Railways: Devon

(asked on 1st February 2016) - View Source

Question to the Department for Transport:

To ask Her Majesty’s Government, further to the remarks by Lord Ahmad of Wimbledon on 28 January (HL Deb, col 1405), what is the estimated cost of the next two years’ work by Network Rail that has now been cancelled on (1) the stabilisation of the cliff between Parsons and Teignmouth, and (2) breakwaters, groynes and revetments in the Dawlish area; and what are the new estimated completion dates for those works.


Answered by
 Portrait
Lord Ahmad of Wimbledon
Minister of State (Foreign, Commonwealth and Development Office)
This question was answered on 10th February 2016

No work on this study has been cancelled. Network Rail is currently progressing the Exeter to Newton Abbot geo-environmental study on the existing route via Dawlish to explore options which will reduce the chances of future route failure. The work will produce a short-list of options for further strengthening of the existing railway from Control Period 6 (CP6) (2019 to 2024) and beyond. It is due to be fully complete in May 2016 and will feed into the funding deliberations for CP6 and beyond.

Plans for Control Period 6 will be defined through the standard industry planning processes. These will take into account the recommendations of the Bowe and Shaw reviews and the re-profiling carried out by Sir Peter Hendy, along with the views of both PRTF and Network Rail .This process is led by Network Rail, with input from a wide range of stakeholders and funders, and covers the needs of each 5-year Rail Investment Strategy (RIS) with consideration of longer term requirements up to 2043.