High Speed 2 Railway Line

(asked on 19th January 2016) - View Source

Question to the Department for Transport:

To ask the Secretary of State for Transport, if he will make a comparative assessment of the (a) cost of construction, (b) environmental effects and (c) construction time of High Speed 2 and a conventional electrified rail line along the High Speed 2 route.


Answered by
Robert Goodwill Portrait
Robert Goodwill
This question was answered on 22nd January 2016

A comparative assessment of the costs of construction and environmental effects of a High Speed and conventional electrified line was presented in the November 2013 HS2 Ltd report; London – West Midlands environmental Statement, Volume 5, Alternatives Report. The comparative assessment with a conventional line can be found from page 23 of the report which can be accessed online via

https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/259616/Vol1_Alternatives_Report_CT-002-000_wm.pdf