Procurement Bill [ Lords ] (Ninth sitting) Debate
Full Debate: Read Full DebateAlex Burghart
Main Page: Alex Burghart (Conservative - Brentwood and Ongar)Department Debates - View all Alex Burghart's debates with the Cabinet Office
(1 year, 10 months ago)
Public Bill CommitteesI thank my hon. Friend for that really valid point. It is important that we look at what has happened. Over the years, there have been many examples of outsourced services in which staff working conditions have been eroded and staff pay has not kept in line with inflation. The situation that we are seeing now is that staff are walking—they are voting with their feet and choosing to lose a day’s pay by going on strike. That is a result of some areas of outsourcing. From catering to social care, from cleaning to IT and HR services, almost no area of public services has been left untouched.
Too often, outsourcing is accompanied by deterioration in the pay, pensions and terms and conditions of the staff delivering the service. That almost creates a two-tier workforce of directly employed staff working alongside contractor staff, as well as a two-tier workforce within the contractor. The Transfer of Undertakings (Protection of Employment) Regulations can offer some limited protection for staff who are transferred to an outsourced contract, but staff recruited by the contractor after transfer have no such protection. Those inferior conditions can translate to lower costs for contractors, which can play a crucial role in their offering a cheaper tender and winning contracts.
A major flaw of this model is that it creates a false economy. The cost of the service is superficially low, but over time, staff have to claim universal credit. People retire without enough to live on and have to claim pension credit. Lower pay and insecure work have a negative impact on mental health. The decline in the number of decent public sector jobs in the community has a chilling effect on the local economy. The dots are not joined and the wider economic costs not considered.
In some regards, the supposed benefits of outsourcing have been eroded by the reality of contracting out services in recent years. There has been a notable turn towards insourcing—the process by which a public authority takes a service that has been contracted out and brings it in-house to be delivered by directly employed staff. However, we are still a very long way from the presumption that services should be outsourced only if it can be shown that the work cannot be delivered just as effectively in-house. Hundreds of thousands of carers, cleaners, porters, security staff and catering staff in our public services workforce are among the worst-off and most insecure workers in the UK.
Creating a check on such practices should be an objective of the Bill. That could be achieved through a public interest test to require contracting authorities to think holistically and outsource public services only when it is demonstrably in the public interest and when a robust assessment provides clear evidence that the services could not be better delivered in-house.
If a contracting authority is considering outsourcing public services that are currently delivered in-house, or where contracts are due for renewal, it should ensure that outsourcing or re-contracting passes a pre-procurement test and provides greater public value than direct service provision. The new clause would require the contracting authority to
“demonstrate to the public, service users and its employees that it has thoroughly assessed the potential benefits and impact of outsourcing the service in question against a public sector comparator with assessments being based on criteria to be set by the Secretary of State from time to time, including taking a five year consideration of—
(a) service quality and accessibility;
(b) value for money of the expenditure;
(c) implications for other public services and public sector budgets;
(d) resilience of the service being provided;
(e) implications for the local economy and availability of good work in relevant sub-national labour markets;
(f) implications for public accountability and transparency;
(g) effect on employment conditions, terms and standards within the provision of the service to be outsourced and when outsourced;
(h) implications for public sector contributions to climate change targets;
(i) implications for the equalities policies of the contracting authority and compliance with the public sector equality duty.”
Importantly, the public interest test would take place pre-procurement, and not all services subject to the test would eventually go to market. To increase transparency around those services that enter into the procurement process, the Bill should mandate information about outcomes of the associated public interest test to be published.
Under the new clause, the contracting authority and the provider of the outsourced service would also be required to
“monitor the performance of any contracted service against the public interest test and the stated objectives set by the contracting authority pre-procurement to demonstrate that outsourcing the service in question has not resulted in a negative impact on any of the matters mentioned in subsection (2)(a) to (i).”
