Apr. 26 2024
Source Page: Monitoring air quality and dust on the HS2 Phase One and 2a route (February 2024)Found: Dioxide (NO 2) is undertaken at seven (7) locations in around highways within the RBKC as part of the management
Apr. 26 2024
Source Page: Monitoring air quality and dust on the HS2 Phase One and 2a route (February 2024)Found: Figure 2, include: Twyford to Greatworth Radstone and Hall Farm Topsoil Stripping Stockpile management
Apr. 26 2024
Source Page: Monitoring air quality and dust on the HS2 Phase One and 2a route (February 2024)Found: Solihull Metropolitan Borough Council Page 3 Sublot 5S Coleshill Heath Road Stockpile management
Apr. 26 2024
Source Page: Monitoring air quality and dust on the HS2 Phase One and 2a route (February 2024)Found: platforms, accommodation and slabs; I&M Installation: site-wide; Stockpiling: INNS stockpile management
Apr. 26 2024
Source Page: Monitoring air quality and dust on the HS2 Phase One and 2a route (February 2024)Found: Structures Utilities Installation of drainage and culverts Pond maintenance and water management
Apr. 26 2024
Source Page: Monitoring air quality and dust on the HS2 Phase One and 2a route (February 2024)Found: Stockpile management area including tipping and loading of ADTs and wagons, excavators, and dozers
Apr. 26 2024
Source Page: Monitoring air quality and dust on the HS2 Phase One and 2a route (February 2024)Found: presented in Appendix A, Figure 1, include: Canterbury Road Vent Shaft Concreting; Materials management
Apr. 26 2024
Source Page: Monitoring air quality and dust on the HS2 Phase One and 2a route (February 2024)Found: Dioxide (NO 2) was undertaken at thirteen (13) locations around highways within the CoW as part of the management
Apr. 26 2024
Source Page: Monitoring air quality and dust on the HS2 Phase One and 2a route (February 2024)Found: Euston Scissor Cut Limited groundworks; Concrete works; and Materials management.
Apr. 26 2024
Source Page: Monitoring air quality and dust on the HS2 Phase One and 2a route (February 2024)Found: and maintenance; ATFS: site preparation, bulk earthworks and permanent drainage; Water pumping management