All 1 Debates between Earl of Lytton and Lord Crickhowell

Tue 11th Feb 2014

Water Bill

Debate between Earl of Lytton and Lord Crickhowell
Tuesday 11th February 2014

(10 years, 10 months ago)

Lords Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Earl of Lytton Portrait The Earl of Lytton (CB)
- Hansard - -

My Lords, I have a great interest in this group of amendments. I certainly understand the geometry that lies behind it, particularly that outlined by the noble Lord, Lord Campbell-Savours. I probably follow the noble Earl, Lord Cathcart, in this. As I understand it, Flood Re will have significant start-up costs. Also, the Environment Agency’s investigation and collation of information from the hazard risk assessments, which it is charged with carrying out, will be a draw-down on the Flood Re fund. That means that, in the early years, there may be significant sums taken out of the pot. I understand that the intention is that the Government should put in plan B configurations to deal with that eventuality. However, given the sporadic and capricious nature of severe flooding, we do not have any time to waste in putting measures together to improve resilience and protect properties where they can be protected.

I have a technical interest in this: I am a practising chartered surveyor and property valuer. I am also involved in the parish and town council sector, as is well known. I can see the rationale behind an early start for communities and individual property owners coming together to create robust schemes. We need to do that as soon as the present flood waters have died down, as I hope they will. Time is of the essence, because we do not know when the next flood will come. There is a conundrum between the build up of the pot of Flood Re on the one hand and spending funds on resilience and protection on the other. In a later group of amendments, I will say a bit more about Flood Re, which is intended to cover a very limited and narrow range of circumstances. I will explain why I think a larger problem of an entirely different magnitude is lurking here.

We need to make a start. On the basis that the economy is improving, this is exactly the time when these investments need to be made. I will be very interested to hear what the Minister has to say about the pot, how it will be funded and how we get the early years’ work put in place. Like the noble Earl, Lord Cathcart, I obviously would not want to see the pot devoted to one large project to the exclusion of all others. I am sure that would not be the case. If we do not get this right, the credibility of FR is likely to falter. I think that is something on which the Minister can elaborate.

Lord Crickhowell Portrait Lord Crickhowell (Con)
- Hansard - - - Excerpts

My Lords, one of the great advantages of modern technology is that you can discover something you did not know anything about while a debate is taking place. As this debate started, I chose to look at a Defra website on obtaining flood insurance in high-risk areas. At the top of the main page, a number of participants are indicated: BIBA, the Environment Agency, Which?, ABI, the National Flood Forum and Defra. Flood Re does not appear there yet. Can the Minister say how far the department has already gone down the road that is suggested here? This website, which contains a great deal of other valuable information on the steps you could, and should, be taking, already exists. Presumably, at some point Flood Re will be fitted into the whole arrangement. My only anxiety about the Flood Re participation is that indicated by my noble friend—namely, that against the present background, I only hope that there is a surplus in the early years because the fact is that we could have a situation whereby, far from having a surplus in the early years, we have a substantial loss. However, as there is a website and as a good deal of advice is being given by the department—I think it is rather good advice—perhaps my noble friend will indicate what the department’s overall approach is and how he sees Flood Re fitting into what is already going on.