(5 years, 1 month ago)
Commons ChamberThat is indeed not a difficult problem to fix and I am more than willing to sit down with my Welsh counterparts to ensure that that is done. We have made more than £1 billion available for concessionary bus passes, and it is absolutely key that older people and those with disabilities can use our public transport system.
There is no doubt that our bus services are in crisis. Funding has been slashed by £645 million a year in real terms since 2010; over 3,000 routes have been cut, as we heard earlier; and fares have soared by two and a half times the increase in wages. It is hardly surprising that passenger numbers have fallen by 10%. Millions of pensioners, young people and commuters who rely on buses deserve an apology, so will the Minister now apologise for her Government’s complete and utter failure in this area?
It is remarkable that the hon. Gentleman, who represents a Reading constituency, will not even recognise the progress that has been made with local bus services in Reading, where numbers are going up. Even in places such as Liverpool, where better packages have been put together for younger people, numbers are definitely going up. I am more than happy to come to the Dispatch Box and talk about the new £220 million fund that is being made available. The hon. Gentleman talks about bus fares. They are indeed an issue for local authorities and train operating companies to take up, but unfortunately, Opposition Front Benchers have forgotten their history; when they were in office, bus fares went up twice as fast as they have under this Government.
(5 years, 5 months ago)
Public Bill CommitteesI appreciate that the hon. Member for Reading East is stepping in for his colleague, and valiantly so. The idea is to make your speech when moving the new clause, but all is not lost—if he wants to speak to the new clause now, he is very welcome to do so.
That is very generous and gracious of you, Mr Davies. I am sorry if I misunderstood the process while I am standing in for my colleague.
I appreciate that the Minister has taken some time to come back with the Government’s response, but it is worth highlighting some of those points in a little more detail because of the importance of wildlife. As we discussed this morning, it would be somewhat ironic if a positive and pro-environmental measure such as high-speed rail was inadvertently to damage habitats and the Government were unable to respond fully to those concerns.
From the previous stages of HS2, a number of issues have caused serious concern to residents, communities and the public more widely. Although the Bill itself clearly shows a response to some of those elements, it is not as comprehensive as it needs to be. That is why I am seeking a reassessment by the Government through the new clauses.
New clause 1 would require the Government to produce a report on how any actions by HS2 will impact on the natural environment—wildlife, birds and trees. The report could be laid before the Select Committee considering petitions on the potential threats to the natural environment. We have scrutinised the Bill to see whether there is a lack of clarity, and we have tabled the new clause to address that.
By bringing forth a report to be laid before Parliament, the Government would ensure greater focus and scrutiny of the HS2 project. The new clause calls for the report to be laid within a year of the passage of the Bill, which also means there is time for the Government to develop a greater scrutiny role over HS2 Ltd, which is obviously a separate company, and to ensure that it changes its practices and is prepared to give an answer to the House if hon. Members decide that it should do so.
Labour Members have serious concern about the impact of HS2 on the natural environment, as we have discussed a number of times, including this morning, whether on birds nesting, animals burrowing, or indeed the trees themselves. I know from previous debates and questions, which have been asked by Members from all parties, that this issue has been reported on a number of times. However, the approach, behaviour and actions of HS2 Ltd to date have demonstrated why it was crucial to table the new clause.
There have also been reports that HS2 Ltd is using the practice of netting bushes—it has been widely covered in the media in recent months—which clearly can cause real distress to animals, and especially birds, which breach the netting but can then become trapped. We call for the practice to cease. The company should instead seek to remove bushes and hedgerows at a time of year when birds are not nesting—this obviously relates to existing legislation and good practice. There is plenty of time in advance of these major works to reschedule them, to be far more sensitive to the rhythms of nature and, as a result, to do more on this front.
Likewise, it has been drawn to our attention that trees have been felled in the nesting season during the course of the programme. That is completely inappropriate, as it risks eggs, and indeed whole nests, falling to the ground. It is therefore vital that there are further restrictions on HS2, such that it schedules this work outside the nesting season. Although the Bill highlights that HS2 Ltd should follow the best examples of working with nature, including management of trees, in the first phase of the project the company has failed to live up to that. There are examples of felling taking place in the nesting season, and this practice should be halted immediately for phase 1 of the route. However, we also believe that the practice should change for phases 2a and 2b.
We believe that the Government have a responsibility to ensure that they take a more environmentally friendly approach to the project, especially in areas where the project is failing. The Government state that they will simply mitigate habitat loss with the plantation of additional new habitat in future, but that does not go far enough. On a number of occasions the Government have pledged to leave the environment better than they found it, as we all know. However, with destructive and unnecessary actions, such as netting and felling, especially at the wrong time of year, the Government’s pledge is obviously just empty rhetoric.
Labour Members know that conservation is very important to the public. It has an impact on farming and on ensuring that the richness of nature can be enjoyed by all, and we are strongly committed to improving the environment. In that regard, we believe that the Government have to be far more accountable for the actions of HS2 Ltd, especially as the company is at the early stages of a very large programme that will affect significant parts of the country.
By ensuring that the Government must produce a report, the new clause also seeks to provide the Government with a responsibility to set out how they will mitigate the actions that are being taken. I will provide a few examples. Although not common practice, can trees be excavated and moved, especially with a focus on the 27 veteran trees that line the phase 2a route? What wildlife corridors will be built during the construction of HS2 to allow small mammals, other animals and birds to move away from the construction zone? The Bill is silent on that, yet we know that wildlife, whether birds or animals, needs clear corridors that support the wider existence of species. To disrupt those corridors without taking steps to provide alternatives is negligent, yet the Bill is silent on that.
By calling for the Government to be accountable to Parliament on these issues, we will build confidence among MPs and residents that the Government are undertaking due diligence on these important factors, which, I am afraid to say, they have failed to demonstrate to date. It is worth adding that if our new clause is agreed, HS2 Ltd would be more accountable to the House, which I am sure we would all wish to see.
Section (2)(a) focuses on ancient woodlands, especially the points that will not form the actual HS2 route but will be used during construction, as we discussed this morning. The new clause calls for additional consideration to be made to ensure that trees are protected in these areas, since there is more latitude to avoid felling so many trees and removing so much of the natural environment. We believe that the Government, with HS2 Ltd, should ensure that any construction route and the site itself minimises the destruction of natural habitats and, where alternatives can be found, they must be found, including reducing the size of the construction sites to an absolute minimum.
I am sure that the Minister will understand Labour’s concerns, which have also been stressed during the petitions stage of the Bill. Although I know that different tunnelling arrangements were scrutinised at the petitions stage—Labour would seriously consider this, especially around Whitmore—we understand that the majority on the Select Committee determined that the costs would be prohibitive and therefore there is already a far greater cost to our natural environment to be paid. This was agreed at petitions stage.
Labour would approach this project differently. However, I am sure that the Minister will understand why I have brought forward the new clause and why we believe, sadly, that she is not doing enough to mitigate the harm that the Government’s approach to HS2 will cause to the natural environment.
I accept the hon. Gentleman’s comments about ensuring that we have complete confidence in the project along its entire route. I agree that wildlife is important, as are trees and ancient trees. However, all his points are covered by the environmental statement, which, at 11,000 pages, is incredibly extensive. That is why I do not believe that we need another layer of reporting on a statement that is already out there. The environmental statement has been scrutinised independently and by the Select Committee, which has made its own decisions.
We have committed in our response to the Select Committee’s third special report that, in order to protect birds, we will provide bird diverters on new power lines near Parkgate, working with the West Midlands Bird Club. We continue to work with the environmental roundtable on these important issues. The Bill has taken into account the effect on wildlife, especially rare and protected species. A balance has to be struck between taking individual landowner’s property and providing land for mitigation.
I remind the hon. Gentleman that all the issues he has raised are already in the 11,000-page document. For that reason, I believe that he should withdraw the new clause.
