To ask Her Majesty's Government what estimate they have made of the (1) development, (2) construction, and (3) commissioning (a) times, and (b) costs, for the proposed underground Manchester HS2 station project; and what closures of the tram services in Manchester will be required during the construction.


Answered by
Baroness Vere of Norbiton Portrait
Baroness Vere of Norbiton
Parliamentary Secretary (HM Treasury)
This question was answered on 27th May 2022

The Manchester HS2 station project is for a surface station located on the same level as the existing Piccadilly Network Rail station. The HS2 surface station is based on a 6-platform surface station and will be accessed by a tunnelled route until the station approach. The Government is intent on working with HS2 Ltd to limit the level of disruption throughout construction.

HS2 Ltd expect the disruption to the Metrolink Ashton Line to last for around two years during which a bus replacement service will be provided between Ashton Cole and Manchester Piccadilly.