High Speed 2 Railway Line

(asked on 23rd February 2017) - View Source

Question to the Department for Transport:

To ask Her Majesty’s Government how long they expect journey times to be for HS2 trains between London and (1) Crewe, (2) Edinburgh, and (3) Glasgow, when Phases 1 and 2A are completed, compared with the present Pendolino services, and whether they have estimated the time saving that would be gained if the HS2 trains incorporated a tilting mechanism and so could be used on the West Coast Main Line North of Crewe; and if so, what is that time saving.


Answered by
 Portrait
Lord Ahmad of Wimbledon
Minister of State (Foreign, Commonwealth and Development Office)
This question was answered on 9th March 2017

The proposed HS2 rolling stock tender specification does not preclude a bidder offering a tilting train solution. However, no tilting trains currently operate faster than 250km/h. HS2 Ltd assumes that tilting rolling stock could achieve a maximum operating speed on the high speed network of 300km/h rather than 360km/h for non-tilting rolling stock. This lower maximum operating speed would increase journey times on the dedicated HS2 network and could reduce network capacity. HS2 Ltd has assumed a number of minor line speed improvements on the northern West Coast Main Line for non-tilting rolling stock.

HS2 will not serve Edinburgh until Phase 2B opens. Existing and projected estimated journey times from London Euston are as follows:

Crewe

Glasgow

WCML Pendolino

1hr30

4hr17

Phase 1 non-tilt

1h08

4h00

Phase 1 tilt

Approx 1hr11

Approx 4h00

Phase 2A non-tilt

0h55

3h48

Phase 2A tilt

Approx1h01

Approx 3h51

Reticulating Splines