I am grateful to the Minister for giving such a detailed reply and for the work on the bird diverters, which is a step forward. I appreciate that some work has been done on this already. However, on the points that we have made and on the new clause, I would like to press this to a vote.
Question put, That the clause be read a Second time.
I beg to move, That the clause be read a Second time.
Opposition Members believe that there has been a serious modal shift in how we use freight in developments. We continually hear the Government talk about modal shift in transport, but there is no mention in the Bill of how to ensure that. For Committee members who are not familiar with this transport terminology, modal shift means a shift from one mode of transport to another, such as from road to rail. Labour does not stand in the way of development but seeks to mitigate its impact, which is why we tabled the new clause.
Rail can be the main driver of change. In the light of all construction sites’ heavy dependency on heavy goods vehicles, and from discussions that my colleagues and I have had with Network Rail and others, we know that rail freight can be better utilised, and it is important to demonstrate that on such an important infrastructure project as HS2. Rail lines will be laid, and it is important, wherever possible throughout the Bill, to utilise rail for the movement of aggregates and materials. We are talking about a major rail infrastructure project, so the logic that rail should supply aggregates and minerals should certainly be considered. There will clearly be no lines at the commencement of the project, but over time the opportunity will arise.
Likewise, it is more sustainable for HS2 to source and move aggregates and material as far as possible by rail, and to use HGVs only for the final part of a journey. Equally, sourcing materials and aggregates as close as possible to the development site would also reduce the expected carbon emissions. Such an approach would also reduce congestion and lessen the impact on air pollution in the local vicinity. That demonstrates good practice in what can be achieved on such a major infrastructure project and can form the basis for a change of approach by the Government when undertaking such major works across the country.
Likewise, materials should remain on the site, or as close as possible to the site, to minimise transport movements. Laying a report before Parliament within a year of the Bill’s passage would provide ample opportunity for HS2 Ltd to work with the Government to establish better construction practices.
We recognise the impact that numerous road traffic movements have on local communities. As such, the promoter has proposed numerous highway works and temporary construction haul routes to alleviate that number. The Secretary of State has also given commitments relating to the implementation of these alleviating works and to restricting the use of certain roads for HGV movements. Equally, the strategies for reusing materials to reduce the volume of aggregate necessary to be moved are under continual review. The promoter published its borrow pit review, which outlines the severe reduction in necessary vehicle movements that backfilling and reusing of spoil takes off the road network.
The new clause is not needed. The environmental statement assumes and allows for the delivery of materials, plant and other equipment to construction compounds on the traditional rail network. It contains the working assumption that:
“Wherever reasonably practicable, the rail network will be used in preference to public roads.”
All traffic modelling has included that assumption. In this way, the environmental statement reports to Parliament our preference for transporting the goods, as outlined in the new clause, by rail rather than road. We have already assessed that there is a benefit in transporting all this material by rail, rather than road, and will seek to do that as far as possible. As with the previous new clause, virtually nothing will have changed between the publication of the environmental information and one year post Royal Assent. That is precisely what we have done on the borrow pits of phase 2a, to reduce the distance that aggregates have to travel. We have also put forward a proposed line of route to further reduce lorry movements. The new clause is therefore not needed and should be withdrawn.
I am grateful to the Minister for highlighting that commitment on the sourcing of aggregates. That is a helpful step forward, given the significant volumes of aggregates that are needed. The Government have once again talked a good game, but we would prefer to have further scrutiny of this important issue. I therefore wish to press the new clause to a vote.
Question put, That the clause be read a Second time.
I beg to move, That the clause be read a Second time.
I thank my hon. Friends the Members for Ipswich (Sandy Martin) and for East Lothian (Martin Whitfield), who attended the petitions hearings of the Select Committee on the High Speed Rail (West Midlands - Crewe) Bill as members of that Committee, and who shared with our shadow Transport team their concerns about how this route will affect active travel. As shadow Minister with responsibility for active travel—walking and cycling—I share those concerns, which is why we tabled the new clause.
It is inevitable that major construction projects will cause an element of disruption to journeys, and inconvenience to cyclists and, to an even greater extent, walkers, but diversions can have a real impact. If a car has to divert for a few miles to cross the HS2 construction site or the final HS2 line, that will add to its journey and its carbon footprint. If a cyclist does the same, it could add considerable time to their journey. It is worse for pedestrians; it could result in hours of extra time.
We tabled the new clause because we need to encourage active travel much more in this country; as was said, the Government are not meeting their targets for it. They have far more to do in this area. The new clause asks the Government to consider the factors further, and to report to Parliament within a year of the Bill’s passing into law. Subsection (2) highlights the need to have regard to not only routes that traverse the rail line, but those that run adjacent to it, which could also be affected. The Government missed a significant opportunity in failing to create a cycle path along the HS2 route. In many continental countries, major roads and rail lines have cycle paths parallel to them; once there is access to the land, it is an obvious choice to make.
Cycle routes are increasingly popular; they are the most direct route, away from car and lorry use. A segregated north-south cycle route adjacent to the line, but obviously some distance away from the line’s boundary, would have been an important legacy of the HS2 project. There would have been very little extra cost, in the light of the scale of this enormous construction project. Again, we ask the Government to show more concern for walkers and cyclists by considering the issue and reporting back to Parliament within a year of the enactment of the Bill.
Contrary to what the new clause suggests, I do not agree that we have not looked into or provided for non-motorised use. Let me give the hon. Gentleman some examples. On the particular part of HS2 that we are here to scrutinise, we have offered assurances to Cycling UK that some footpaths will be made more suitable for people who cycle or ride horses, so that local users of those public rights of way can seek, through the appropriate local planning process, to have those upgraded routes redesigned.
Yesterday, in response to the Transport Committee’s third special report on the Bill, we committed to working with Colwich parish council as it seeks funding from the recently announced £21 million Sustrans fund, and from funds that I announced last year. Phase 2a’s own £5 million community engagement fund and business and local economy fund are also available to improve towpaths, which will improve local walking and cycling facilities. I also announced the £6.5 million road safety fund, which provides even more money to support local initiatives for cycling and walking and for other non-motorised users.
Once again, I refer back to the environmental statement, because it covers most of the points raised. The report focuses on the impact of construction operations on cycling and walking. We have looked into the potential disruption in great detail in every area where it will occur along the phase 2a route. We have reported the likely effects and the proposed steps to mitigate those effects in the environmental statement. I refer the hon. Gentleman in particular to the community area report in that statement, which goes into detail on each part of the route. In that assessment, we included the likely effects on other non-motorised users of public rights of ways, such as horse riders, as is appropriate for works in a rural area, and steps for their mitigation.
There is a report, mitigations are taking place and there is engagement with local communities. The new clause is not needed and should be withdrawn.
I appreciate the Minister coming back on this issue. However, yet again the scale of ambition is very limited, and there is arguably far too little mitigation. A cycle path along the length of the HS2 route would have been a huge enhancement for the country at a time when we are failing to meet our cycling and walking targets; not having that shows a lack of ambition. I will press the new clause to a vote.
Question put, That the clause be read a Second time.
The hon. Gentleman raises a very important point, and it is vital that HS2 engages fully with residents and deals with them swiftly, clearly and with humility. As this is such a sensitive issue, and no doubt many people will focus on it, I will take a moment or two to respond.
Most types of tenants affected by the scheme are already provided for under current compensation law. Where they are not, the Government can use flexible, non-statutory arrangements to provide support. Where the law is silent, the Government have committed to taking forward appropriate measures in discussion with stakeholders and residents, should it be necessary to do so. Matters of tenant compensation are complex, because they depend on an individual’s tenancy arrangements. However, I will endeavour to summarise briefly the support that is available. I will outline the legal position, the comprehensive non-statutory schemes that the Government have developed to assist property owners who are affected by HS2, and the work that the Government are taking forward following parliamentary scrutiny of high-speed rail hybrid Bills.