Labour is clear that we would run the biggest programme of insourcing for a generation. We recognise the value offered by those delivering outsourced services, but we have concerns about the current scale of outsourcing. New clause 3 would lay out a clear test for outsourcing, ensuring it is done only when it is in the interests of the public, and that we do not hand out public services on the cheap.
We must create a culture of value for money throughout the public sector and avoid waste wherever we can. We believe that the new clause would help to create that culture. I hope that the Minister will give it due consideration and support it.
It is a pleasure to serve under your chairmanship once again, Mr Mundell. I can feel an air of excited sadness in the room because there is a possibility that the Committee may finish its consideration of the Bill today.
May I begin with a small correction relating to remarks that I made on 2 February when discussing dynamic markets? I stated that the current regime for dynamic markets does not remain open for new suppliers to join at any time. I was confused when I was talking about that; I was talking about the new provisions that we are making for open frameworks, where it is now possible for people to jump on. I just wanted to put that on the record.
New clause 3 would require contracting authorities always to undertake a public interest test when considering whether to outsource or continue to outsource a public sector service. Following the collapse of Carillion in January 2018 and the ongoing difficulties of some companies in the outsourcing sector, the Government’s commercial function undertook a review of what we outsource, why we outsource and how we outsource. It concluded that
“when done well, the private sector can bring efficiency, scale and fresh thinking to the delivery of public services.”
In February 2019, we published the first sourcing playbook, which captured key policy reforms for better outsourcing that contracting authorities should follow when considering how best to deliver Government services. This applies whether the contracting authority decides to outsource and deliver a service in partnership with the private and third sector, insource and use in-house resources, or do a mixture of both. That includes carrying out a make-versus-buy assessment, now referred to as a delivery model assessment, which is mandatory for central Government services in certain situations, such as the introduction of new public services or where there is a need to re-evaluate an existing service, for example because of a deterioration in the quality of delivery. It is important to emphasise that the playbook supports a range of delivery models that should be carefully considered as part of a mixed-economy approach to service delivery.
As well as in-house delivery and outsourcing, different models, such as grant making, may also be available. Hon. Members will recall that when I spoke on clause 3, I referred to the types of contracts regulated by the Bill. In particular, contracts must be for pecuniary interest, which can encompass monetary and non-monetary consideration. Contracts merely for the reimbursement of costs and without further remuneration or other direct benefit to the supplier are not covered. We do not, for example, intend the regime to capture contracts for the deployment of grants.
The sourcing playbook, which is now in its third iteration, builds on policies set out in the first sourcing playbook and is a more agile and appropriate place for this type of provision. I recently met the Business Services Association, which was extremely supportive of the playbook approach.
The tests set out in the new clause would be hugely burdensome for any contracting authority every time it is considering outsourcing or re-letting an already outsourced service. For that reason, I ask that the new clause be withdrawn.
I understand the Minister’s hesitancy about supporting the new clause, which he claims is because of bureaucracy. Does he recognise that many local authorities and others are conducting a big wave of insourcing, including my local authority, Lambeth Council, which decided last year to bring back its cleaning and maintenance service? The feedback from residents was that the contractors providing the outsourced service were not delivering, so the council has now brought it back in-house.
A number of local authorities under different political parties are following in the same vein. The new clause would help us to help them to look at the key issue of value for money and ensure that every pound spent on contracts delivers value for money. The new clause is not about extra bureaucracy, but about taxpayers’ money being spent on the right contracts. Does the Minister agree that the new clause would help those organisations to do that?
The hon. Lady gives a very good example of how the existing regime allows for outsourcing. We are building on that: the playbook that I described is there to help all contracting authorities to make better decisions about whether they want to outsource or to keep things in-house. She is quite right that there are circumstances in which keeping things in-house is a very good thing, but we feel strongly that the new clause would create a series of unnecessary requirements when the tools to insource are already at the disposal of authorities.
Question put and negatived.
