Read Full debate High Speed Rail (West Midlands-Crewe) Act 2021 View all High Speed Rail (West Midlands-Crewe) Act 2021 Debates Read Hansard Text Read Debate Ministerial Extracts Amendment Paper: HL Bill 142-R-I Marshalled list for Report - (25 Nov 2020)
The distance of phase 1 of HS2, from London and Birmingham, was about 120 miles, while the distance of 2b, from Birmingham Interchange up to Leeds, is about the same. Some people might think that it goes through virgin countryside and it does not matter, but that is total rubbish. It goes through many conurbations; many people are interested in being able to use the line or improved lines that connect in with it. From what I have seen of the time it takes to prepare hybrid Bills—I am sure my noble friend Lord Adonis would agree—I think that, if you have not yet decided on a route, to publish a Bill in six months is pushing it. If the Minister says, “Well, it’s got to be done in stages and we’re not ready for the whole thing,” on this occasion I would support that. I want something done to improve the lines, but to do it all in six months without any proper consultation even having started would be a little optimistic.
Baroness Randerson Portrait Baroness Randerson (LD) [V]
- Hansard - -

My Lords, we received a useful briefing from HS2 prior to this debate. The final sentences read:

“Legislation to complete the Western leg of HS2 into Manchester is expected to come forward in 2022. Extending the line to Crewe is the first step to making this happen.”


There is a total absence of any reference there to the eastern leg. Other speakers have talked about the regenerative impact of HS2. This has already been demonstrated in Birmingham despite the line not being built yet. It is already a hotspot for inward investment, with high-quality jobs being created in major banks—HSBC and Deutsche Bank—as well as, importantly, in Jacobs Engineering.

The Government’s election rhetoric on levelling up won them seats in the north-east, and HS2 is an essential part of that. It is integral to delivering the plans of both the northern powerhouse and the Midlands engine. That means the whole of HS2; as the noble Lord, Lord Adonis, said, without the eastern leg it will be unable to improve the transport links across the country and to create new freight capacity.

This is all essential if the Government are to be able to decarbonise our transport system. Much more important than higher speeds is the capacity that HS2 will unlock. Only a very small percentage of commuters currently use rail in the north of England. For example, 7% of people commuting from Liverpool to Manchester, and 3% going from Hull to Sheffield, use rail. That is because services are slow and unreliable. HS2 will provide additional capacity on existing lines by freeing them up to enable faster, modern trains to provide many more services. Trains are the most carbon-efficient mass transport system available.

Existing rail freight services are far too slow. Freight is the most challenging part of our transport system to decarbonise. Road freight accounts for 5% of our nation’s CO2 emissions, so it has to be tackled. For example, it now takes 11 hours to send freight by rail from Liverpool to Selby, for the Drax power station. That is an unrealistically long time. It takes only three hours to take the same load by road. The Government cannot hope to improve productivity and create well-paid jobs in the north, while meeting our climate commitments, without revolutionising the infrastructure of the region. HS2 is the key to that—freeing us from reliance on a 19th-century rail system that is literally buckling under the strain.

What we need from the Minister today is a firm and unequivocal commitment to the eastern leg, with a timeframe that puts it on an equal footing with the west. We will be listening very carefully but, much more importantly, the people of the north-east are listening. They will not forgive, or forget, any attempt to renege on election promises. As noble Lords have made clear this afternoon, the case for the eastern leg has been made perfectly over the years. It is now well overdue for work to start on the details of this project.

Lord Rosser Portrait Lord Rosser (Lab) [V]
- Hansard - - - Excerpts

I do not intend to repeat all the points made so persuasively by my noble friend Lord Adonis and other noble Lords in support of his amendment. The Conservative Party manifesto for the 2019 election said that:

“HS2 is a great ambition”,


but, as we all know, great ambitions are not always realised in full. The manifesto went on to say that HS2,

“will now cost at least £81 billion and will not reach Leeds or Manchester until as late as 2040.”

Continuing, the manifesto said that:

“We will consider the findings of the Oakervee review into costs and timings and work with leaders of the Midlands and the North to decide the optimal outcome”.