The elements of compensation payable are set by the Ministry of Housing, Communities and Local Government, and apply to all Government-led infrastructure projects, including HS2. The HS2 scheme applies these arrangements, which have been debated, agreed and set by Parliament, together with the vast body of case law on the subject. Compensation is based on the principle of financial equivalence: the person affected should be financially compensated with no less and no more than what they have lost. Compensation due to tenants is therefore commensurate with their interests and the land they occupy; for example, if a private tenant property is subject to compulsory purchase, the tenant should be eligible for various heads of claim that comprise the market value of the leasehold interest in the land. They might also be eligible for a home loss payment for the loss of their home, and for reasonable moving costs.
The key part of the non-statutory arrangements is a consideration of atypical properties and special circumstances. These are established, funded arrangements that apply to tenants as well as property owners. I am pleased to say that in response to concerns raised by the phase 2a Commons Committee, the Government have committed to improving guidance on those atypical arrangements and raising awareness and accessibility, so that we can continue to provide the right support at the right time to people who need to use them. The Government have also been charged with developing a non-statutory prolonged disruption scheme in response to the phase 1 Lords Committee’s concerns on this subject. The Government intend shortly to release details of the scheme, which will assist residents who have different types of tenure, and who are affected by significant construction noise across the HS2 route.
Finally, in response to concerns raised by the phase 2a Commons Committee, the Government have committed to taking forward three strands of work on compensation for owners of houseboats and other types of moveable home. The first is to explore whether there is a case for bringing houseboats into line with caravans on statutory home loss payment entitlement. The second is to establish whether there is a case for introducing regulations to compensate houseboat residents who are affected by significant noise disturbance from rail works. The third is to explore the potential use of non-statutory compensation measures in advance of legislation being introduced, should the case for change be established. The Government are committed to taking forward appropriate measures in discussion with stakeholders and affected residents.
In conclusion, I believe the Government’s established non-statutory arrangements, which are as broad and inclusive as possible, are an appropriate and flexible tool to support all types of residents affected by the HS2 scheme. That is why I believe the proposed new clause is unnecessary, and I would urge the hon. Gentleman to withdraw it.
I thank the Minister for her response, and for mentioning the legal principles of the compensation scheme. As she said, however, the Government’s response is still a work in progress. For that reason, and because of the serious public concern about rented properties, I will press the new clause to a vote.
Question put, That the clause be read a Second time.
I beg to move, That the clause be read a Second time.
The new clause follows an inquiry at the petitions stage of the Bill that there was no remit to consider at that stage. Hon. Members will have heard that the kind of tracking used can have a significant impact on cost, including long-term maintenance costs, and the noise of the railway. It also has an impact on the speed at which trains travel. As the route has been singled out as providing high-speed rail travel, it is right that the Government work with engineers on the issue.
Although using slabs on the rail line is believed to be more expensive initially, it could prove much more efficient in the long term than using sleepers because it is low-maintenance. Across Europe and beyond, modern railway infrastructure projects are changing, and it is common for slab track to be preferred to sleepers. This short new clause asks the Government to assess the cost, efficiency and impact of that approach.
I do not see the need for the new clause. Again, the environmental statement assesses a reasonable worst case for the impacts of construction and operation of the railway. That includes so-called slab track, and track laid on ballast, or sleeper track. To comply with the environmental minimum requirements, the type of track used must be within the reasonable worst-case impact assessed in the environmental statement.
HS2 is one of the most scrutinised pieces of legislation to pass through the House—it even has its own Select Committee—and there are several other opportunities throughout the year for an inquiry to take place. There is constant reporting to Parliament and justifications for why decisions are taken. Reporting to Parliament obviously matters, and it takes place, but constant discussions about cost add another layer of financial burden and bureaucracy when the reports are already in place. The new clause is not needed and should be withdrawn.
I appreciate the Minister’s response. We will not press the new clause to a vote, so I beg to ask leave to withdraw the motion.
Clause, by leave, withdrawn.
New Clause 6
Quarterly reports on environmental impact, costs and progress
‘(1) The Secretary of State must publish quarterly reports on the scheduled works throughout the period in which those works take place.
(2) Each such report must contain an assessment of—
(a) environmental impact;
(b) costs; and
(c) progress compared to the scheduled timetable.
(3) The first such report must be laid before Parliament within the period ending three months after the day the scheduled works commence.
(4) Each subsequent report must be laid before Parliament within three months of the publication of the last report under this section.’—(Matt Rodda.)
Brought up, and read the First time.
There will be a reduced journey time on high-speed rail, which will open up capacity on existing railway lines. It will also shift people from roads or flights to rail, which is incredibly important. We will continue to invest north of London. This is just one way of ensuring that the journey becomes far more integrated, but I know that the hon. Gentleman would like it to become even faster. Considering that it has taken us so long to get high-speed rail up and running, who knows what will come in the next iteration? However, I do take his point.
Let me return to the important point about skills that the hon. Member for Reading East raised. At present, there are 9,000 people working on high-speed rail, with more than 2,000 businesses already involved in the chain. The hon. Gentleman raised an important point about how we will reach the 30,000 people who will be required to build the railway; that is why we have two colleges set up to improve the technical and academic skills of people working on the railway line, from design to construction.
Having made all those arguments, I really do not understand the need for new clause 6. The issue of quarterly reporting has been raised, but HS2 Ltd already provides annual reports to Parliament, as required by the DFT-HS2 Ltd framework document. I believe that that level of reporting is proportionate and sufficient. The project is bound not to exceed the likely significant environmental effects assessed for the scheme, as reported to Parliament. As part of HS2 Ltd’s sustainability policy, an environmental management system will be developed that will set out the procedure to plan and monitor compliance with environmental legislation; the record-keeping arrangements, including reports to my Department; and the procedures that will be put in place to monitor compliance with the Bill’s environmental provisions.
There is so much scrutiny and accountability that separate quarterly reporting would be excessive and burdensome to the Department. There are already reports out there; if the 11,000-page report were read fully, I believe it would answer a number of the questions that have been raised so far. I do not believe that there is any need for the new clause. It should be withdrawn.
It is interesting to listen to a Minister trying to justify providing a lack of information to Parliament. For a programme of this scale—it is utterly huge and encompasses not only the Department for Transport, but many other parts of the public sector and a large supply chain—internal reports will obviously be produced much more regularly than the annual report that the Minister described. Given the scale of the programme, the significant investment of public money and the need for the Executive to be held to account by Parliament so that the public can see that their money is being spent well, surely it is only common sense to make the reporting public on a quarterly basis.
Separate evidence will be available internally. I am sure that people at HS2 will produce thousands of Gantt charts and other forms of reporting for internal and departmental use; having worked as a civil servant on much smaller programmes, I am sure that that information is there. Surely it is incumbent on the Government to provide Parliament with a much more regular update so that it can properly scrutinise spending such large amounts of public money.
On the point about the environment, I am grateful for the Minister’s lovely commercial for rail travel, which I fully support. We absolutely value investment in high-speed rail, which the Labour party sees as a huge step forward for the country, but the Minister only partially addressed the specific point about the amount of carbon produced during the construction stages. Will she write to the shadow Rail Minister, my hon. Friend the Member for York Central (Rachael Maskell), to provide more detailed points about the specifics of the carbon produced during the construction period? The use of heavy goods vehicles—particularly if road freight is used, as we discussed earlier—and of aggregates and other materials can be carbon intensive. It would be wise to consider ways of reducing that carbon impact as the programme is rolled forward.
On the final point about skills, we fully support the investment in the two colleges. That is an important part of developing a skilled workforce in the areas the line crosses. However, we ask the Government to carry out more forward planning and to consider this as an even greater opportunity to develop a highly skilled workforce for the future, given the scale of the programme and the geographical spread of the line, particularly as it runs through many relatively disadvantaged communities, whether they be isolated rural communities with limited local employment or urban city centres. On that basis, we call for a Division on this new clause.
