Tuesday 8th March 2016

(8 years, 2 months ago)

Public Bill Committees
Read Hansard Text
Robert Goodwill Portrait The Minister of State, Department for Transport (Mr Robert Goodwill)
- Hansard - - - Excerpts

It is a pleasure to serve under your chairmanship, Mr Chope; a very good morning to you.

The intention of the new clause, as the hon. Member for Middlesbrough has said, is to require the nominated undertaker to have regard to the design panel’s recommendations during the design work for phase 1 of HS2. The design panel was established in November 2015. I hope I can give the hon. Gentleman the assurances he seeks, and that he will not feel it necessary to press the new clause to a vote.

We recognise that great design is essential for High Speed 2. We want it to make the country proud and show the world what great British design can do. For that reason, HS2 Ltd has created a design vision for the railway, and we have set up an independent design panel to provide advice on and a critique of the development of HS2, to help it achieve its design vision.

The remit of the panel is based on widely accepted industry best practice, as set out by the Design Council and other design bodies. HS2 Ltd, in designing the railway, is required by the Department’s development agreement to incorporate the recommendations of the design panel, where this is practical. Binding assurances to this effect have been given to local authorities, including Birmingham City Council, the Greater London Authority, and others. The independent design panel is only just being established, but HS2 Ltd would be expected to follow any recommendations made by the successor of the design panel, and the development agreement would be amended accordingly.

I have to say we made some mistakes at the start of the scheme, when a number of cut-and-paste viaducts were used to indicate the line of route. Some communities were alarmed to see viaducts of that type, which had no design element incorporated in them; they looked like concrete boxes on legs. That is not the intention. We intend to have some iconic designs, and I think the design of the railway will be awesome in places; in others it will be more sympathetic to the location. The design panel is integral to delivering that. Therefore, I believe that the Opposition’s concerns have already been met, and that the new clause is not necessary.

Andy McDonald Portrait Andy McDonald
- Hansard - - - Excerpts

I am extremely grateful to the Minister, who set out with great clarity the fact that there is a requirement to incorporate the recommendations, with a raft of binding assurances. I am content with that, and I beg to ask leave to withdraw the motion.

Clause, by leave, withdrawn.

New Clause 21

Passenger services: public sector operation

(1) Section 23 of the Railways Act 1993 (franchising of passenger services) does not apply to services operated on the whole or part of the high speed rail line so provided for in this Act.

(2) Passengers services on the whole or part of the high speed rail line so provided for in this Act shall be provided by a publicly owned railway company.

(3) In this section, “publicly owned railway company” has the meaning given to it in section 151(1) of the Railways Act 1993. —(Andy McDonald.)

This new clause would require passenger services operating on the whole or part of the high speed rail line to be provided by a publicly owned railway company.

Brought up, and read the First time.

--- Later in debate ---
Jonathan Reynolds Portrait Jonathan Reynolds
- Hansard - - - Excerpts

I did not intend to speak, but as the debate is so interesting I cannot resist the chance to say a few things. In my experience, this debate always reflects pre-existing ideological positions and, frankly, does not often tend to delve into the intricacies of what is best for running a railway. That can be seen in all parts of the House of Commons whenever this debate comes up.

For Government Members there are some difficult facts about our present system that need to be addressed. The existing railway in the UK could not strictly be described as a privatised system. It is a hybrid system; the way that it was initially privatised secured that. A true privatised system would perhaps have been to bring back the Big Four railway companies and have them compete against each other, but that is not what we have at the moment.

There has to be acknowledgment that the system depends on public subsidy. A railway system for a country such as ours would always need a large amount of subsidy. The way that we do that now is to give the subsidy to Network Rail for the infrastructure. When we talk about the francishees paying premiums to the taxpayer, it is because we set the access charges according to the subsidy that we give. It is still a system that requires a net contribution from the taxpayer.

We also have to reflect on the fact that the existing hybrid system is as it is because the initial privatisation simply could not cope with the liabilities. Railtrack simply could not deliver on what was promised, even in the initial honeymoon period. There has to be a reflection that East Coast did work extremely well, even if it was initially intended for a limited period. In effect, many of our railway operations are publicly owned; they are just publicly owned by foreign Governments. Their subsidiary companies operate our system. In addition, our ticketing system is bizarre and complex, and much more expensive than in comparable European countries.