In other words, there was no unambiguous commitment in the 2019 manifesto to complete HS2 via the East Midlands to Leeds, since the “optimal outcome” was dependent on government consideration of the findings of the Oakervee review into costs and timings.

In Committee, my noble friend Lord Tunnicliffe invited the Government to commit to building HS2 phase 2b to Leeds in full. In reply, the Government said that:

“Plans to provide the benefits of high-speed rail to the east Midlands, Yorkshire and beyond will be confirmed following the publication of the integrated rail plan”,


and,

“that a properly connected line from the Midlands up to the North will be a key part of the HS2 project.”—[Official Report, 9/11/20; col. GC 351.]

As we know, that reply was not a commitment to build HS2 phase 2b via the East Midlands to Leeds in full.

It would thus be helpful if the Government could clarify in their response what the phrases,

“plans to provide the benefits of high-speed rail to the east Midlands, Yorkshire and beyond”,

and,

“a properly connected line from the Midlands up to the North will be a key part of the HS2 project”,

actually mean. Do they mean that the Government are committed to building HS2 phase 2b via the East Midlands to Leeds in full, or do they mean not that the high-speed line will be built the whole way from Birmingham via the East Midlands to Leeds but that HS2 services could, for all or part of that journey, run over existing routes calling at existing stations?

The indications are that the Government are either looking to abandon or scale back the eastern leg of HS2 through to Leeds or, at best, seriously delay its construction and completion. The lack of a clear commitment to the HS2 project in full calls into question the Government’s declared commitment to levelling up, since the eastern leg is just as vital as the delivery of the western leg. Levelling up cannot just mean levelling up the north-west and the West Midlands. It is just as vital to communities in the East Midlands, Yorkshire and the Humber and the north-east. Indeed, only proceeding with the western leg would leave the cities and areas that would have been served by the eastern leg at a disadvantage.

The Government now have the opportunity to put to rest any concerns over their commitment to the eastern leg by saying, in their response today, that they are committed to the construction and bringing into operation of HS2 phase 2b to Leeds via the East Midlands in full, and giving the date by which they intend it will be completed. The Government can also accept the terms of this amendment. We will now have to see if they intend to take that opportunity. It will be for my noble friend Lord Adonis to decide whether he is satisfied with the Government’s response but, if he does decide to call for a vote, we will be supporting him.

--- Later in debate ---
Lord Liddle Portrait Lord Liddle (Lab) [V]
- Hansard - - - Excerpts

My Lords, I have little to add on this amendment, except to say that the amendments tabled by the noble Lord, Lord Rosser, which call for investigating the possibility of the railways as a means of getting workers to HS2 sites, are well worth considering. I hope the Minister will respond positively to them.

Baroness Randerson Portrait Baroness Randerson (LD) [V]
- Hansard - -

My Lords, I raised in Committee the issue of burial grounds and monuments, and the way in which they are dealt with. I made it clear that mine was a probing amendment, and that my interest was in ensuring that there was encouragement for really good practice in this context. I am glad that the noble Lord, Lord Randall, has taken the opportunity to take the issue further, because undoubtedly the modern, environmentally friendly, way of creating a memorial frequently includes trees. I shall listen carefully to the reassurances that I hope the Minister will be able to give us.

Lord Tunnicliffe Portrait Lord Tunnicliffe (Lab) [V]
- Hansard - - - Excerpts

My Lords, I have little to say on these amendments, other than to make a general comment on the subject of burial grounds and so on. It seems to me that the intent in HS2 Phase 2a Information Paper: Burial grounds is appropriate. There are some useful words about how things should go ahead, and it says:

“Any human remains affected by the Proposed Scheme will be treated with all due dignity, respect and care.”


As ever, with the relationships between HS2 and the wider community, the whole issue is a cultural one. If, working within these guidelines, HS2 is constantly positive in seeking solutions, there will be no problems. But if it hides behind officialdom, there may be problems. I would be grateful if the Minister could give us some indication of how the Government will hold HS2 to account with regard to the tone and culture of the relationship between it, the wider public and, in particular, the representatives of the public in this sensitive area.