Question put, That the clause be read a Second time.
The hon. Gentleman raised some important points. I agree with him that we need strong community engagement and good public engagement, and that the response has to be flexible and responsive.
Let me remind the hon. Gentleman what HS2 is actually doing. This was one of the trickiest parts of my brief when I took over as Minister for HS2, because I wanted to ensure that HS2’s community engagement was on point, especially as further and deeper construction work takes place. The commitment to public engagement is evidenced by the community engagement strategy and the biannual community engagement progress report. For example, in 2018 more than 36,000 people attended over 2,200 engagement activities, including meetings, drop-ins and events across the whole of the HS2 route. The 24/7 help desk dealt with 26,697 inquiries, and nine out of 10 complaints were dealt with within 20 working days or fewer. I constantly put pressure on HS2 Ltd to ensure that it is working as effectively and with as much humility as possible.
Further, as a Minister I have secured meetings in Parliament between Members and HS2, sometimes with constituents. The hon. Gentleman may not be aware of this, so I put on the record that there is an independent construction commissioner and residents’ commissioner. The residents’ commissioner also gave evidence to the Select Committee. A substantial amount of public engagement is already taking place. That must continue and be of good quality. There must be speedy responses to the public’s concerns, in a way that they can understand and digest, given the level of engagement already taking place and the fact that the Secretary of State has made a number of commitments to continue to engage with all stakeholders. All of that information can be found on the HS2 website. It is published online, as is the register of undertakings and assurances.
Of course, we should never take anything for granted and HS2 Ltd should continue to work as closely as possible with the communities that require further assurance or changes in lifestyle. It needs to work with them as efficiently as it can. Considering all the work that is already taking place and will take place, I believe that the new clause is unnecessary and should be withdrawn.
I am grateful to the Minister for running through the existing engagement strategy and, indeed, the volume of correspondence and engagement that has taken place. However, it is somewhat disappointing that the Government are still not pursuing this through regulations and are not putting it on a statutory footing. We will therefore press the new clause to a vote.
Question put, That the clause be read a Second time.
(5 years, 5 months ago)
Public Bill CommitteesThe clause authorises the nominated undertaker to construct and maintain the works specified in schedule 1 for the construction of phase 2a of High Speed 2 and other incidental works. It is a standard clause found in all works Bills. Phase 2a sits between two larger phases of the HS2 project, so the clause makes provision to accommodate emerging design works for phase 1 at Handsacre junction and phase 2b at Crewe.
Schedule 1 sets out the construction requirements for the scheduled works and provides permitted limits of deviation from the siting of works as shown on the relevant plans. It also provides a description of the scheduled works. The permitted deviation limits have precedence in other railway Acts, most recently the High Speed Rail (London - West Midlands) Act 2017. The limits of the deviation reflect the fact that the design of phase 2a is, by necessity, at an outline stage—detailed design will come later—so some flexibility is essential. Any variation within the limits of deviation is controlled by the environmental minimum requirements.
Labour supports High Speed 2, as it will address the severe capacity constraints on our rail network and improve connections between cities in the midlands and the north. Any responsible Government must contend with the fact that commuter and freight services are being squeezed off the network due to lack of capacity. HS2 is vital for unblocking the railway and creating additional capacity.
The UK is off track to meet its emission reduction targets under the Climate Change Act 2008. Transport is the most emitting sector of the economy and the worst performing sector with regard to emissions—indeed, emissions have risen since 2010. HS2 will provide an alternative to domestic flying and will tackle that important issue. It will also allow for more reliable rail services.
It is vital that we get HS2 right. It is a tremendous opportunity to improve connectivity and we support it as part of a package of delivering transformative investment in our rail system.
I welcome the hon. Gentleman’s comments. We are debating a particular section of the line, and I welcome his support.
Question put and agreed to.
Clause 1 accordingly ordered to stand part of the Bill.
Schedule 1 agreed to.
Clause 2
Further provision about works
Question proposed, That the clause stand part of the Bill.
Clause 3 introduces schedules 4 and 5, which allow the nominated undertaker to carry out works to and otherwise affect highways. That includes creating new or improving existing highways and highway accesses, and stopping up roads. It also requires the nominated undertaker to obtain the consent of Highways England before carrying out works to roads for which that body is responsible, for example motorways and trunk roads.
Developers can be overly dependent on road transport, which is ironic in a major rail project. I hope that the Minister will agree that as much freight as possible should be delivered by rail so as to minimise road use and the inevitable disruption to local communities. What steps have the Government taken to address that important issue?
The hon. Gentleman makes a valid point. We want the project to be as clean and green as possible, and freight capacity is a major issue that we are investigating to ensure that as much freight can be moved by rail as possible. I hope that provides him with the confidence he needs.
Question put and agreed to.
Clause 3 accordingly ordered to stand part of the Bill.
Schedules 4 and 5 agreed to.
Clause 4
Power to acquire land compulsorily
Question proposed, That the clause stand part of the Bill.
Clause 4 provides the Secretary of State with the power to compulsorily acquire land within the limits shown in the Bill, where such land is required for phase 2a. Subsection (2) introduces schedule 6, which describes some of the land to be acquired and the particular purposes for which it may be acquired. It is not land required for the scheduled works; it is land required for ancillary works, including environmental mitigation, utility diversions and borrow pits. The clause further provides that the normal legislative regime relating to compulsory acquisition is to apply, subject to the modification set out in schedule 7. The purpose of the modifications is to streamline the land acquisition process, as Parliament will already have given approval to the Bill.
Compulsory purchases and compensation have been an issue of contention during this process. For phase 1 it was initially decided that residents of urban areas would receive less compensation that those in rural areas—a decision that was eventually overturned. It is important that such issues are dealt with fairly, but it appears that tenants who are adversely affected by the scheduled works are not being treated fairly as there is no scheme to compensate them. Those who rent are already disadvantaged compared with those who own their own properties, and I believe that much more can and should be done. I will return to that issue when we discuss the new clauses.
The hon. Gentleman raises an important point. The purchase of land is essential to the completion of the proposed scheme. People directly and especially affected by the Bill have had the opportunity to petition the House and will have another opportunity to do so in the other place.
The project endeavours to use land as effectively and efficiently as possible. There are a number of places where compensation claims can be heard and settled by agreement, whereas disputes can be dealt with by the upper tribunal or by other factors that HS2 has put in place to deal with local communities and local people. Even though the project provides some disruption along the line, we want to ensure that we are doing the right thing by the communities we are working with.
Question put and agreed to.
Clause 4 accordingly ordered to stand part of the Bill.
Schedules 6 and 7 agreed to.
Clause 5
Acquisition of rights and imposition of restrictive covenants
Question proposed, That the clause stand part of the Bill.
Clause 8 allows the nominated undertaker to use any subsoil beneath the highway within the Bill limits which is required for the purpose of construction and maintenance of works authorised by the Bill, without the need formally to acquire the subsoil or any interest in it. This does not apply to cellars, vaults, archways or other structures that form part of a building fronting on to a highway.
Subsections (3) and (4) introduce schedule 12, which lists the highway allowed within the Bill limits where the powers to take subsoil or compulsorily acquire interest in the land cannot be exercised except in the case of street works, as per subsection (6). Subsection (5) provides that, in the case of highways in the land specified in the table in paragraph 1 of schedule 11, only subsoil that is more than nine metres beneath the level of the surface may be taken.
Obviously, layers of subsoil are important. There is a link to the depletion of high-quality soils. We need to preserve good soil for farming. Some farmers in this important agricultural area might have spent time improving the quality of soil on their land. We would like this issue to be addressed so that any movement of soil is managed with great care and caution.