New Clause 5
Carbon reduction plans
“(1) Subject to subsection (4), contracting authorities must obtain, assess and publish a carbon reduction plan from all suppliers under consideration for qualifying contracts before entering into a public contract with any supplier.
(2) In this section, ‘qualifying contract’ means—
(a) a public contract with an average value of more than £5 million per annum (excluding VAT) over the duration of the contract,
(b) any contract to be awarded under a framework agreement anticipated to be greater than £5 million per annum (excluding VAT) in value, or
(c) any contract to be awarded by reference to a dynamic market which is anticipated to be greater than £5 million per annum (excluding VAT) in value.
(3) For a qualifying contract of the type referred to in subsection (2)(a), a ‘carbon reduction plan’ must contain—
(a) the supplier’s current greenhouse gas emissions,
(b) confirmation of the supplier’s commitment to achieving net zero greenhouse gas emissions by 2050 for their UK supply chain, operations, products and services,
(c) intermediate targets for reductions in their greenhouse gas emissions at no more than 5 year intervals, beginning with the date of award of the contract,
(d) as far as they are able, the greenhouse gas emissions attributable to performance of the contract,
(e) as far as they are able, targets for reductions in those greenhouse gas emissions, and
(f) other environmental management measures in effect which will be applied when performing the contract.
(4) For the qualifying contracts of the type described in subsection (2)(b) and (2)(c), a carbon reduction plan should contain the matters specified in subsection (3)(a), (b) and (c) only.
(5) In complying with requirements imposed by the regulations, a contracting authority must have regard to guidance prepared from time to time by an appropriate authority.
(6) ‘Greenhouse gas’ has the meaning given in section 92 of the Climate Change Act 2008, and ‘emissions’ has the meaning given in section 97 of that Act.”—(Florence Eshalomi.)
This new clause would require company-level carbon reduction plans for bidders for certain larger contracts, including information and targets from suppliers on the emissions attributable to the performance of the contract. It also specifies that the Carbon Reduction Plan must be a key performance indicator for certain contracts.
Brought up, and read the First time.
New clause 5 would introduce carbon reduction targets for certain large contracts, in general those worth £5 million or more. The new clause is inspired by the Government’s own procurement policy note 06/21, which outlines their intention to take into account suppliers’ plans to reduce carbon emissions when considering large contracts.
Climate change is the biggest threat we face as the human race. Everyone in this room must recognise and agree that we need to reduce emissions urgently if we are to avoid this crisis. We must not ignore or under-appreciate the impact that reforms to our procurement system will have on our carbon emissions. However, I fear that the Bill is a missed opportunity to deliver real change in environmental standards in the procurement system.
That is particularly true considering what the Government have already chosen to remove from the Bill. Removing amendments on social value and the procurement policy statement, for example, that would have incorporated emissions will do nothing to tackle climate change in our procurement system, and there is hardly anything else in the Bill to drive real progress on carbon emissions.
New clause 5 would require contracting authorities to obtain carbon reduction plans from suppliers for contracts above £5 million per annum. In 2021, the Government implemented a procurement policy that required suppliers to provide carbon reduction plans when bidding for major Government contracts. The new clause would limit opportunities to amend and improve the policy as our ambition to achieve net zero progresses.
I assure the Committee that contracting authorities will continue to be able to take account of suppliers’ net zero commitments and carbon reduction plans, environmental targets, and climate change where they are relevant to the subject of the contract. The Bill and our existing policies already allow that in individual procurements, which is absolutely in line with the Government’s commitment to achieving net zero by 2050.
A key Government commitment is to encourage small and medium-sized enterprises into the Government supply chain. We are of course mindful of the impact that policy and legislation have on suppliers. The purpose of the Bill is to reduce unnecessary regulatory burdens in the procurement regime to support SME suppliers in winning Government contracts. In our view, contracting authorities are able to deal with these matters as it stands, and we will not be supporting the new clause.
Question put, That the clause be read a Second time.
I beg to move, That the clause be read a Second time.