--- Later in debate ---
Lord Berkeley Portrait Lord Berkeley (Lab)
- Hansard - - - Excerpts

My Lords, this is an interesting amendment. I shall just concentrate a very few remarks on proposed new subsection (2)(c) and (d). The first thing to say is that I do not think that anybody is serious in expecting them to build extra stations on phase 2a. Crewe is a very good junction and it must involve, possibly on other lines, building extra stations if it can be justified.

As part of the Oakervee review, I also, with the team, visited Crewe. I think the Select Committee went there as well. It brings into focus the fact that the Select Committee quite rightly looks at local things and people’s concerns, but who looks at what one might call the regional connectivity? I will give one example. We were sitting in the office in Crewe talking to HS2 and Network Rail representatives and it became quite clear that the design of HS2 to go through Crewe station was effectively preventing even an hourly service from Shrewsbury through Crewe to Manchester because of the point layout. I got the impression that HS2 did not care at all about that. Network Rail said, “You’re stopping us doing even what we can do at the moment with difficulty”. I do not know where that should be discussed, or whether it should be in a report, as the amendment proposes, but there ought to be an opportunity to discuss it. It is not a matter for petitioning, but I will be interested to hear what the Minister will say about it.

Baroness Randerson Portrait Baroness Randerson (LD) [V]
- Hansard - -

My Lords, I have added my name to Amendment 4 because HS2 has come in for criticism about the quality of its consultation with local residents. Although it has impressed on us how much it has improved, I am sure that there is probably still some way to go. I am particularly concerned about the impact of the construction process, which may not be obvious to either HS2, or to local residents, before it starts. Construction of a project of this size and this kind is not a transitory process, in that it will impact on some communities for years. It is not like your next-door neighbour building an extension, where it is bad for a few months but then the disturbance goes away. This could last for years.

The amendment specifies traffic and the impact on the environment. Although both issues were raised in Committee, we still need some answers from the Minister. We have heard a lot, and will hear more today, about the impact on ancient woodlands, but other aspects of the environment are of equal importance, for example wetlands. The amendment also includes an important reference to new links to HS2 itself. I am not suggesting—it never occurred to me—that that means stopping on the way, as that obviously would be a very slow way to run a high-speed railway. Treated properly, HS2 will be the catalyst for a widespread upgrading of our existing Victorian railways. I was taking this amendment to mean improving links into HS2, to the stations that have been specified.

Amendment 8, which is in my name, is also in this group. It specifically refers to that aspect. It provides for an annual review of connectivity in our rail network and the impact of HS2 on that. I have already spoken this afternoon about the importance of using HS2 to unlock capacity to allow more intensive use of existing lines by commuters and for other local journeys, as well as to provide room for the transfer of freight from road to rail. The northern powerhouse and Midlands Connect rely on that. I suggest that progress on this needs annual review because the Government—any Government—need to be kept under pressure to maintain the momentum for change. The review is to be laid before Parliament within six months of its completion. Once again, that is to avoid backsliding.

There is also a provision so that the impact of the pandemic is taken into account. This is specifically to address the impact on demand for public transport, which has clearly fallen sharply in recent months, largely because people are worried about safety, although public transport providers have made huge efforts to ensure it is safe. However, demand will return, albeit maybe in a different pattern which providers will have to adapt to. Anyone who thinks that we will suddenly not want to travel has misjudged human nature and failed to take the lessons of history. I am keen that above all we encourage people back to travelling by rail. There has been a lot of discussion about building back better, and part of that is ensuring that new services are fit for the future, and ensuring that HS2 is the catalyst to enable future UK Governments to deliver on climate objectives, by taking cars and lorries off the road and replacing planes with trains.

Baroness Vere of Norbiton Portrait Baroness Vere of Norbiton (Con)
- Hansard - - - Excerpts

My Lords, I will address these amendments, how they are worded and what their consequences would be, because I am not sure that that fully came out in this debate, which was much shorter than I had anticipated. When I first looked at this speaking note on Saturday, it had 2,585 words. This is not to suggest that I intend to bore your Lordships into submission but to illustrate that there has been a huge amount of consultation, and that there is a huge amount to say about it.