The hon. Gentleman raises an important point. I already attend meetings with the National Farmers Union and the Country Land and Business Association. We will of course continue to work with them, and he will know that we try to reduce any environmental impact when building this railway line.
Question put and agreed to.
Clause 8 accordingly ordered to stand part of the Bill.
Schedule 12 agreed to.
Clause 9
Termination of power to acquire land
Question proposed, That the clause stand part of the Bill.
Clause 14 allows the nominated undertaker to use any road specified in the table in schedule 8, which is land for which only rights may be compulsorily acquired or over which restrictive covenants may be imposed, so as to obtain a right of passage for the purpose of phase 2a. This power ends five years after phase 2a is brought into general use.
The clause will require ongoing construction work and will cause significant disruption to road networks in certain areas. It is important that disturbance is kept to a minimum. The use of roads is likely to result in unplanned road congestion, which can lead to delays for motorists, disrupt public transport and interfere with walking and cycling routes. It also has the potential to disrupt many people’s travel patterns, with the increase in roadside emissions as well. It is not possible to effectively predict the impact of the disruption to road networks, travel patterns and air quality in advance, which is why Labour thinks it is important that there should be ongoing public engagement to ensure that impacts are mitigated.
The hon. Gentleman raises another important point—the issue of ongoing engagement with Highways England, local authorities, those who drive, cycle and walk, and also Members of Parliament. That is the case at the moment. HS2 Ltd has provisions in place to ensure that it works with local communities and local council management on local travel plans. It will have to continue to do so through the construction phase.
Question put and agreed to.
Clause 14 accordingly ordered to stand part of the Bill.
Clause 15
Enforcement of restrictions on land use
Question proposed, That the clause stand part of the Bill.
The clause provides deemed planning permission under part III of the Town and Country Planning Act 1990 for carrying out the works authorised by the Bill. Deemed planning permission is granted only for ancillary works in the Bill where the impact of such work is assessed in the environment statement, or where the development is exempt within the meaning of the environmental impact assessment regulations. Any work outside those parameters would require separate planning permission. Subsection (3) introduces schedule 17, which sets out the conditions of deemed planning permission. That includes the requirement for approval from the relevant local authorities on specific aspects of design and construction to ensure that local impacts are appropriately mitigated in the area—for example, the movement of lorries to and from construction sites.
This is an extremely important issue as it deals with important environmental matters. The schedule addresses salutary points and deals with the conditions of deemed planning permission, as the Minister mentioned. We are concerned about the environmental matters covered, including the impact of dust, soil and road traffic. We are also concerned about how material is taken away from the site, vehicle movements and the impact on historic sites, which we will deal with later. I will return to these matters later today.
The hon. Gentleman once again raises valid points about how we remove material and mitigate any impact on the neighbouring communities, which is what HS2 is doing with its local engagement, as well as by working with local authorities. Planning permission provided by clause 17 is necessary to the construction of the proposed scheme and it provides more clarity to those directly and specially affected by the Bill.
Question put and agreed to.
Clause 17 accordingly ordered to stand part of the Bill.
Schedule 17 agreed to.
Clause 18
Time limit on deemed planning permission
Question proposed, That the clause stand part of the Bill.
It is always a cause of dismay when our built heritage is affected by new development. The provisions in the clause are very wide ranging. The Minister could consider better safeguards to further ensure that our country’s built heritage is protected during the construction of this vital national infrastructure project. In particular, perhaps a presumption against demolition could be considered where practical. Indeed, the dismantling and relocation of items of built heritage, where practical, might be presumed a better solution. If that were not possible for the entire building, certainly key features of interest could be dismantled, preserved, salvaged or relocated where appropriate.
On the inspection and observation of works, schedule 18 merely indicates that there will be an opportunity for English Heritage to inspect the works, but there is no obligation on it to do so. That could be tightened by the inclusion of an obligation to ensure that all heritage assets affected are inspected and recorded, including by laser scanning to provide a highly accurate 3D model of any assets that are destroyed as a result of the project. That would be a far better way to safeguard the built heritage of our country as a result of the project.
I concur with my hon. Friend the Member for Glasgow North East. I know he has a deep personal commitment to this issue, as he represents a constituency in which a wonderful historic building suffered serious damage.
We take this issue seriously, and I urge the Government to take great care and look at some specific pieces of heritage that might be affected by the developments, such as the historic mileposts, the 1867 rail building at the important historic rail town of Crewe, and the grade II listed farm houses in the line of the route. It would be ironic if wonderful railway architecture from previous generations was damaged or completely destroyed by the building of HS2. It would be so much better if whatever possible could be preserved for the benefit of future generations. We hope the Government will look further into that and consider possible mitigation.
Once again, important points have been raised that were also made about HS2 and, no doubt, made to the Select Committee. One hon. Member has a particular issue within their constituency, which no doubt we will hear about again today.
Similar provisions were included in the Crossrail Act 2008 and the HS2 phase 1 Act of 2017. All works must be done in accordance with the environmental minimum requirements, and the normal requirements and appropriate consents are always obtained when dealing with listed buildings.
The Secretary of State will have to work with local authorities and Historic England. The Select Committee considered the scheme’s effect on specific historical sites, and the scheme is designed to seek to avoid impacts on culture or heritage. We recognise the importance of such assets to communities locally and nationally. Even though we are trying to build an up-to-date, modern railway line, since I became HS2 Minister, I have been concerned to ensure that we honour historical sites close by and try to mitigate any impacts on them. I am sure that HS2 Ltd will continue to do that.
Question put and agreed to.
Clause 21 accordingly ordered to stand part of the Bill.
Schedules 18 and 19 agreed to.
Clause 22
Burial grounds
Question proposed, That the clause stand part of the Bill.
The clause provides for the disapplication of laws concerning burial grounds and human remains. It also introduces schedule 20, which outlines the process that the nominated undertaker must follow in relation to the removal and reburial or cremation of human remains, and the removal and replacement of monuments to the deceased.
The clause disapplies ecclesiastical law for the purpose of constructing phase 2a. It also disapplies the law relating to burial grounds if the remains and any monument to the deceased have been dealt with in accordance with schedule 20. Similar provisions were included in the 2008 and 2017 Acts.
This is obviously a very sensitive aspect of the Bill. We urge the Government to take great care in this matter and, in particular, to allow for more time and effort to be taken to contact the families of deceased people. In this modern age, with well-established genealogy and records of church burials and other burials, we hope more effort could be made to contact the families whose loved ones’ remains are being moved, because this is a sensitive issue for families.
The hon. Gentleman makes an important point. If he has had time to visit Euston, he will have seen the huge amount of work being undertaken to deal with remains, which are all being removed by hand. It is a long process, as it should be. We have not yet identified any known burial grounds that could be affected, but in the course of construction, we could discover previously unknown sites. If that occurs, the clause and its related schedule provide for the appropriate processes to manage the removal and reburial or cremation of human remains, and the removal and replacement of monuments to the deceased.
Where remains are less than 100 years old, schedule 20 requires a notice to be published in the local newspaper and displayed at the burial ground. Relatives have the right to remove and re-inter or cremate the remains at the expense of the nominated undertaker, who must pay reasonable costs. I hope that provides some assurance to the hon. Gentleman that we are taking the issue seriously.
Question put and agreed to.
Clause 22 accordingly ordered to stand part of the Bill.
Schedule 20 agreed to.
Clause 43 introduces schedule 32, which protects the interests of statutory undertakers and other bodies who may be affected by other provisions of the Bill. The provisions are similar to those in the Crossrail Act 2008, the Channel Tunnel Rail Link Act 1996 and the High Speed Rail (London - West Midlands) Act 2017. The protective provisions of the schedule cover highways and traffic; electricity, gas, water and sewerage undertakers; electronic communications code networks; land drainage, flood defence, water resources and fisheries; and the Canal & River Trust.
