on the parliamentary building works to incorporate a timeline for the works that would include likely dates for decant and completion. As the noble and learned Lord said, he tabled a similar amendment in Committee, to the effect that as part of its consultation strategy the sponsor body must publish a timeline for completion of the Palace restoration works, including details on the dates of decant and return to the Palace.

In my response in Committee, I agreed that all noble Lords would—quite obviously—wish to seek further clarity on dates around decant, and I am in absolute agreement with the noble and learned Lord’s point that the sponsor body should publish details regarding decant and completion of the works not just once but throughout the course of the project. Here it is important to convey that the shadow sponsor body has always explicitly recognised that, as part of the sponsor body’s reports as set out in paragraph 27 of Schedule 1, it would rightly be required to include timescales on decant and the progress of the works. I can confirm that the shadow sponsor body is in agreement with this approach and therefore the expectation is that the reports produced by the sponsor body will include information on the timetable for the works, including details on timings for decant and return to the Palace.

I spoke at some length in Committee on various points addressing the issue raised by the noble and learned Lord. However, I thought it important to clarify what the Bill requires the sponsor body to do as regards reporting. Under the Bill, the delivery authority is required to formulate proposals for the parliamentary building works, including the timing of those works. These proposals are provided for in Clause 2(2)(e). Parliament will need to approve the proposals before any substantive works commence. If for any reason those timings change significantly, the sponsor body will need to come back to Parliament for further approval. The parliamentary approval of these proposals, as well as the shadow sponsor body outlining its agreement that the sponsor body should include information relating to the timeline for the works in reports it produces, will, I hope, provide noble Lords with the reassurance that this information will be forthcoming.

This is a matter that will surely interest all noble Lords throughout the currency of the works, whether that is before commencement, during or near their completion, so let me again thank the noble and learned Lord for tabling this amendment. I hope that I have provided him with significant reassurance on this important matter.