The Opposition and those who traditionally push a nationalised position have to reflect that British Rail was a poor service. We cannot look back to any golden era; I have never pretended that that existed. Equally, when we talk about East Coast we have to reflect that that operated within an overall system of incentives and penalties; that is the privatised operations system that we have.

Fundamentally, we have to recognise that franchises are contracts. Contracts can be good; they can be bad. Some of our initial franchise agreements on the railway were frankly abysmal in the system they operated. Others that have been let more recently have been more effective.

I will vote for the new clause for two reasons: integration and flexibility. Railway systems around the world tend to be more successful with a higher degree of integration between infrastructure and operations. Our existing system causes real problems, and many of the problems for passengers come from that lack of integration.

As the right hon. Member for Chelmsford said, flexibility is the key issue. He mentioned the additional operations from Scarborough being run by Virgin. Although that is welcome, flexibility is the crucial problem with the franchise system. Northern has had huge demand in terms of passenger numbers—it has happened in my constituency. The economy has fundamentally changed and there is huge demand for rail services—in many ways it is a golden era for the railway. However, the franchise agreement could not respond to that demand. It was let on the assumption of zero growth, and I would not have complaints about the people and the process for doing that. Yet we have all the problems of a bureaucratic, nationalised system and none of the attractions of a market system, which would respond to a price signal from the market. That is why we have problems of overcrowding, poor services and inability to meet demand.

There are many examples of successful, publicly-owned railways around the world. I recently got back from Hong Kong, which is not renowned as a socialist utopia—it is a dynamic, capitalist part of the world economy, with a publicly-owned railway. We can always look to examples from that country; indeed, we need to look around the world for best practice in running a railway. I am comfortable with the new clause, because we need to look at how best we can integrate our railway, to deliver the best deal for passengers. It should be permissive: we always need to leave the door open for a more integrated system, even if we have our existing hybrid system at the moment, which—based on the length of those franchise agreements—will be with us for a considerable time. This conversation needs to be focused more on the best way to run a railway and less on pre-existing ideological positions.

Robert Goodwill Portrait Mr Goodwill
- Hansard - - - Excerpts

The intention of the proposed new clause is to require passenger services operating on whole or part of the high speed line to be provided by a publicly-owned railway company, essentially nationalising HS2 train services. I regularly travel on the east coast main line—indeed, the hon. Member for Middlesbrough and I travelled on the same train on Monday morning, on the Grand Central service, which was set up by buccaneering free market innovator Tom Clift, who is sadly no longer with us, and his team. That successful open-access operator has been taken over by Deutsche Bahn. It regularly tops the league in passenger satisfaction and punctuality. Most of the staff come from Sunderland and they are a model of the customer service that we expect on our railways.

The proposed clause would restrict the operating structure of HS2 at this early stage—essentially seeking to nationalise the HS2 rail service, which is against the broader principles of how successful rail services in the UK are currently operating. My right hon. Friend the Member for Chelmsford has done my job for me in making the case to reject this new clause.

With regard to the commercial operation of phase 1 of HS2, it is imperative that we keep our options open. With the line not due to open until 2026, decisions on the commercial model to operate HS2 are some time away. Whatever those decisions might be, they will be made to seek the best value. This is about delivering the best service at the best price for the passenger and the taxpayer, not pandering to outdated 1970s socialist dogma. The rail franchising system is designed to deliver benefits for passengers and taxpayers, which are realised through competition. Since privatisation the rail industry has been transformed, with passenger journeys more than doubling over the past 20 years, from 750 million to around 1.6 billion. We believe that this remains the right approach overall in delivering the best value for the country and tax and fare payers.

The model that is being delivered in the UK is being emulated around Europe: for example, National Express is operating two franchises in Germany. As we have heard, the east coast main line is extending new services to Middlesbrough and Sunderland, and we have heard this week that a direct service to Scarborough is being considered. If one needed an image that encapsulates what is wrong with British Rail, it would be the pacer train, which was built by British Rail under a nationalised British Leyland. It was an infinitely unpopular train, and when this Government came to power we gave a pledge to phase it out.