We believe that far more work needs to be carried out by the Government over a range of infrastructure projects to minimise the impact of development of sites, and not least to re-explore the issue of rail enhancement programmes and how rail should be used, wherever possible, to shift goods. That is explored in one of our new clauses.
We know that congestion causes pollution, and we know about its effect on communities and the environment. The Government are willing to carry out some monitoring work, but we would like them to do much more. Are they planning to monitor pollution in detail, and to publish new journey times? Projects such as HS2 have an impact not only on those working on the site, but on the wider population in the area. There should, as has been said, be further work. The Government need to respond to the dilemma, not address it superficially.
Paragraph 13 of schedule 32 deals with issues that I want to highlight concerning pedestrians, cyclists and other modes of transport, and how they cross the line. The schedule is not comprehensive enough, and we have drafted a new clause on the subject. We believe that pedestrians and cyclists should be at the top of the Government’s considerations in infrastructure projects, as the Government have targets for increasing walking and cycling. It would be somewhat ironic if an infrastructure project designed to improve transport withheld other aspects of it. The disruption to this group of highway users should be minimal. Bridges and tunnels can provide crucial access to those who need it, and can bring only greater connectivity to those who will be cut off by the HS2 line. The Government need to take a much closer look at this issue, and to address concerns that we will cover in a new clause.
Paragraph 14 of the schedule deals with the salient issue of highways repairs. We are becoming a pothole nation, as we have mentioned on other occasions in the House. Whether on major highways or smaller lanes, it is vital that proper repairs are made as damage occurs. Obviously, there will be damage in a major infrastructure project during which heavy goods vehicles will thunder down local roads. We want the Government to address that issue, which is of great importance to communities.
The hon. Gentleman raises important points, but most of them are detailed extensively in the environmental statement. My Department and HS2 Ltd have engaged, and will continue to engage, with all those who are worried about their local communities, the environment, congestion and traffic movement. They will all have the opportunity to petition this House and the other place. The clause is necessary to minimise disruption and allow the delivery of the proposed scheme, protects the bodies involved, and enables them to continue to carry out their duties.
Freight has been raised a number of times; I look forward to responding to the new clause on that issue. In anticipation, let me I point out that we are doing what we can to ensure that freight will support the movement of construction materials, whether aggregates or rail cement, during the construction of the railway.
Question put and agreed to.
Clause 43 accordingly ordered to stand part of the Bill.
Schedule 32 agreed to.
Clause 48 enables the Secretary of State to ensure that, following the construction of the scheme, he may impose conditions on land released where such land contains environmental mitigation for HS2. This is to ensure the maintenance of mitigation measures; upgrades to the mitigation, if required; and prohibition on uses of the land where such uses would detrimentally affect the measures in place. The clause binds successors in title into any covenant agreed with previous landowners. The Secretary of State or an authorised person may enforce the agreement.
This is an important clause, particularly the mitigating provision in subsection (2), which proposes planting trees and shrubs to replace habitat where work has been carried out. I cannot stress enough how important it is to get this right. We need to ensure that biodiversity needs are addressed with the right solutions. The proposal to replace trees with native species is positive, but we need to ensure that those species fit with the local environment, that there is proper biodiversity and that habitats are protected in line with local ecology.
As well as planting trees and shrubs, we need to ensure that they are in the right places so that, for example, they mitigate flooding and enhance the natural environment. New plantations should be open to the public where possible and we should seek to create environments that encourage biodiversity, so features such as natural watercourses should be used to their advantage.
The end of the route passes through the salt marshes south of Crewe. That is an unusual habitat and a special site in the country, so that should be taken into account in the preservation of the natural environment.
The hon. Gentleman raises an important point to consider when undertaking such a large construction project. We are working with all stakeholders he would hope we would work with, including the Woodland Trust, to ensure that we not only replace trees but plant them in the most appropriate places, and to mitigate as much as possible the impact on the environment. The substantial environmental statement covered most of those issues.
Question put and agreed to.
Clause 48 accordingly ordered to stand part of the Bill.
Clause 49
Power to apply Act to further high speed rail works
Question proposed, That the clause stand part of the Bill.
The Minister has addressed some of these issues, but it is vital to get this right. HS2 will allow for more reliable rail services. The current Secretary of State has plunged punctuality on the railways to a new depth—a 13-year low—and we must get on top of that issue. This is a tremendous opportunity to improve connectivity, and it is vital to get urban-to-urban connectivity within the country. We are committed to delivering a transformative package of investment across the rail network in the north of England, backed by a commitment of at least £10 billion to transform connections between major northern cities. The Government have touted similar plans, sometimes described as Northern Powerhouse Rail or HS3, but there is no commitment to the funding—it is interesting that the Minister used that point to address the financial side of the programme.
Any incoming Labour Government would rescope the project to seriously reduce costs and provide far better integration. Furthermore, there is concern over the accountability and the ability of our colleagues in this House to scrutinise HS2, ensure that costs are kept under control, and address the issue of public trust. We believe there is the potential to reduce the cost of HS2 by using a number of other technical measures—I will not address those in detail now—and the operation of HS2 is also contentious. Billions of pounds of taxpayers’ money is being invested in HS2, and it is right that revenues go back to the Exchequer and not into the hands of private train operating companies. HS2 should be run in the public sector as a public service. I will return to some of those points later in relation to the new clauses.
The Government have been somewhat inept in handling another specific aspect. HS2 has been rightly criticised for sometimes failing to provide value for public money. For example, the Public Accounts Committee described an unauthorised redundancy bill of £1.76 million as
“a shocking waste of taxpayers’ money”,
blaming it on
“weak internal processes at HS2”,
and there have been other concerns about the project.
I thank my hon. Friend for his intervention and particularly for pointing out the importance of the supply chain. I will add that the value of apprenticeships, degree qualifications and other opportunities for young people linked to the programme should be first and foremost in the Government’s mind when they come to look at the supply chain.
Returning briefly to clause 61, essentially it says that there is potential for uncapped Government expenditure, leaving open the possibility of no upper limit on the costs of HS2. Will the Minister update the Committee on the latest cost estimate, and does she believe that the project will be delivered at cost?
I remind the hon. Gentleman that we are here to scrutinise the Bill line by line, but I welcome the opportunity to remind everybody of the importance of HS2. Of course, it is a crucial project, linking eight of our 10 greatest cities. Supportive comments have been made recently by everybody involved, including the Mayors of Manchester and Liverpool and the leader of Leeds City Council, who have been watching very closely. They are northern, locally elected leaders who are waiting for HS2 to roll through their communities, because they fully understand not only that, at its peak, it will provide work for 30,000 people—most of those jobs being outside London—but its value for money and how it will smash the north-south divide, encourage our communities to come even closer together and force investment in rail infrastructure in the north of England for more than 100 years. This is a key infrastructure, social and economic project for our country.
(5 years, 6 months ago)
Commons ChamberOnce again, my hon. Friend is a true champion of his constituency, and he refers specifically to Henley Town Council. When a council has a good relationship and partnership with a bus operating company, decisions about where and how buses should run can be made close to home to ensure that services are run how passengers want. I want buses to be the most convenient, accessible and greenest form of transport across our country. This is not just about funding; it is about good relationships between local authorities and bus operating companies.
My hon. Friend the Member for Jarrow (Mr Hepburn) made an important point. Bus services are in deep crisis: funding has been slashed by £645 million a year in real terms since 2010; over 3,000 routes have been cut; and fares have soared by 2.5 times the increase in wages. It is therefore hardly surprising that passenger numbers have fallen by 10% since 2010. Will the Minister now apologise to the millions of pensioners, young people and commuters who rely on our buses?
