Thameslink Railway Line: Rolling Stock

(asked on 13th April 2016) - View Source

Question to the Department for Transport:

To ask the Secretary of State for Transport, with reference to page two of the minutes of the Office of Rail and Road's board meeting on 22 September 2015, what the Govia Thameslink class 700 evacuation safety risks are that are referred to in those minutes.


Answered by
 Portrait
Claire Perry
This question was answered on 18th April 2016

The evacuation safety risk referred to in the Office of Rail and Road’s Board meeting on 22 September 2015 relates to evacuation from a class 700 new Thameslink train in the Snow Hill Tunnels within the Thameslink core section. The Office of Rail and Road has since confirmed that this is a matter for the London Fire Brigade to consider. Both Network Rail, the infrastructure operator, and Govia Thameslink Railway, the Thameslink train operator, have met with the Fire Brigade to discuss the matter. We understand that the London Fire Brigade is content with the measures that have been put in place.

Reticulating Splines