Jonathan Reynolds Portrait Jonathan Reynolds
- Hansard - - - Excerpts

The Minister and I have had this exchange about the pacer train before. Has the longevity of the pacer train not been due in part to the fact that they are very cheap to run? Under the franchised model, it has been very hard to get rid of them, unless there has been an explicit overruling of the market system by Ministers. The private operations—the market—cannot get rid of the pacer trains; it has to be a political decision.

Robert Goodwill Portrait Mr Goodwill
- Hansard - - - Excerpts

The pacer train was the offspring of the position that a state-run railway can often find itself in, faced with other demands on public sector finances, not least the health service. Built on the cheap, with single-axle units without bogies and the correct suspension, the pacer trains were never going to be fit for purpose and were very unpopular. I am delighted that the Government are going to phase them out.

Jonathan Reynolds Portrait Jonathan Reynolds
- Hansard - - - Excerpts

Surely the Minister recognises that he, or certainly his Secretary of State, has had explicitly to overrule the civil service—by ministerial direction—to get rid of the pacer trains. There has had to be an explicit political decision, because the market alone would not have got rid of it.

Robert Goodwill Portrait Mr Goodwill
- Hansard - - - Excerpts

Another factor in our ability to phase out the pacer is the fact that with new rolling stock coming in in so many areas, we have other rolling stock cascading down to replace the pacers. This is a direct result of the investment in the rolling stock. On the east coast main line we look forward very much to the IEP trains built by Hitachi in the north-east, which, I think, will be a phenomenal improvement to that service and free up rolling stock for some of the new services that will be provided on the non-electrified part of the network.

Section 24 of the Railways Act 1993 states that the appropriate designating authority—in the case of HS2, the Secretary of State—may by order grant exemption from designation of a service to require a franchise under section 23(1) of that Act. Therefore, if so decided, the HS2 service will not require a franchise. However, as I have already stressed, the commercial model to operate the HS2 infrastructure and train service are yet to be determined. To speculate, it may well involve some sort of transitional phase in the early years.

With the ability to exempt a service from the franchise requirement set out in the Railways Act 1993, I do not believe it is necessary to include the proposed new clause in the Bill. With that explanation, I hope the hon. Member will withdraw his proposed new clause, although I am not too optimistic that he will.

--- Later in debate ---
This is a straightforward political choice; we respectfully acknowledge that. I caution against describing as outdated the desire of the British public to see their own railway services and railway infrastructure run by the state. They look to other countries. The Minister alluded to the breaking out of the franchise system across the European Union, but I think he would have to concede that the structures in Germany, France or Spain look starkly different from the one that obtains in the UK at the present time. He may be right that there is some development, but as we speak, we are very much an outlier in terms of the proportion of private franchise operations running our rail services.
Robert Goodwill Portrait Mr Goodwill
- Hansard - - - Excerpts

I suggest that rather than being an outlier, we are leading the way.

Andy McDonald Portrait Andy McDonald
- Hansard - - - Excerpts

That is an ingenious way of interpreting stark distinctions between the United Kingdom and, for example, Germany. Deutsche Bahn provides the majority of infrastructure services in Germany, and it is coming into the UK for the rich pickings and to take our taxpayers’ investment back to Germany’s railway system.

I politely caution the Minister against describing our amendment as representative of an outdated “1970s socialist dogma”. If that was right, there would be some cause for concern, because this idea is extremely popular with the general public. Surveys done in recent times have suggested there is concern about the fact that taxpayers’ money is being used to fund state-owned companies such as Deutsche Bahn, Nederlandse Spoorwegen and Keolis. If the Minister wishes to ignore that, that is a matter for him. We have had a good debate, but this is such an important new clause for HS2 that we wish to press it to a vote.

Question put, That the clause be read a Second time.

Division 6

Ayes: 6


Labour: 6

Noes: 10


Conservative: 9

New Clause 22
--- Later in debate ---
Andy McDonald Portrait Andy McDonald
- Hansard - - - Excerpts

I beg to move, That the clause be read a Second time.