Bus passenger numbers vary across the country, and I do not think it is appropriate for the hon. Gentleman just to whitewash bus services as if they were one national service. He should realise that bus passenger numbers are up by 15% in Bristol and by 38% in Poole, and bus passenger numbers are up among young people in Liverpool as well. Over £1 billion is spent on bus services, with some going directly to local authorities and some going to bus operating companies.
When the hon. Gentleman talks about the cost of a bus journey, it is important to remember that, every year, the cost went up three times as fast under the Labour Government than it ever has under this Government. Under Labour Governments, no matter how much change a person has in their pocket, they will never be able to afford that bus journey.
It seems that the Minister, sadly, may not fully acknowledge the depth of the crisis affecting our buses. For many people, buses are the only means of public transport. The crisis in our bus services is damaging our communities, particularly the young, the old and people with disabilities.
Our councils stand ready to help where this Government have failed. Indeed, the Minister references the work done by some excellent Labour councils across the country. On local election day, can she tell the House why the Government will not allow all local authorities the powers to regulate bus services and, indeed, to set up new council-run bus companies? Both measures have led to much-improved services across the country.
I can tell the House, on local election day, that we have put in place legislation under the Bus Services Act 2017 to allow local authorities to manage those partnerships with their bus companies to ensure that they deliver good value and good services locally. All local authorities need to do is to work on business plans and timetabling and they can bring those partnerships forward. They have not done that yet.
(5 years, 8 months ago)
Commons ChamberThe hon. Lady raises an important point. Bus passengers and disabled passengers have a close link, and it is right that someone’s ability to jump on a bus is about not just economics but social inclusion. That is why we launched the inclusive transport strategy last year. The concessionary bus budget is around £1 billion, which supports about 10 million passengers. That funding is concessionary and down to local authorities, which have very different packages up and down the country.
My hon. Friend the Member for Bradford South (Judith Cummins) made an excellent point, and on this Government’s watch the number of bus journeys is in freefall. Bus funding has been cut by £645 million a year, yet for many people bus services are a lifeline. When will the Government finally reverse those deeply damaging cuts?
The hon. Gentleman is right to say that bus services are a lifeline because, as I said earlier, not only do they get people to school and work, but they also tackle issues linked to loneliness. He is wrong about funding, however, because around £250 million is paid into bus services, and about £43 million of that goes directly to local authorities. We must understand what is happening up and down the country. In Reading, for example, just like in Bristol, Brighton and Liverpool, bus passenger numbers are up. That is why it is important to understand the powers in the Bus Service Act 2017, which enable local authorities to work with local bus companies and ensure a focus on the services that local passengers want.
(5 years, 9 months ago)
Commons ChamberI would not want anybody not to be flying to Alicante, but it is important to note that, when Labour was in control, bus fares went up three times as fast every year than under the Conservative Government. Anybody who wants to be out of pocket should vote in a Labour Government, because they will put up bus fares three times as fast.
It is clear that buses are a lifeline for many elderly people, particularly those living in rural areas, as my hon. Friend the Member for Bishop Auckland (Helen Goodman) has hinted at. They are also the main means of travel for commuters, yet as we have heard, this vital public service is in crisis. I should correct the Minister: bus passenger numbers have been falling every year since 2014, under her watch. The cross-party Local Government Association now says that half of all bus routes are in danger of closing due to a lack of Government funding. Surely it is now time for the Government to admit that they have made a serious mistake and for them finally to agree to properly fund our bus services.
Buses are indeed incredibly important. Not only do they help people to get to work, but they tackle wider issues such as loneliness. The Government provide more than £1 billion for concessionary fares, and a substantial amount of that— including the bus service operating grant—goes directly to local authorities to fund bus journeys.
It concerns me that Labour Members are desperately trying to turn buses into a political football. It is important to note that Wales, where Labour is in charge, has seen a bigger drop in bus miles than anywhere else in the United Kingdom.
(5 years, 10 months ago)
Commons ChamberI no doubt do not need to point out to the hon. Gentleman that I am a she, not a he, but no matter.
We are very supportive of community transport operators, which was why the consultation was so important. We will make sure that our response actually fits the fantastic voluntary work that takes place within our community transport network.
Community transport is a lifeline for many older or disabled people who would otherwise be trapped in their own homes, yet the Government propose to introduce a significant and unwanted extra burden on the charities that run those vital services. Age UK has reported that the majority of its community transport services would be forced to close because of the Government’s mistaken proposals. Will the Minister commit to reconsidering her approach and to working with, rather than against, the charities that run those vital services?
I am a little confused by the hon. Gentleman’s statement, because the Government are yet to put out our response. We are working with the charities sector, including with the Community Transport Association and community transport operators. There is an EU regulation that we are trying to make this fit into, but we are committed to ensuring that our community transport operators continue to operate. That is why we have the £3 million fund and the £11.5 million building connections fund.
(6 years, 4 months ago)
Commons ChamberLocal authorities receive a substantial amount of money from central Government to support bus services. The Government paid out some £250 million last year to support bus services in England. Kent County Council receives over £1 million per year, and Canterbury City Council receives over £83,000 per year. The hon. Lady mentioned bus fares. They rose almost three times faster every year under Labour than under the Conservatives, with local bus fares across Great Britain rising by an average of 1.9% each year in real terms. Bus fares go up under Labour.
May I, too, wish the NHS a very happy birthday?
Nearly 500 bus routes have been cut every year under this Government, snatching away a lifeline from elderly, disabled and young people, as well as from rural communities, yet the Government seem unaware of the impact of these cuts. I have to say that the Prime Minster floundered yesterday, and sought to blame local authorities. Does the Minister share that view, or does she accept the undeniable truth that her Government have totally mismanaged bus provision in this country?
Bus passes for the most vulnerable, older and disabled people are being supported by this Government with £1 billion, enabling 10 million people up and down this country to travel for free. As you may be aware, Mr Speaker, this is Catch the Bus Week, so the hon. Gentleman could have said something about bus services to encourage people to jump on the bus. There are good case studies up and down the country. In Liverpool, for example, young people are taking buses 142% more than they did in the previous three years. In Bristol, bus patronage has gone up by 42%, and in South Gloucestershire by 38%. There are good case histories of places up and down this country where bus patronage is going up.
I appreciate the fact that the hon. Lady has mentioned Catch the Bus Week. Rural communities have been hit particularly hard by the crisis in our bus services. Interestingly, we have visited Northamptonshire—bankrupt Tory Northamptonshire, I should say—which has one of the worst track records for cutting services. What would the Minister say to the resident I met yesterday, who told me there is no bus to take her child to school and that an older daughter has been unable to take up her preferred job option because there is no bus service?
(6 years, 6 months ago)
Commons ChamberI welcome the invitation to Cornwall—my summer holiday seems to have been sorted out—and I welcome the new First Kernow buses. I also welcome the fact that the local authority in my hon. Friend’s constituency has worked with the private operator and with the Member of Parliament. That shows that if people and organisations work together, they can put bus services together, even in rural communities.
Since 2010, bus budgets have been slashed by a third and over 2,500 routes have been withdrawn entirely. The Government recognise that franchising boosts patronage and improves services, which is why franchising was extended to the metro mayoralties. Why then in the midst of a bus crisis is the Minister refusing these same powers to councils across the rest of the country?
Packages for buses are at an all-time high, and I would ask why the mayors who already have the powers have not taken them up. The policy at the moment applies to London and the Mayors of Manchester and Liverpool, so I suggest the hon. Gentleman ask his own Labour Mayor of London why he has not taken these powers up.
(6 years, 6 months ago)
Westminster HallWestminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.
Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
We have had the action accessibility plan, which we will respond to shortly—within the month.[Official Report, 10 May 2018, Vol. 640, c. 10MC.] We are working with the Royal National Institute of Blind People and the charity Guide Dogs. We meet regularly with them to talk about how we can make the information available on all our buses, and in the most appropriate form. Unfortunately, during a trial some passengers complained that too much information was being given out all the time, and that occasionally the wrong information was given out. We are working on that with all the charities involved with people with visual impairments.
