To ask Her Majesty's Government what are the limits of horizontal displacements within the defined limits of deviation which do not require Parliamentary approval for the starts or ends of works listed in the Schedules to the High Speed Rail (West Midlands–Crewe) Bill.


Answered by
Baroness Vere of Norbiton Portrait
Baroness Vere of Norbiton
Parliamentary Secretary (HM Treasury)
This question was answered on 16th December 2020

The parliamentary plans deposited with the High Speed Rail (West Midlands-Crewe) Bill show the Limits of Deviation (LoD) for the Scheduled Works (works which are listed in Schedule 1 of the Bill). A Scheduled Work can be constructed anywhere within their specific LoD. A Scheduled Work cannot be constructed outside of its LoD.