From nationalisation and re-privatisation to perhaps something a little less contentious. The new clause concerns the role of the construction commissioner. I will not read into the record its nine subsections, but it would allow the commissioner to consider complaints without being limited to the amount of claims for compensation. It would also require the commissioner to be appointed by a process of open competition.

In January, HS2 Ltd announced that it was looking to recruit a construction commissioner to investigate any issues that arise during construction of the much-needed new infrastructure project that cannot be resolved through its corporate complaints procedure. In December 2015, it published an information paper that outlined proposals for the commissioner, which stated:

“The Secretary of State will ensure that a Construction Commissioner is appointed by the time construction begins. If people have a complaint during construction that cannot be resolved through the nominated undertaker’s complaints process, they will have the option of referring their complaint to the Construction Commissioner.”

That is a welcome move. I note that during the construction of Crossrail—the Elizabeth line—a construction complaints commissioner performed an equivalent function. There is, however, no reference to the role of the HS2 construction commissioner in the Bill, so I want to press the Minister on what the commissioner’s role will include and exclude with reference to what the information paper states is expected.

The commissioner’s role is not to include the consideration of claims over £10,000. On 26 February 2016, in answer to written question 28079, the Minister said:

“This figure is provisional, based on other infrastructure projects, and will be subject to review by the steering group.”

I invite him to explain whether the limit should be set at £10,000. Does he think that might constrain the commissioner’s effectiveness in investigating issues that arise during construction?

The information paper also stated that the commissioner’s role will not be to consider

“matters considered by Parliament in approving the project”.

I fear that that may be unnecessarily restrictive and could be exploited to prevent the commissioner from carrying out his or her role effectively. The Bill has a long and complicated legislative history, so I am concerned that a liberal interpretation of that would allow the commissioner to consider hardly any complaints, as almost every issue will have been considered at one time or another by Parliament in approving the project.

It is important that the commissioner is not unnecessarily restricted in his or her role, so I invite the Minister to clarify the commissioner’s role in relation to matters considered by Parliament in approving the project. If the commissioner is not to consider “matters considered by Parliament” or claims “over £10,000”, there would not appear to be a lot for them to get their teeth into. I want to probe those issues and try to secure clarification and reassurance. I look forward to what the Minister has to say.

Robert Goodwill Portrait Mr Goodwill
- Hansard - - - Excerpts

I will say at the outset that I share the hon. Gentleman’s wish for an effective construction commissioner, and I reassure him that after an open advertisement for candidates HS2 is in the process of appointing one. His or her role will be similar to the one set out in the new clause, but with some exceptions.

The appointment will address the points covered in subsections (1) and (2) of the new clause. The matters covered in subsection (3) will be limited to small claims, as it is more appropriate for larger claims to be dealt with through existing legal processes, such as the lands chamber of the upper tribunal.

Matters set out in subsection (4) will be dealt with in the appointment, except where a settlement deed has been offered, as this provides a direct contractual route for claims. The appointment will align with subsection (5). Under subsection (6), the appointment will be made with the involvement of an independent body—the chief executive of the Civil Engineering Contractors Association; and the contract of appointment will stress the complete independence of the commissioner. With regard to subsection (7), the appointment process is under way, and HS2 Ltd expects to interview candidates this week, I believe.

Under subsection (8), the construction commissioner will provide an annual report and other reports as required on the activities of the construction commissioner’s office and its statement of accounts to the independent body, which will be made up of a variety of project stakeholders. It may be that thereafter the independent body will make the documents publicly available. Finally, under subsection (9), the appointment will continue to the end of construction, and it is anticipated that a full final report will be prepared.

I have not received representations about either increasing or reducing the £10,000 limit, but I would be keen to consider anything that provided a chance to look at the matter again. I suspect that the commissioner might be the best person to review that and make recommendations. I believe that the points that the hon. Gentleman made have been addressed and are superfluous. I hope that he will withdraw the new clause.

Andy McDonald Portrait Andy McDonald
- Hansard - - - Excerpts

I am extremely grateful to the Minister for that thorough analysis of the new clause. He referred to every subsection and it would be churlish of me not to acknowledge that those points have been addressed in full measure. I am reassured to know that there is a residual ability to progress larger claims by alternative means. I beg to ask leave to withdraw the motion.