The new clause would disapply section 31(2A) of the Senior Courts Act 1981 where a breach of non-discrimination occurs under clause 89 and is caused by a representation to the contracting authority by a Member of Parliament, a Member of the House of Lords or a senior civil servant. In practice, this would ensure that relief is granted in the case of a court finding that there has been unequal treatment between traders as a result of the type of lobbying seen in the VIP lane scandal during the covid-19 pandemic.
In the debate on amendment 103, tabled by the hon. Member for Aberdeen North, the Minister said:
“We understand—indeed, we agree with—the intent behind the amendment, but the Bill already covers such a scenario via robust requirements for contracting authorities to ensure equal treatment and address conflicts of interest. The bottom line is that if a conflict of interest puts a supplier at an unfair advantage, they must be treated as an excluded supplier and cannot be given a direct award.”––[Official Report, Procurement Public Bill Committee, 7 February 2023; c. 139.]
I do not doubt that VIP lanes would breach provisions relating to equal treatment of suppliers, and I do not doubt that those provisions were broken during the VIP lane scandal. In fact, that was at the heart of Mrs Justice O’Farrell’s ruling in the PestFix case last year, in which she stated that the operation of a high-priority VIP lane was
“in breach of the obligation of equal treatment”.
Despite that finding, the plaintiffs in the case were not awarded remedy, and it is unclear what checks and balances are in place to ensure that a future Government will not rely on VIP lanes, even when they know that their application will fall foul of the law. That is summed up by Mrs Justice O’Farrell’s closing remarks:
“In these proceedings, the Claimants have established that operation of the High Priority Lane was in breach of the obligation of equal treatment under the PCR. However, the court has found that, even if PestFix and Ayanda had not been allocated to the High Priority Lane, nevertheless they would have been treated as priority offers because of the substantial volumes of PPE they could supply that were urgently needed. Although there is public interest in the outcome of this challenge, the contracts in question have been performed (or expired) and it is sufficient that the illegality is marked by this judgment. Therefore the granting of relief does not meet the test in section 31(2B). In those circumstances, the court must refuse to grant the relief sought.”
I believe that, at its heart, that ruling shows the flaws in the current system. In debates on other amendments and clauses, I have argued for more transparency in the Bill in relation to conflicts of interest. The Minister knows that the Opposition believe that shining a light on proceedings as early as possible helps to limit the time in which illegal activities can occur. Surely, however, as the Government rejected our earlier amendments, they must see the need to tighten up the consequences of acting against the law. We know that the use of the VIP lane was illegal, and we know that companies that got into the VIP lane were 10 times more likely to win a contract, but the fact is that we do not know whether there have been any real consequences associated with the use of the illegal VIP lane.
I hope the Minister will agree that the public are rightly angry about the use of the VIP lane. They are angry that billions of pounds were wasted on personal protective equipment that was not up to standard. They expect to see justice when illegal activities are carried out. What is the point of putting laws in place if there are no consequences? New clause 6 would tighten up action against activity that breaches rules on conflicts of interest by ensuring that the courts are able to grant relief when lobbying by MPs, peers or senior civil servants results in unfair treatment. I hope the Committee will support the new clause.
New clause 6 would, in circumstances where a breach of the non-discrimination principle in clause 89 was caused by a representation to the contracting authority by an MP, lord or senior civil servant, disapply section 31(2A) of the Senior Courts Act 1981 in the context of any judicial review.
Section 31(2A) essentially prohibits a court from granting relief, including awarding damages, where it is highly likely that the conduct complained of did not make a significant difference to the contracting authority’s decision. In other words, the intention of the new clause is to enable a court to grant relief when lobbying for a contract to be awarded to a particular supplier has led to alleged unequal treatment, even where the contracting authority can demonstrate that it would have selected the chosen supplier regardless of any lobbying.