The amendment tabled by the noble Lord, Lord Rosser, would mandate just one more round—like one more wafer-thin mint—as if it might yield what? Would it yield different results to previous consultations, when works have not even started, and impacts are not yet being felt? I agree with what I think lies behind the noble Lord’s amendment: that HS2 Ltd must engage with and consult local communities, not once, not twice, but on an ongoing basis, before, during and after the project. I have condensed 20 minutes of words into something slightly less, but I warn noble Lords that there is still a fair amount to say.

I have a huge amount of respect for the noble Lord, Lord Rosser, who is exceptional in his diligence and one of the hardest-working Members of your Lordships’ House, but I was saddened that just a few examples were being used to show that the entire consultation process therefore has not worked. That is not the case. The noble Baroness, Lady Randerson, also said something like, “Well, I hear reports that consultation hasn’t gone brilliantly.” If there are specific concerns about lack of engagement, I encourage any noble Lord to bring them forward to Minister Stephenson. We will build this project successfully if engagement happens before, during and after the project. We have a way forward, and therefore the amendment tabled by the noble Lord, Lord Rosser, is not needed; nor would it even be helpful to the progress of the Bill, I am afraid.

Ten years ago, there were consultations that led to the initial identification of the preferred route. Five years ago, further consultation carved out phase 2a as a separate project to bring the benefits of HS2 to Crewe sooner. That led to the further round of consultations. In spring 2016, HS2 Ltd undertook a consultation on the scope and methodology to be used in producing phase 2a’s environmental statement and equalities impact assessment. In September 2016, HS2 Ltd launched consultations on the phase 2a working draft environmental statement and the working draft equalities impact assessment. At the same time, the phase 2a design refinement consultation was conducted by the Department for Transport. These consultations were open to everyone, including the people of Staffordshire, Shropshire and Cheshire, and were publicised widely by letter, email, notices in local newspapers, posters in doctors’ surgeries and libraries, press releases to local media and, of course, social media.

The consultations included information about the impacts on the natural environment, including ancient woodland. They included information about construction routes and road diversions and closures, so that people could understand what might happen to their local roads and transport infrastructure. They included alternative options and asked for feedback. The consultations closed in November 2016. The responses were collated, taken into account and, where relevant, design changes were made. The report on all that work was published alongside the deposit of the phase 2a Bill in July 2017. It took over a year, but that is not all.

--- Later in debate ---
Baroness Randerson Portrait Baroness Randerson (LD) [V]
- Hansard - -

My Lords, fighting climate change is a giant carbon calculation, and HS2 is firmly on the plus side. Rail is the most carbon-efficient form of transport and, in 2017, the transport sector overtook the energy sector as the UK’s largest carbon emitter. This debate has produced some extremely interesting and very expert speeches. They have revealed the complexity of the issue because those who know a great deal about these issues do not agree with each other.

On Amendment 5, HS2 itself claims that more than 33 square kilometres of new and existing wildlife habitat will be created or improved. That is a 30% addition compared with what is there now, and I hope the Minister can reassure us that this is accurate, that HS2’s claims are accurate and that there will be a substantial biodiversity net gain.

Turning now to Amendment 6, I read the committee’s report with great interest, and I have just re-read it while listening to this debate. HS2 says that 0.005% of ancient woodland will be affected by its project. As the committee noted, “ancient woodland” does not necessarily mean old trees, but rather that woodland has existed for a long time on that patch of ground. Some such areas were replanted after the two wars and were not necessarily planted with native species, so ancient woodland is not an amorphous mass of very important sites. There are varying levels of importance. Obviously, any loss is significant in terms of ecological diversity, but it is worth pointing out that new, young trees are more efficient and vigorous in dealing with climate change. Avoiding ancient woodland entirely would mean more tunnelling, which produces spoil which, in itself, destroys habitats when it has to be dumped somewhere. The tunnelling process creates noise and local disruption for residents and in itself creates carbon because of the vehicles that are dumping the spoil. It is not quite as simple as it sounds.

I have some sympathy for Amendment 7 and Amendment 11. It is, however, as noble Lords have capably illustrated, on an extremely complex subject. Trees sourced from the UK are most likely to succeed, and they avoid the importation of diseases, which have repeatedly caused serious problems in our landscape. Of course, diseases also come to this country through other routes. I hope the Minister can reassure us that this work is being undertaken by HS2 and will continue to be.