Clause, by leave, withdrawn.

New Clause 23

Designing Euston as a single integrated Station

(1) The new high speed platforms to the west of the existing Euston Station must be designed as part of a plan for a single fully integrated Euston station which provides platforms for HS2, mainline and Crossrail 2 services.

(2) Full integration means, but is not limited to—

(a) east-west and north-south permeability, with at grade accessible routes across and around the station for pedestrians and cyclists accessing the local areas,

(b) integration into the existing local transport network, and

(c) the potential for over-site development across the whole Euston station site and tracks.

(3) In developing the design for Euston Station, the Nominated Undertaker must consult with—

(a) the local community and local businesses,

(b) the London Borough of Camden,

(c) passenger groups,

(d) the rail industry,

(e) Transport for London and the Greater London Assembly, and

(f) any other party which the Nominated Undertaker deems appropriate.—(Andy McDonald.)

This new clause requires the design for Euston Station to be approached in a holistic fashion, ensuring that plans for the HS2 platforms do not limit future integration with and redevelopment of the existing mainline station at Euston, nor with plans for a Crossrail 2 station in the area, or the potential for over-site development. It would require the Nominated Undertaker to consult widely on the design of Euston Station.

Brought up, and read the First time.

--- Later in debate ---
Thereafter, the register of undertakings will record undertakings given by the Secretary of State. New clause 24 would simply serve to reinforce those undertakings, assurances and commitments with the force of law. If the Minister can assure me that all the commitments contained within the Euston area plan and elsewhere, as described in the new clause, will have the force of law without appearing on the face of the Bill, or if he can assure me of their observance by the nominated undertaker, I may be persuaded not to push the new clause to a vote. I await his response with great interest.
Robert Goodwill Portrait Mr Goodwill
- Hansard - - - Excerpts

Euston is a tremendous opportunity with regard to HS2 and the other developments that will be taking place in the area. It is an opportunity that we should grab with both hands, to maximise its potential. I hope that Camden is signed up to that ambition too.

Local authorities up and down the line are in the process of moving from a “Stop HS2” stance to one of asking, “How can we maximise the benefit for our community?” I think that communities would have expected their local authorities and their councillors to take that initial line, but to then start to engage more fully at the necessary stage. Indeed, I have met with the leader of Camden Council, and she is someone with whom I can do business. We have seen the transformational effect that station development has had at King’s Cross, and I would like to see that echoed in what we do at Euston.

With regard to the specific wording that the hon. Gentleman referred to, I can reassure him that this is not designed to be a gagging order. This wording is an appropriate condition that is included in agreements where petition issues have been met, and aims to make sure that the same issues are not raised in the Lords at hybrid Committee stage. It should be remembered that as a planning authority Camden can object during the detailed design stage of the process.

Regarding new clause 23, I can assure the hon. Gentleman that we have always been cognisant of the need to integrate the new station with the existing transport networks in the area, and to augment them where necessary. On that basis, this clause is unnecessary, as our current proposals for the design of the HS2 Euston station are already designed to dovetail with various potential design concepts for the redevelopment of the conventional side of Euston station by Network Rail, at what we call the B2 stage of the station redevelopment. In particular, our current design, as already set out in the Bill, will enable future east-west permeability across the whole station, and enhancements to the foundations to support future oversite development on the new station.

The hon. Gentleman said that this was a funding challenge, but of course that funding will unlock tremendous development opportunities over the site. The design makes the necessary provision for future passenger connectivity to Crossrail 2, the latter being a strategy that has been developed in close collaboration with London Underground. Incidentally, of course the development at Euston will also result in a massive improvement to the facilities available for London Underground passengers, ensuring better passenger flows and a subway connection from Euston Square station, which currently involves crossing streets.