While I understand that the new clause is motivated by a desire to ensure consequences if an MP, lord or senior civil servant lobbies a contracting authority to award a contract to a certain bidder, resulting in the unequal treatment of other suppliers, the Bill is crystal clear with respect to conflicts of interest, and there are consequences if those statutory duties are breached. Clause 81(3) states that if
“a conflict of interest puts a supplier at an unfair advantage”
and if steps to mitigate cannot avoid that advantage, the supplier must be excluded.
Under part 9, suppliers may seek legal remedies, including relief, if they have suffered or are at risk of suffering loss or damages as a result of a breach of statutory duties. Suppliers that have lost out on contracts as a result of such unlawful behaviour are best placed to hold contracting authorities to account.
Additionally, in respect of suspected non-compliances with the Bill, including conflicts of interest that put a supplier at an unfair advantage, an appropriate authority can investigate upon the request of any party, using part 10 of the Bill or other powers, and issue recommendations if commercial practices do not comply with the Bill’s provisions. There is simply no need for the Bill, which has additional remedies for breach of statutory duty, to start interfering with the rule of law applicable to judicial review claims. As a result, we respectfully ask that the new clause be withdrawn.
Question put, That the clause be read a Second time.
It is a pleasure to respond to the debate on new clause 7, which mandates a review of the procurement of the fleet solid support ships programme and requires findings to be published by the end of the year. Replying to my friend the hon. Member for Islwyn on this subject is sadly reminiscent of the second Anthony Joshua versus Usyk fight, where Joshua bravely, but unfortunately, deployed similar tactics to the ones he had used previously and met the same conclusion. The hon. Gentleman will be delighted to hear that monitoring is already part of the MOD’s approach to the programme. The MOD will track the process of the overall FSS programme, as well as social value and recapitalisation activities, through regular governance forums such as the project delivery board and the recapitalisation and social value committee.
In support of the forums, Team Resolute is obliged to produce regular reports demonstrating the progress achieved. Examples include reports detailing execution against Harland & Wolff’s shipyard infrastructure works commitments, and earned value progress in terms of design development and the ship build. Additionally, regular site visits will be undertaken by expert personnel in the Department.
I assure the hon. Gentleman that the contract will bring hundreds of jobs to the UK. The majority of the contract spend will take place in the UK, with most manufacture activities taking place in UK shipyards in Belfast and Appledore. All three ships will be integrated at Belfast, along with all testing and commissioning. As he knows, these are large ships, second only in length to the carriers. The use of a world-class auxiliary shipbuilder allows for technology and skills transfer to the UK, and for UK capability and employment to sustainably step up to deliver this contract. Team Resolute also said that it intends to use UK-sourced steel wherever it is practical to do so, and steel will be procured in accordance with Cabinet Office guidelines. It is sad to hear the hon. Gentleman talking this great programme down.
All this work will enable early identification and mitigation action against the risk of non-delivery. Key performance indicators for the programme will be reported against, with several relating to UK labour and the UK supply chain. MOD Ministers will receive regular updates throughout the programme, particularly in relation to UK skills development and ramp-up in the initial stages of the contract. That will supplement other regular reporting on FSS that the MOD has committed to providing to His Majesty’s Treasury.
The Bill sets out the framework for public procurement for contracting authorities generally across England, Wales and Northern Ireland. It is therefore not appropriate to set out requirements for one specific project, the timescale for which is finite. For those reasons, I respectfully request that the amendment be withdrawn.
Question put, That the clause be read a Second time.
I am very happy to play Ray Robinson to the hon. Gentleman’s LaMotta. He will remember fondly, as I do, that Jake LaMotta said, “I fought Sugar Ray Robinson so many times, it is a wonder I don’t have diabetes.” I will cease the boxing chat there, Mr Mundell, lest you get up and bite off my ear, as Mike Tyson did to Evander Holyfield in their second fight.
