Lord Shutt of Greetland debates involving the Department for Transport during the 2019 Parliament

Wed 11th Mar 2020

HS2

Lord Shutt of Greetland Excerpts
Wednesday 11th March 2020

(4 years, 1 month ago)

Lords Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Lord Shutt of Greetland Portrait Lord Shutt of Greetland (LD)
- Hansard - -

My Lords, I too congratulate the noble Baroness on securing this debate and note that she has drawn attention to the changed circumstances. She also used the words “white elephant”. The reason I am speaking is that I want to prevent HS2 being a white elephant, in that I am concerned about integration and connectivity.

I have been a long-term supporter of HS2 on the basis that more capacity is needed. Incidentally, the noble Baroness should be aware that HS2 is nothing more than a replacement for a railway that we used to have called the Great Central. That is all it is, quite frankly. It is another line from the north to south that was taken away by Beeching; HS2 is a replacement. I am concerned that HS2 should be part of the whole railway system, with connectivity—indeed, integration—between HS2 and the traditional railway.

I have never been happy about the hammerhead terminal in Leeds, where the line came up and was ended—as it were—as the shaft of the hammer, even though the shaft of the hammer has now been moved nearer the mainline terminus in Leeds. It was my belief that it had already been agreed that there would be a link between the HS2 phase 2b northern link in the direction of York—for a junction to be provided so that HS2 trains could reach the north, west or, indeed, south of Leeds by reaching Leeds from the east.

It is important that people understand the railway geography of Leeds. In effect, if Leeds city station is the centre, there are eight points. Only one of the those is to the east. Everything else goes to the west, to the other seven points. So, whether west means going to Harrogate, Bradford, Ilkley, Skipton, Carnforth and Carlisle, to Bradford, Halifax, Calder Valley and Manchester, to Dewsbury, Huddersfield, Manchester Airport, Liverpool, back down to Wakefield, Doncaster and Sheffield, to Normanton, Barnsley, Sheffield and Nottingham, or to Castleford, Pontefract and Goole, it is all from the west side of the city of Leeds. If you are to have any connectivity and integration, with trains coming from the HS2 network and continuing somewhere else—Leeds is a very important place, but it is not the only place in Yorkshire—it is very important that we serve other places in the old West Riding, in West Yorkshire, as well as Leeds.

Presently, under our traditional railway system, we have trains from King’s Cross. Within the last year, we now have trains every two hours to Harrogate rather than one a day, as well as a train to Bradford Forster Square and a train to Skipton; that is three different directions. We are also promised a train to Huddersfield every two hours, although goodness knows when it will happen. I do not know what the plans will be regarding what will be served by HS2 through extending, or whether these places are to be served only by a traditional railway. I do not know whether anybody knows. But there has to be at least the possibility and opportunity that other places in Yorkshire can be served by HS2—not only Leeds.

It may be that the Minister will tell us about Northern Powerhouse Rail. I want to be certain that the whole business of connectivity in Yorkshire does not fall between two stalls—that it is picked up in either in the HS2 programme, which it should be, or the northern powerhouse programme, which I think is somewhat vague. I hope the Minister will be able to say that we are sticking to the position that has been recommended. Oakervee says to stick to the full Y-shaped network. I hope that Y-shaped network will embrace the opportunity of proper integration within Yorkshire.

--- Later in debate ---
Baroness Vere of Norbiton Portrait Baroness Vere of Norbiton
- Hansard - - - Excerpts

I agree with the noble Lord: that is a significant point. This new train line is also about adding resilience. Now, if the west coast main line goes down, as I believe it did yesterday—for which my apologies—there is no plan B. Therefore, it would certainly give the people of Wales a plan B to get them either from London to Wales or vice versa.

The integrated rail plan terms of reference were published in late February—they may have been published on a Friday, but this Government work on Fridays. The Secretary of State aims to publish the plan by the end of the year. We want to get this right. It is important that we get it done, but it must be right. The noble Lord, Lord Adonis, made a couple of references to the Oakervee Review and various conclusions therein. Conclusion 11 recommended that we undertake a circa six-month study of the 2b scope in the context of the Midlands Engine Rail and Northern Powerhouse Rail proposals, so it is one of Oakervee’s conclusions. Conclusion 12 recommends that the Government consider smaller Bill phases

“to allow easier scrutiny of proposals in Parliament and faster construction”

so we may look at that. To do the phase 2b Bill in one go will be a challenge, but I am sure it is doable and that we have the stamina to do so. However, if it would be helpful, it might be a good idea to have smaller Bills. The Government’s next steps are therefore consistent with what Oakervee suggested.

On the comments of the noble Lord, Lord Greaves, on the route, the Secretary of State has committed to delivering HS2 to Leeds via the east Midlands; we have no plans to route HS2 trains from London to Leeds by Manchester.

On the specific issue of Leeds station, the HS2 station design for Leeds aims to integrate an HS2 station with the existing conventional station to allow for easy access and interchange between HS2, Northern Powerhouse Rail and local services across West Yorkshire and the north.

There was an original plan in Leeds to locate the HS2 station towards the south, but work to review the options further in 2014-15 recognised that priority should be given to greater interchange.

Lord Shutt of Greetland Portrait Lord Shutt of Greetland
- Hansard - -

There is a difference between having an interchange at the hammerhead and a junction at the east so that trains from the south can go to all other places.

Baroness Vere of Norbiton Portrait Baroness Vere of Norbiton
- Hansard - - - Excerpts

I suspected that I would not keep the noble Lord 100% happy. I will certainly write to him.

I have various elements on the environment but that was not in the topic of the debate so I will have to write to the noble Baroness because I am out of time, which is incredibly disappointing.