Furthermore, the design for Euston as set out in the Bill is already set to provide not only the new station for HS2 but sufficient additional capacity for interchange with London Underground and other transport networks, in order to serve HS2 growth as well as growth in underlying demand in the longer term. Indeed, when the first phase of HS2 is open, we anticipate around 30% of passengers alighting at Old Oak Common, as that will be a better station by which to access some of the London destinations and Heathrow airport. That will take some of the pressure off Euston. There may well be a good opportunity for some more development to be carried out by Network Rail while it makes use of the lack of pressure on that station, which is already one of the busiest in the country. It is the Government’s intention that Network Rail would, in this context, develop its own proposals to ensure a joined-up vision across the whole station and support the objectives for the surrounding area.

As for subsection (3) of the proposed new clause, we have provided assurances to the London borough of Camden and Transport for London about working with both these parties, along with Network Rail and the GLA, under the auspices of bodies including the Euston station strategic redevelopment board and the Euston integrated programme board. This will comprehensively address the hon. Gentleman’s objective here.

New clause 24 is unnecessary as the Bill already establishes a special planning regime for the approval of certain details, including the design and external appearance of stations in accordance with schedule 17. The London borough of Camden will be the determining authority for these approvals, and the Euston area plan will be material to its determination in so far as it is material to the matter for approval and the grounds specified in the Bill. Any oversite development above and around the station and tracks will be determined outside of Bill processes, under normal planning processes for which the London borough of Camden will be the determining authority.

The Euston area plan provides the local planning policy framework for deciding submissions for approval of relevant details in accordance with the planning regime established under schedule 17, for approval of over-site development and any other development outside the Bill powers. I should also note that we have of course been working closely with Transport for London to ensure that the approach to transport planning for London is joined up, and specifically that planning for passenger journeys from origin to destination is co-ordinated.

Many of the points I mentioned in my response to new clause 23 from the hon. Gentleman opposite are similarly relevant to new clause 25. Our current plans for the design of the HS2 Euston station already facilitate a variety of potential designs for the conventional station, allowing for the potential for connectivity with Crossrail 2, and providing for over-site development. Network Rail is committed to preparing a planning brief appropriate to the conventional side of Euston station, and is working closely with us and Transport for London to prepare proposals for the conventional station which have been co-ordinated with the new high-speed station. We support the wider vision for the Euston area. Those proposals will be promoted, funded and implemented through Network Rail’s normal control period infrastructure investment programme.

I believe that all the hon. Gentleman’s points have been addressed, so I hope that he will not press proposed new clauses 23 to 25.

Andy McDonald Portrait Andy McDonald
- Hansard - - - Excerpts

I am grateful to the Minister for his response. I will certainly not press new clause 24, given that he kindly set out that the authority will be Camden, which is greatly reassuring. Similarly, I will not press new clause 25, because the Minister has satisfied me in that respect.

My only concern is about new clause 23. Although he has gone a considerable way towards satisfying me on the issues raised in that clause, he did say that the intention was —I do not know what the words were—to encourage Network Rail to come forward with a plan for the mainline station. I do not wish to be churlish in any way, but that qualification seemed to dilute somewhat the import and intent of new clause 23. It is not something that has been secured, so for that reason, I wish to press new clause 23 to a Division. I am content, however, not to press new clauses 24 and 25.

Question put, That the clause be read a Second time.

Division 7

Ayes: 5


Labour: 5

Noes: 10


Conservative: 9

New Clause 26
--- Later in debate ---
I know that the rumbling of HGVs is a big issue for Camden residents, and I am most interested in what the Minister has to say. Given that the new clause is at one with the assurances given by HS2, if those assurances are to be worth any comfort to Euston residents, it is entirely consistent that such provision appear on the face of the Bill. I have framed the new clause in a way that reflects the reality of construction and in no way interferes with the operation of passenger services, so I trust it can be favourably received. I look forward to hearing from the Minister.
Robert Goodwill Portrait Mr Goodwill
- Hansard - - - Excerpts

I fully recognise and agree with the sentiment behind the new clause. It is for that precise reason that my officials have already agreed a binding assurance with the London Borough of Camden that we will maximise, as far as reasonably practical and within existing Bill powers, the volume of excavated and construction material from the construction of Euston station and approaches to be brought in and removed by rail, while balancing the wider environmental impact to the local community and passenger services. For that reason, the new clause is unnecessary.

