Question to the HM Treasury:
To ask His Majesty's Government what proportion of the total funding made available by The Crown Estate’s Supply Chain Accelerator programme was allocated to each of the successful organisations, as announced on 11 December.
The total funding made available in the second round of the Supply Chain Accelerator programme is £13,223,663. The proportion of that total allocated to each successful organisation is set out in the table below, including an aggregated figure for multi-project awards to the same organisation and an individual project breakdown.
All Supply Chain Accelerator awards are “up to” the amounts specified and are paid in arrears, subject to evidenced milestone delivery and costs incurred as projects progress.
Organisation | Amount awarded by The Crown Estate (£) |
ARC Marine | 250,000 |
Blyth Harbour Commission | 275,000 |
European Marine Energy Centre | 297,000 |
Eyemouth Harbour Trust | 1,479,000 |
First Corporate Shipping Ltd | 1,432,500 |
Ledwood Mechanical Engineering | 505,800 |
Morwind Ltd | 784,313 |
Offshore Renewable Energy Catapult Two projects: AmTech (£612,034) and String OE (£345,964) | 957,998 |
Offshore Solutions Group Limited – Celtic Sea | 411,210 |
Reflex Marine | 765,802 |
SeAH Wind Ltd Three projects: Pinpile (£1,500,000), Marshalling (£1,500,000) and Coating Booth (£1,500,000) | 4,500,000 |
Slipform Engineering Limited | 513,000 |
Sperra Seaworks | 1,052,040 |
Total (£) | 13,223,663 |