The hon. Member for Reading East (Matt Rodda) has talked about concessions for younger people on several occasions. I draw attention to the comments made by the hon. Member for Keighley (John Grogan) that any concessions or free bus service available for younger people has to be financially robust and stand up to the rigour of examination. The Government recognise that public transport is of particular importance to young people, and that the cost of travel can cause difficulty for those seeking education, training or employment opportunities. That is why a trial extension of discounted rail travel for 26 to 30-year-olds has recently been announced. That industry-led initiative to gather evidence on a full roll-out has seen a 100% take-up. The first phase of the trial saw 10,000 railcards sold across Greater Anglia, including Cambridge.
As I mentioned, local authorities have the powers to offer travel concessions on buses to local residents, and there are many examples of that for groups such as students. As part of the Bus 18 partnership between operators and West Yorkshire combined authority, there are half-price tickets for young people up to the age of 19, and pupils wearing their school uniform will no longer have to show a half-fare bus pass. In Liverpool, the voluntary bus alliance between Merseytravel, Arriva and Stagecoach has seen a flat fare of £1.80 for young people, with growth of 140% in bus travel by young people, as well as overall passenger growth of 16%. In Hertfordshire, young people aged 11 to 18 can pay £15 for a card that entitles them to half-price fares on local services.
There is more to encouraging bus use than cost alone. A recent report by Transport Focus found that young people want better access to information about buses. That is why we introduced powers through the Bus Services Act 2017 to require operators to provide better information on fares, timetables and when the next bus will arrive. In addition, a national scheme such as that in place for older and disabled people would require a change to primary legislation, but there are no plans to do that at present. The hon. Member for Reading East will appreciate that this is a complex area and there are no quick and easy solutions. The Department continues to work with local authorities and bus operators on young people’s travel.
I return to the comments made by the hon. Member for Keighley on the robust nature of the budget put forward for free bus travel for the under-25s. Labour originally calculated that policy to cost more than £1 billion, but unfortunately, the numbers were later calculated to be closer to £13 billion. At the moment, that has not reached robust investigation in Westminster Hall.
I thank the Minister for her support and praise for local discounted schemes. I want to raise the report by University College London, “Social prosperity for the future: A proposal for Universal Basic Services”. Although we are not proposing this—perhaps to the disappointment of my hon. Friend the Member for Cambridge—the research by University College London estimates the possible cost of free bus travel for every person in the UK to be £5 billion per year. That suggests that the Minister’s estimate of £13 billion is somewhat excessive. Our estimate of £1.3 billion has been costed carefully.
The hon. Gentleman started at £1.3 billion and then moved on to £5 billion, which possibly could reach £13 billion—I am a little nervous about the true figure. We already have a concessionary programme that costs £1 billion. To announce something as available without it having been costed would do the bus industry no service.
The hon. Member for Kilmarnock and Loudoun (Alan Brown) mentioned apprentices; the Department is considering concession options for apprentices and is completing research on a feasibility study. We will report on that later this year and it will inform the development of the policy. There are no plans to fund such a scheme but we will see what the feasibility study concludes.
Reimbursement by local authorities to bus operators is made on a “no better off, no worse off” basis. The hon. Member for Cambridge noted that reimbursement appeals have been in decline and have reached a new low. In 2006-07, there were 69 appeals, but in 2017-18 there were just 21. That means that operators are fairly recompensed for the cost of providing concessionary travel in both urban and rural areas. The reimbursement mechanism is now fit for purpose, as shown by the large fall in reimbursement appeals in recent years. EU state aid rules do not allow the Government to provide the concessionary scheme on any other basis—it cannot be used to provide hidden subsidy to operators.
Much has been said about the increase in pension age; the state pension age of men and women is being equalised. The pensionable age for women has risen gradually to reach 65 this year, and the state pension age for both men and women will rise to 66 by 2020. Equalising the age at which free bus travel applies makes the national travel concession scheme more sustainable. Finding efficiencies in this way rather than cutting back on the entitlement offer to older and disabled people is the best way to focus support on those who need it most.
It is right that Government support focuses on the most vulnerable members of society. The Government believe that local authorities are often in the best position to offer concessions that work for the people who live there. All local authorities have powers to introduce concessions in addition to their statutory obligations, including the extension of concessionary travel to those who are yet to reach the qualifying age. For example, in Cambridgeshire, the largest operator offers half-price travel to jobseekers.
I return to the point raised by the hon. Member for Cambridge about securing funding for concessionary travel schemes, which sit across many Departments. He was right to note that the Ministry of Housing, Communities and Local Government is responsible for the concessionary travel budget. The Treasury is jointly responsible for local authority ring-fencing. I work with all those Departments to ensure that we get the best that we can for bus services. We have just agreed a further two-year ring-fence for the local authority element of the bus service operators grant for the next two years.
The hon. Member for Cambridge also mentioned franchising; he will be aware that any local authority can request franchising, but will need to demonstrate delivery capability and a track record of doing so. We will see how that pans out.
I want to quickly talk about air quality and congestion, which was raised by the Chair of the Transport Committee, the hon. Member for Nottingham South (Lilian Greenwood). We have recently made some good announcements on that. The Government are committed to buses being greener, which is why we announced an extra £48 million for ultra low emission buses. That follows £30 million in funding for 300 new buses through a low emission bus scheme and £40 million for retrofitting 2,700 older buses to reduce tail-pipe emissions of nitrogen dioxide through the clean bus technology fund. We are trying to make journeys easier and more accessible, and to ensure that the concessionary bus pass remains in place.
I hope that I have demonstrated that the Government are committed to protecting the national concessionary travel scheme for buses. We are keen to do what we can to improve bus service patronage. Of course, I will meet with the hon. Member for Cambridge if he has good evidence of best practice, especially of initiatives that have taken place in other countries that we can use here, and especially if they involve new, innovative technology, to learn as much as we can to ensure that the Department is doing what it can to increase bus patronage.
We are determined to ensure that bus patronage increases as much as it can, and we are focused on delivering concessions to those who need it most, while allowing local authorities and operators the flexibility they need to support their local populations. It was interesting to hear that, as we get older, we migrate from the front of the bus to the back of the bus, and then to the front of the bus again. Hopefully, we can all wait our turn until we get hold of our concessionary bus pass. Some will have to wait a little longer than others, but it will definitely be there, once we reach our old age.
(6 years, 7 months ago)
Commons ChamberWith free bus travel for the under-25s estimated at £1.4 billion a year, why is the Minister opposing a scheme that could benefit up to 13 million young people, saving them up to £1,000 each a year, at a time when they face significant financial hardship due to tuition fees and the high cost of living?
This was an intriguing policy proposed by Labour at the Budget, and the figures did not seem to add up. At one point Labour was saying it would cost just over £1 billion, but it looks like it might cost closer to £13 billion. The hon. Gentleman needs to go back to school and add up his figures. We already provide £1 billion towards concessionary travel to support up to 10 million older people, and disabled people, too. I would be intrigued to know whether Labour has budgeted for this concessionary travel to be before or after 9.30 am.
Can the Minister explain how she has calculated that figure of £13 billion? Research by University College London, which is widely accepted across the sector, shows that every individual person in the UK could be given free bus travel for £5 billion.
The figures have already changed from around £1 billion to the projected figure of over £13 billion, and now to £5 billion. When the shadow Minister makes proposals, and if he wants not only the sector but young people to take them seriously, I suggest that he comes to the Dispatch Box with the most accurate figure that comes to hand. We are doing what we can to support bus patronage, including enabling local authorities to work with bus providers to make sure that people can make the most requested journeys. I must add that we already provide over £1 billion-worth of concessionary travel to older people and to those with disabilities, and perhaps we could take Labour’s proposal more seriously if the figures added up.