In order to determine the level of material that could be removed by rail, further work is required with rail partners, the London Borough of Camden and Transport for London. To that end, we have further agreed to develop a plan together with the London Borough of Camden, the Greater London Authority and Transport for London for the bringing in and removal of excavated and construction materials to and from Euston station by rail. The plan will include the consideration of options that will require separate planning permissions that may be granted by the London Borough of Camden or the Greater London Authority.

I can be more helpful than the hon. Gentleman possibly anticipated on excavated materials that will need to be transported. I have some figures which relate to Euston and Camden and the central London and metropolitan area. We anticipate that the excavated material will be transported by three means: by rail, public highway haul or site haul, which means utilising the line of route to transport goods, whether by conveyor belt, by dumper trucks that do not go on the public highways, or by the rail which will be placed on the line for its operation.

In terms of the central London and metropolitan area, site haul will be 56%, or 16.9 million tonnes; rail haul will be 31%, or 9.46 million tonnes; and public highway haul will be 13% or 4 million tonnes. As the hon. Gentleman can see, that has dramatically reduced the amount of material that will impact on people as they drive their cars or ride their cycles or are pedestrians in the London area. The figures for the total of the phase 1 route will be 70% by site haul, 24% by public highway haul and only 6% by rail haul given the network. I confirm that, unfortunately, there is no opportunity to use river or canal. I think the figures will soon be published in response to a parliamentary question, posed by Lord Berkeley, and become a matter of public information. I hope the hon. Gentleman is reassured that, where possible, we are doing what we can.

It is still early days for construction materials coming on to site. We have not yet awarded contracts and are not sure from where some of the materials will be sourced. However, we will be doing everything we can to maximise the amount of materials that can come in by rail, as this will limit the impact on people living in Camden. That will be a priority on the whole line to Birmingham.

All the hon. Gentleman’s points have been addressed, and I hope the proposed new clause will be withdrawn.

Andy McDonald Portrait Andy McDonald
- Hansard - - - Excerpts

I am grateful to the Minister, but he has not gone as far as I expected. First, he is basically saying, “the assurances and our intent entirely fit with the import of the new clause.” I cannot for the life of me see why the new clause simply cannot be embraced. Among other things, the new clause would send a positive message to the people of Camden that the Government take the issue extremely seriously. The new clause would not only set out in great detail the Government’s intent, as contained in the assurance document, but would do so in the Bill.

Robert Goodwill Portrait Mr Goodwill
- Hansard - - - Excerpts

We have been here before on the assurances that have been given. I make it clear that, as with all assurances, the Secretary of State is accountable to Parliament. If someone believes that an assurance has been breached, the recourse is through Parliament.

Andy McDonald Portrait Andy McDonald
- Hansard - - - Excerpts

That does not negate the simple and principled point that the issue should appear slap bang on the face of the Bill. The Minister knows that disruption and pollution, which we will discuss, are significant issues for the people of Camden. Although he has given us a helpful breakdown of the figures and the methodologies for removing excavated materials from the site, he says that it is early days for the construction element. There can be no specifications for the likely figures for construction materials. That being so, it leaves a glaring gap in our knowledge of what is likely to happen. I can readily accept that the intention is to reduce road use, but this new clause would put that beyond doubt. With respect to him, the new clause is entirely consistent with the Government’s position. I am trying to be helpful by perhaps gaining some credit for the Government with the people of Camden, not only that their legitimate concerns are being rightly recognised, but that the Government are prepared to go so far as to place that assurance and guarantee slap bang where it belongs—on the face of the Bill.

Unless the Minister has been converted and will simply accept the new clause, I ask that it be put to a vote.

Question put, That the clause be read a Second time.

Division 8

Ayes: 5


Labour: 5

Noes: 10


Conservative: 9

New Clause 27
--- Later in debate ---
Andy McDonald Portrait Andy McDonald
- Hansard - - - Excerpts

I beg to move, That the clause be read a Second time.

There is only so much disappointment that an individual can take. I thought that I had been pretty persuasive. Nevertheless, can I have a go with another one? I trust that this will be relatively straightforward—I live in hope.