I am pleased to hear the hon. Member for Islwyn say that value for money and transparency lie at the heart of the Bill, because they do, and it is because of those principles that we feel the new clause is unnecessary. However, it is also unnecessary because the National Audit Office already conducts a yearly audit of the defence equipment plan and undertakes regular audits on defence programmes. Further scrutiny of the performance of defence programmes is undertaken by the Infrastructure and Projects Authority, which tracks the progress of projects currently in the Government major projects portfolio, the details of which are published in its annual review. As an independent statutory body, the NAO decides independently of Government where to focus its resources, and determines what projects and public bodies it audits at what point in time. The new clause would interfere with its statutory independence.
At the heart of the proposal is a desire to see defence procurement improve—an objective the Government share—but I encourage the Committee to follow closely the implementation of the Government’s defence and security industrial strategy, published in March 2021, which will increase the pace, agility and management of the Ministry of Defence’s acquisition process. We respectfully request that the new clause be withdrawn.
I do not know much about boxing, but I know that when there is no knockout, the judges decide.
Question put, That the clause be read a Second time.
I beg to move, That the clause be read a Second time.
The new clause would enable a future procurement system to mandate that procurement transactions be carried out in a specific way. It would build on the powers in clause 95 relating to procurement transactions, but take those powers further to ensure that everyone undertaking procurement under this regime uses a well-designed, specified system that is common throughout.
It is rare in a Bill Committee for the Opposition to propose giving unrestrained and optional power to the Government via an amendment or new clause, so I hope the Minister is delighted by our new clause. It is almost a knockout clause, I would say. We understand, and indeed welcome, the measures to introduce some degree of commonality across procurement through methods such as a single online system. Commonality within the procurement system brings many advantages. It can save contracting authorities the time, effort and money of running individual systems; boost the public’s understanding of procurement data and mechanisms, indirectly boosting transparency; and make our procurement system easier to navigate for suppliers, helping SMEs to bid for contracts efficiently, rather than having to shape-shift around the application process.
Around the world, increased commonality has been seen to increase efficiency and create a system that is the envy of the world. The Minister need only speak to one of his own party’s MPs, the hon. Member for West Worcestershire (Harriett Baldwin), about Ukraine’s ProZorro procurement system. Systems such as ProZorro and the Republic of Korea’s procurement system bring in a specified system that is used by everyone and that uses cutting edge digital technology to reduce bureaucracy. That was referenced in the Government’s Green Paper on procurement, which said:
“This lack of standardisation, transparency and interoperability is preventing the UK from harnessing the opportunities that open, common and shared data could bring. The ability to analyse spend, manage suppliers, counter fraud and corruption and see inside the supply chain to ensure compliance with government policies. The experience of other nations (e.g. Ukraine and South Korea) is that driving forward with a clear digital procurement strategy focused on transparency results in greater participation and increased value for money driven by competition.”
There is already international precedent for the introduction of a specified procurement system, and the Government have stated these lofty aims, so why should the Bill not make provision to go further?
Our new clause would not mandate immediate action, because we know that this would be complex and take time to set up. However, should this Government or a future one want to introduce a Ukraine-style system, it would be a shame if they found that difficult under the Bill. I therefore hope that the Minister will agree with us and support the new clause.
The hon. Lady’s new clause is on the procurement transaction system. We are absolutely delighted with the Opposition’s enthusiasm for our online system.
The Bill already contains provisions for the establishment of the online system for the purpose of publishing notices, documents and other information under clause 93. It also requires the online system to be free of charge and accessible for people with disabilities. Furthermore, as the Committee will remember, clause 95 requires certain information to be shared in a particular way, including through a specified online system, and requires contracting authorities to keep records of any communication between the authority and a supplier that is made for the purposes of, or in connection with, a covered procurement.
The online system will enable everyone to have better access to public procurement data, in particular because the detailed input received during the early design of the Bill from countries such as Ukraine and South Korea, which have specialist knowledge of designing procurement transparency systems. I am honoured to be able to say that my next meeting after this sitting is with the Deputy Prime Minister of Ukraine, at which we will discuss this very issue. I will thank him for his country’s input to our work going forward in the Cabinet Office.
