Rail (East Anglia)

Lord Jackson of Peterborough Excerpts
Tuesday 3rd July 2012

(12 years, 4 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Thérèse Coffey Portrait Dr Coffey
- Hansard - - - Excerpts

That is a fair point. We have all been united in our vision of wanting better services for our constituents. We may have been less united, in our discussions with Network Rail and LEPs, on what that meant. I would like to think that the intentions of hon. Members across the counties have always been clear. This is not about trying to reduce services for our constituents, but improving them.

Lord Jackson of Peterborough Portrait Mr Stewart Jackson (Peterborough) (Con)
- Hansard - -

I congratulate my hon. Friend on securing the debate. She has not mentioned the pre-eminent city in Cambridgeshire—Peterborough, as opposed to Cambridge. I jest. Does she agree that the great advantage of this prospectus, apart from its ambition, is that it is comprehensive and holistic? It integrates different modes of transport. It is not just a list of discrete transport schemes. There are references to the Felixstowe to Nuneaton freight corridor, taking the pressure off the A14 and the A11, and traffic movements to Stansted airport, all of which show that the prospectus is ambitious and, in the long run, will be good for the taxpayer as well as the local people in East Anglia.

Thérèse Coffey Portrait Dr Coffey
- Hansard - - - Excerpts

My hon. Friend is absolutely right, and reinforces the point that investment in our rail infrastructure could mean that our region, rather than other parts of the country, can be a huge multiplier. The idea that people want to travel up to Lowestoft by car to have a look at investment is ridiculous. Along the east Suffolk line, sitting in a one-carriage train, perhaps after making the connection at Ipswich, is not always the most attractive way to arrive for an investors’ meeting.

For a quicker service on the great eastern main line, we need to speed up the trains. One way to do that is to focus on level crossings. I will refer to this again when I come on to the issue of branch lines, but we need to ensure that there are stretches where trains are unhindered. We also need to open up capacity at Liverpool Street station. Certain things have to happen before any of that can take place. Crossrail will have to be completed, which we hope will happen by 2018. We have to continue the work at Bow Junction to ensure that those lines can be used and that we get those slots. Peak services along the great eastern main line are already at full capacity. Although freight currently runs on the line, it does not do so during peak times. Extra capacity, therefore, is critical.

I do not pretend to be a rail specialist. I do not know the difference between four-tracking, the clever loops that Network Rail is now thinking about, or the extra bit of track that is needed in that stretch near Chelmsford. What I do know, however, is that there are clever brains working on solutions that will mean that we can open up vital capacity. By doing so, we can increase reliability and speed.