The new clause calls on the nominated undertaker to conduct meaningful engagement with communities living and working along the London-west midlands route. It is self-explanatory. It simply requires the nominated undertaker to have regard to commitments and undertakings given to the London Borough of Camden and any other relevant party to engage and consult with the communities along the route.

There are two points to make. First, there has been comprehensive and in-depth engagement with communities thus far, through the good offices of the excellent Select Committee and that exhaustive process of listening to the petitions and requests for amendments, ameliorations and compensations. The new clause would require the nominated undertaker to engage consistently and continuously with such communities once the work was under way. The hope is that that would provide continuous reassurance to those communities that, even though HS2 has passed through all its necessary legislative processes, their concerns still rank with the promoter, the nominated undertaker and, indeed, the Secretary of State, and that there will be mechanisms for those communities to engage continuously with the promoter and others, so that any concerns that arise in the course of the construction or any opportunities that arise that require further attention are indeed given that attention and those concerns or opportunities will not be ignored or lost.

Secondly, with regard to the commitments and undertakings given to the London Borough of Camden and others, the new clause would go a long way towards embedding those undertakings and commitments in the programme for the entire duration of construction and operation, and would mean that there was a statutory confirmation that those commitments and undertakings have the force of law and must be properly regarded and observed.

I trust that this new clause is not considered contentious and can be agreed. I invite the Minister to confirm that he is agreeable to such a reasonable new clause, which is entirely consistent with his own comments to date and with the assurances given by the promoter.

Robert Goodwill Portrait Mr Goodwill
- Hansard - - - Excerpts

The hon. Gentleman says that there is only so much disappointment that he can take. I hope, in that regard, that he has started to prepare himself for the 2020 general election.

The new clause would introduce a requirement for something that the promoter is already obliged to do. As part of the development of the scheme and the Select Committee process, we have provided Camden with assurances on engagement with communities. Those assurances will be binding on the nominated undertaker. As with all assurances, the Secretary is State is accountable to Parliament should they not be delivered on. We recognise that communication and engagement are critical elements of delivering the construction works, and that high-quality engagement is essential to the nominated undertaker’s relationship with communities and stakeholders.

As the new clause recognises, we have given many commitments and undertakings to local authorities to consult the communities who live and work along the line of the HS2 phase 1 route. For example, an assurance has been agreed with the London Borough of Camden that requires the nominated undertaker to engage with the London borough on the development of a community engagement framework aimed at ensuring that all sections of the community, including businesses and individuals, are made aware of developments in relation to the construction programme and local impacts. Indeed, we both attended an event in Camden at which the new facility was launched. That not only provided an opportunity for local people to find out more about the development and the impact that it might have on their lives at various stages of the construction; there was also free hot-desking available for local businesses that might need to use those facilities, and I was very pleased, when we were there, to see so many local people availing themselves of the facilities.

With that in mind, I do not believe that the new clause needs to be included in the Bill. It would duplicate existing obligations, for which we are already accountable to Parliament. I hope, therefore, that the hon. Gentleman can withdraw the new clause and, possibly, avoid further disappointment.

Andy McDonald Portrait Andy McDonald
- Hansard - - - Excerpts

I am grateful to the Minister for that very interesting response. I assure him that the only thing that keeps me going is the knowledge that we will be successful in 2020. Perhaps I might be sitting where he is—who knows? Having said that, I hear what he says. He addressed my concerns most admirably, and I agree that, given that explanation and those assurances, it is not necessary for me to take this new clause further. I beg to ask leave to withdraw the motion.

Clause, by leave, withdrawn.

New Clause 28

Report of the cumulative impacts of HS2 works

(1) The Nominated Undertaker shall prepare a report on the cumulative impacts of the works on each community forum area along the line of route.

(2) The report shall outline the key concerns from community groups and if and how these concerns have been addressed.

(3) The report shall be laid before both Houses of Parliament no later than three months after the day on which this Act comes into force.—(Andy McDonald.)

This new clause requires the Nominated Undertaker to report on the likely cumulative impact of HS2 construction works on each community area along the route. This report is to reflect the concerns of the communities affected and outline the ways in which the Nominated Undertaker plans to address these.

Brought up, and read the First time.