Does the Minister not feel that the meeting would be even more beneficial and fantastic if he were to tell the Deputy Prime Minister that he had accepted the new clause?
I will be delighted to tell our friends in Ukraine that, because of the advice they gave us earlier, there is no need for the new clause. We have a great partnership with Ukraine, which straddles many areas, and a growing number of them. We have benefited from the Ukrainians’ expertise, and from that of colleagues in South Korea, which has very advanced digital government and economy.
As a result of the work we have done and are doing, citizens will be able to scrutinise spending decisions, suppliers will be able to identify new opportunities to bid and collaborate, and buyers will be able to analyse the market and benchmark their performance against others on spending with SMEs. The Government have already committed to sharing procurement information through the online system, and the new clause would simply replicate requirements that are in the Bill already.
The hon. Member for Vauxhall asked how we know whether future Governments will be bound, but the proposal will happen within the lifetime of this Government. The Government are committed to it, to delivering on it and to learning from the experiences of colleagues abroad. We therefore respectfully ask that the new clause be withdrawn.
Question put, That the clause be read a Second time.
Quite right. This housing association had no footprint at all in Brighton and Hove and a very limited footprint in East Sussex. The women who were in that organisation’s housing might find it more difficult to go to them, because it is not a truly independent service.
Whether that is the case or not, what then happened was that the refuges and some of the counselling services that are provided in the city were sub-contracted out to some of the RISE people. So RISE picked up some bits of work, but not all of it. It could not offer the women wraparound support, just support in some very specific areas, so the service potentially became worse for women. A top-slice of the money has been taken out of the area for management and bid-writing fees and costs, which such organisations all take, and given to an organisation that is based nowhere near Sussex and does not have that specialism.
When women then complained and protested during covid, through covid-compliant protests, they were threatened by the police and told their protest was wrong and that they should not be protesting. Interestingly, the police allowed my hon. Friend the Member for Hove (Peter Kyle), the hon. Member for Brighton, Pavilion (Caroline Lucas) and me to address the covid-compliant demonstration. There was no problem with that; it was only as we left that the police pounced on the women organisers, in front of their children, and tried to fine them. That was particularly egregious. I represented those women and said that I would give statements to support them, and in the end the police dropped the case.
Even when women tried to speak up, they were abused and harassed by the police—they were women who have come through domestic violence and who have been RISE service-users. It was important to commission RISE, but it was also important that women themselves had their voices heard. At all stages—in the commissioning and the outcome—women’s voices were removed and shut down. New clause 16 would give that protection.
Even if the Minister does not support the new clause—I would like him to, but I assume he might not—I hope he will reassure us that he will strengthen the section in the guidelines on women-specific services, such as those who have suffered domestic abuse, and place additional emphasis put on ensuring that local women’s voices are heard, while also allowing some of the competitive tendering to be waived. That is already possible, but we need stronger guidelines, particularly for multi-authority procurement. We will push the new clause to a vote, but I hope the Minister provides those reassurances, as I suspect we all broadly agree on the issue.
New clause 16 seeks to ensure that authorities have regard to social value when carrying out procurement for services to support victims of violence against women and girls. Before I discuss the specifics, I should say that the Committee has debated over several days the centrality to this legislation of the fact that we are moving from a world of most economically advantageous tender to most advantageous tender—from MEAT to MAT. That gives contracting authorities the opportunity to make decisions that are not based solely on economic advantage. That will cover all areas, not just the specific area outlined in the new clause.
There is already a legal requirement in this area. Contracting authorities are already required to consider how social value might be improved for all types of service contracts under the Public Services (Social Value) Act 2012. That Act requires the authority to consider when placing a public service contract
“how what is proposed to be procured might improve the economic, social and environmental well-being of the area where the authority primarily exercises its functions, and how, in conducting the process of procurement, it might act with a view to securing that improvement.”
