High Speed 2 Railway Line

(asked on 16th January 2017) - View Source

Question to the Department for Transport:

To ask the Secretary of State for Transport, how (a) many High Speed 2 trains per hour and (b) how long those trains would have been that served Meadowhall station under the route proposal previous to the present proposal.


Answered by
Andrew Jones Portrait
Andrew Jones
This question was answered on 19th January 2017

Our assumption was that for the previous proposal for serving South Yorkshire using Meadowhall station, up to two High Speed 2 trains per hour would have served Meadowhall to and from London and up to three to and from Birmingham. This is shown in HS2 Ltd’s Economic Case for Phase 2b (https://www.gov.uk/government/publications/hs2-phase-2b-crewe-to-manchester-west-midlands-to-leeds-economic-case, Appendix 2, p.42). These trains were assumed to be 200m trains apart from one London service of 400m.