I thank the Minister for his remarks, but does he understand the concerns raised by local and national women’s charities? They say that the current guidance does not go far enough and, in their experience, they feel the guidance is ignored in many cases or given very little weighting in the contracts that are then awarded. Does the Minister agree that those organisations have valid concerns?
I understand what the hon. Lady is saying. Obviously, the 2012 Act will continue to apply to procurement of services to support victims of violence against women and girls. Moreover, the public benefit objective in clause 12(1)(b) requires contracting authorities to consider the extent to which public money spent on their contracts can deliver greater social value than it otherwise would, for example by encouraging local specialist service providers that understand the particular needs of the communities they serve.
With the combination of existing legislation and this new legislation, with its emphasis on MAT rather than MEAT, we feel that the duty in new clause 16 already exists in law. I therefore respectfully ask that the new clause be withdrawn.
Question put, That the clause be read a Second time.
New clause 18, which was tabled by the hon. Member for Nottingham North (Alex Norris), would allow public authorities to apply their own policies, under which they would not procure from certain countries because of those countries’ human rights conduct.
It is obviously right and good that human rights abuses have no place in public supply chains, but the new clause is unnecessary and would give authorities too broad a discretion to apply blanket boycotts. Although the new clause would not allow for the singling-out of individual countries, it would allow authorities to exclude suppliers from entire nations without any consideration of whether a supplier itself has had any involvement in abuses or of the steps a supplier has taken to self-clean, both of which are important features of the new exclusions regime to manage risk appropriately and fairly.
Excluding suppliers based on where they are located would be disproportionate and in some cases would be contrary to the UK’s international obligations. The Bill already contains a robust regime for the exclusion of suppliers that are unfit to hold public contracts. Schedules 6 and 7 set out a wide range of exclusion grounds that target the most serious risks to public procurement, including modern slavery and human trafficking. We have taken action to strengthen the way in which those terms are defined, so that suppliers may be excluded where there is sufficient evidence that they are responsible for human rights abuses anywhere in the world, whether or not they have been convicted of an offence.
Guidance already exists to help contracting authorities to address human rights risks and there is well-established practice during procurements. The guidance is detailed, at over 40 pages long, and includes sections on managing risk from new procurements to assessing existing contracts, taking action when victims of modern slavery are identified, supply chain mapping, useful tools, training, and questions to ask.
I will also highlight the new debarment regime provided for in the Bill, which allows Ministers to consider whether any supplier meets one of the grounds for exclusion and whether the issues in question are likely to recur. Suppliers on the debarment list face exclusion across the public sector. This is a significant step forward in our approach to supplier misconduct.
We respectfully request that the new clause be withdrawn.
Question put, That the clause be read a Second time.
Thank you, Mr Mundell, for chairing so ably and excellently. I thank the Clerks for their fantastic work. I thank my tireless officials, without whose expertise I would not know what to do. I thank Committee members on both sides of the divide. It is only fair to record in Hansard that the Committee has been good-natured, intelligent and at times almost enjoyable. I thank His Majesty’s loyal Opposition for supporting the overall thrust of the Bill, although they do not agree with every detail. We left it in better shape than when it arrived, and I look forward to working with everyone to take it through Report and to Royal Assent.
I echo the Minister’s comments. I formally thank the Clerks—Sarah, Chris and Huw—for their endless emails and helping me to understand the groupings and procedure. I will be honest and let hon. Members know that this is my first time leading on a Bill Committee. Many years ago, trying to tell a girl from a council estate in Brixton that she would be leading for the Opposition on such a technical Bill would have been out of the question.
The issues that we have discussed are so important. I hope the Minister will see from some of the points that we have made and the amendments that we have tabled that we have an opportunity to ensure that procurement works for everybody, including those from council estates, who may not understand it but will see the impact on their everyday lives. I look forward to discussing the Bill robustly with the Minister again as it goes through its next phases.